C A LA CENTER FOR ARCHITECTURE & URBANISM LOS ANGELES
UNIVERSITY OF SOUTHERN CALIFORNIA SELW YN TING | AR C H 302B 1 MARISA KECKEISEN | SLAN T ED
TABLE OF CONTENTS
DSP5 | 7 FINAL PROJECT
DSP3 | 54 MIDTERM DSP2 | 68 SCHEMES DSP1 | 88 SITE ANALYSIS
2
SB
DSP4 | 35 SECTION MODEL AND DETAIL
W 3r d St re et
3
wa yS tre et
Br oa d
4
SLANTED THE CENTER FOR ARCHITECTURE AND URBAN DESIGN LOS ANGELES, BETTER KNOWN AS CALA, IS A CENTER FOR NOT ONLY ARCHITECTURE, BUT A CENTER FOR EDUCATION, INSPIRATION AND CONNECTION. THE DESIGN FUNCTION IS BASED ON THE CONCEPT OF FOLDING PLANES. THE TWO EXTERIOR FOLDS ENCLOSE THE ENTIRE BUILDING, FRAMING THE GALLERY SPACES. HOWEVER THOSE MAJOR FOLDS BEND INSIDE CREATING INTERIOR SPACES. PROGRAMATIC SPACES ARE THEN INSERTED, CREATING A STRUCTUREOF ENCLOSED SPACES. THE TWO MAJOR EXTERIOR FOLDS ARE HIGHLIGHTED WITH A LARGE DOUBLE CURTAIN WALL SYSTEM THAT ENCLOSES THE BUILDING. THE GLASS ALLOWS DAYLIGHT AND VENITILATION THROUGHOUT THE ENTIRE BUILDING. THE LARGE GLASS CURTAIN WALL FACING BROADWAY, ALLOWS DAYLIGHT TO LIGHT UP THE ENTIRE STAIRCASE THAT IS LOCATED ON THE NORTHWEST SIDE OF THE BUILDING. THIS MAKES THE PATRON WANT TO CIRCULATE UP THROUGH THE BUILDING, FOLLOWING THE LIGHT. THE PROGRAM IS DSITRUBTED ACCORDING TO FUNCTION AND DAYLIGHT. GALLERY SPACES ARE SITUATED ON THE LOWER LEVELS, WHERE LEAST AMOUNT OF DAYLIGHT WILL EFFECT IT. OFFICES, CLASSROOMS, AND COLLABORATIVE AREAS ARE TOWARDS THE TOP, GIVING THE PERSON A VIEW OF THE CITY AND DAYLIGHT. STUDIES SHOW ONE IS MORE PRODUCTIVE WHEN SURROUNDED BY DAYLIGHT AND AN EXTERNAL VIEW. THE DRAMATIC VIEW FROM THE SIDEWALK MAKES THE BUILDING LOOKS NOT ONLY INVITING, BUT IT ENTICES THE PATRON TO COME SEE WHAT LIES IN THE INTERIOR FOLDS. THE FORM CONNECTS THE PERSON TO THE SPACE AND TO THE PROGRAM. THE SLANTED FOLDS CREATE A DESIGN THAT NOT ONLY CAPTURES THE CONCEPTS OF EDUCATION AND DESIGN AT CALA, BUT ENCOURAGES COLLABORATION AND EXPERIENCE.
5
6
DSP5
7
8
9
10
11
3D SITE CONTEXT
12
OFFICES
TRAINGING/ WORKSHOP
LIBRARY/WORK SPACES
CLASSROOMS
GALLERY 2
GALLERY 1
LOBBY/CAFE/GIFTSHOP
PROGRAM AND CIRCULATION
13
HVAC
14
STRUCTURE
FORM
VENTILATION
15
A
B
C
D
Parking 1/16" = 1'-0"
PARKING
16
A
A
UP
Storage
Men's Restroom Women's Restroom
Training Offices
B
B Gift Shop Conference Room
UP Reception
C
C -
Cafe
---
Lobby
D
D
1
1a
2
2a
3
Level 1
Parking
1/16" = 1'-0"
1/16" = 1'-0"
LEVEL 1
17
A
A
UP DN
Deck
DN
B
B
C
C -
Gallery 1
---
D
---
D
UP
1 Level 2
1/16" = 1'-0"
LEVEL 2
18
1a
2
3 Level 1 1/16" = 1'-0"
A
DN UP
B
UP
C DN -
-
Gallery
---
---
D
1 Level 3
1/16" = 1'-0"
1a
2
2a
3 Level 2
1/16" = 1'-0"
LEVEL 3
19
A
A
UP DN
Restroom
Restroom
B
B Classroom
UP DN
C
C
--Classroom
D
D
1 Level 4 1/16" = 1'-0"
LEVEL 4
20
1a
2
2a
3
A
A UP
B
B Workshop
DN
C
Restroom
Storage
C
UP -
-
---
--Offices
D
D
1 Level 6
1/16" = 1'-0"
1a
2
2a
3 Level 5 1/16" = 1'-0"
LEVEL 5
21
A
A
UP DN
DN
UP
B
B
Lecture Hall
C
C
Library
-
-
---
---
D
D
1
LEVEL 6
22
1a
2
2a
3
Level 5
Level 4
1/16" = 1'-0"
1/16" = 1'-
A
A UP
B
B Workshop
DN
C
Restroom
Storage
C
UP -
-
---
--Offices
D
D
1 Level 6
1/16" = 1'-0"
1a
2
2a
3 Level 5 1/16" = 1'-0"
LEVEL 7
23
A
DN
DN
B
C A
-
A
---
D
1 Level 7
1/16" = 1'-0"
LEVEL 8
24
1a
2
2a
3 Level 6
1/16" = 1'-0"
25
1 roof 115' - 0"
Level 7 99' - 0"
Level 6 85' - 0"
Level 5 73' - 0"
Level 4 58' - 0"
Level 3 37' - 0"
Level 2 15' - 0"
Level 1 0' - 0"
STREET ELEVATION
26
1a
2
2a
3
B
A
B
C
B
D
Roof 115' - 0"
Level 7 99' - 0"
Level 6 85' - 0"
Level 5 73' - 0"
Level 4 58' - 0"
Level 3 37' - 0"
Level 2 15' - 0"
Level 1 0' - 0"
BROADWAY ELEVATION
27
1
1a
2 B B
roof 115' - 0"
Level 7 99' - 0"
Level 6 85' - 0"
Level 5 73' - 0"
Level 4 58' - 0"
Level 3 37' - 0"
Level 2 15' - 0"
Level 1 0' - 0"
Parking -20' - 0" SECTION A-A SECTION A-A 1/8" = 1'-0"
28
2a
3
A
B
C
D A A
Roof 115' - 0"
Level 7 99' - 0"
Level 6 85' - 0"
Level 5 73' - 0"
Level 4 58' - 0"
Level 3 37' - 0"
Level 2 15' - 0"
Level 1 0' - 0"
Parking -20' - 0" SECTION B-B B-B SECTION 1/8" = 1'-0"
29
30
31
32
33
34
DSP4
35
36
Level 6 85' - 0"
roof 115' - 0"
SPIDER MULLION SYSTEM
Level 5 73' - 0"
BEAM GYP/STEEL STUD/INSULATION
I-BEAM
Level 7 99' - 0"
DOUBLE PANEL GLASS
SHEATHING/GYP
HVAC
Level 4 58' - 0"
SUSPENDED CEILING
COLUMN RUNNING THROUGH WALL
Level 6 85' - 0"
SPIDER MULLION SYSTEM
Level 5 73' - 0"3 Level 37' - 0"
DOUBLE PANEL GLASS
Level 4 58' - 0"
Level 2 15' - 0"
Level 3 37' - 0" Level 1 0' - 0"
Level 2 Parking 15' --0" -20' 0"
WALL SECTION
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
DSP3
55
SITE PLAN
56
3D VIEW
57
OFFICES
TRAINING/ADMIN
LIBRARY
CLASSROOMS GALLERY 2
GALLERY
MULTI-PURPOSE CAFE/LOBBY
PROGRAM
58
EGRESS, CIRCULATION, AND SIDEWALK INTERACTION
59
LEVEL 1
LEVEL 1
LEVEL 2
LEVEL 5
LEVEL 6
LEVEL 5 60
LEVEL 2
LEVEL 6
LEVEL 3
LEVEL 3 LEVEL 3
LEVEL 4 LEVEL 4 LEVEL 4
LEVEL 7
LEVEL 7 LEVEL 7 61
STREET ELEVATION
BROADWAY ELEVATION
62
63
LONG SECTION
64
SHORT ELEVATION
65
66
67
68
DSP2
69
SCHEME 1
70
PRECEDENT: AMERICAN FOLK ART MUSEUM, , NEW YORK, DILLER SCOFIDIO + RENFRO
71
72
73
74
75
SCHEME 2
76
PRECEDENT: THE NEW MUSEUM, NEW YORK CITY, SANAA
77
78
79
80
81
SCHEME 3
82
PRECEDENT: MUSUEM OF IMAGE AND SOUND, RIO DE JANEIRO, DILLER SCOFIDIO +RENFRO
83
84
85
86
OTHER DESIGN CONCEPTS
87
88
DSP1
89
90
91
8,300 SF.
80 FT.
3RD STREET ONE WAY
92
120 FT.
RAMP 15 DEG.
NARROW SIDEWALK
3RD STREET ONE WAY
93
El pollo loco
Residence + Clark’s gallery Residence building + Pharmacy
Bradbury building
South: Bradbury Building South East: Residence building + Pharmacy East: Residence + Clark’s gallery West: El pollo loco
94
Wells Fargo Pan American Loft
Million Dollar Theater
North West: Pan American Loft West: Wells Fargo South West: Million Dollar Theater
Views
95
10:00 AM
11:00 AM
12:00 AM
1:00 PM
96
2:00 PM
3:00 PM
4:00 PM
97
98
99