ASt001 casa per un regista

Page 1

ASthought #1 project:

architect:

Casa per un regista / Liverani & Molteni



ASthought #1 project:

architect:

Casa per un regista / Liverani & Molteni

book editor:

Martina Menconi


AsThought architecture from concept to built form Our main goal is to describe the design process, the architectural solutions and the detailing choices of a built work in a chronological order. The dream – that is also the ambition – is to tune at the best the structure of this on-line manual and to spread around its template in order to amplify the power of collecting and publishing in a such huge way that in a few years we could arrive at the largest open source and most browsed utility for architectural students not only in Europe.

series editors: Gennaro Postiglione Maddalena Scarzella

research team in Interiors @ Politecnico di Milano //////////////////////////////////////////////////////////////////// ASthought architecture from concept to built form http://asthought.polimi-cooperation.org follow https://twitter.com/ASthought1 http://vimeo.com/asthought http://www.issuu.com/asthought

book editor: Martina Menconi

All rights reserved © Authors All drawings © Liverani/Molteni All pictures © Liverani/Molteni this volume has no commercial purposes but only educational goals

Milan 2013


Content

Work facts

p.

7

Project description

p.

8

Commission

p. 12

Draft proposals

p. 18

First

p. 22

Second

p. 26

Third

p. 30

Fourth

p. 32

Fifth

p. 36

Final proposal

p. 40

Models

p. 54

Construction drawings

p. 58

Building site

p. 74

Photo gallery exteriors

p. 98

Photo gallery interiors

p. 114

Photo gallery surroundings

p. 124

Selected essay

p. 128

Appendix p. 132 office presentation

p. 134

book editor presentation

p. 136

Casa per un regista - Liverani/Molteni

5


image full size

Aerial photo of the place Š Liverani/Molteni 6

ASthought 1


Work facts

Project:

Director’s house

Address:

Via Gasperi , Casatenovo, LC

Area:

3.950 m²

Built area:

204 m²

Type:

Residential

Planned:

2007 – 2009

Built:

2009-2011

Cost:

520.000 euro

Client:

Private

Architect:

Studio Liverani/Molteni architetti - Andrea Liverani e Enrico Molteni

Collaborators:

Andrea Marelli, Sebastian Carella

Structural engineer:

Mauro Eugenio Giuliani ing. studio Redesco srl

Construction company:

Enrico Molteni & C. srl

Awards:

Finalist project Medaglia d’oro:

References: http://asthought.polimi-cooperation.org/tag/martina-menconi/ Project description:

Studio Liverani / Molteni architetti

History of Commission:

This house is located in a beautiful place surrounded by birches, pines, cedars and a magnolia.

When the owner decided to destroy the old house inherited he thought to build a new one,

confortable and functional for the holiday, specially for the winter, being near at the city but also

far away from it, like it was a isolated place. The owner are a filmaker and his sister so the name

of the house was given for this reason.

Main architectural ideas:

The idea was a modern and unique house, where the idea of space ​​ had to be a relationship

between inside and outside, which immediately created a harmony between interior and exterior.

Casa per un regista - Liverani/Molteni

7


Project description


Casa per un regista

La casa di campagna si situa in un terreno molto alberato e ampio all’interno di un residence degli anni ’60. Deve essere economica, pratica e richiedere poca manutenzione. Deve inoltre dare risposta a condizioni di uso e stile di vita differenti, tanto del regista come della famiglia della sorella.

L’idea iniziale individuata attraverso uno scambio di riflessioni con il cliente, parte dalla necessità di avere uno spazio centrale. Questo spazio ad uso comune collega funzionalmente le camere, raggruppate in due corpi separati, e unisce la cucina e l’ingresso, dando forma ad una pianta di tipo centrale, a croce, ma dal disegno arbitrario, con braccia di dimensione diversa e con geometrie irregolari dovute alla posizione aleatoria delle piante. Tale arbitrarietà é uno degli elementi di “chiarezza” del progetto.

L’intera struttura è impermeabilizzata con una membrana composta da una resina cementizia eliminando completamente gronde e pluviali che necessiterebbero di continue manutenzioni. La copertura a due falde modella la forma della casa disegnando prospetti dalle pendenze sempre diverse. La copertura lievemente inclinata, con pendenza della pari al 7%, porta l’acqua piovana a scendere lentamente lungo le pareti, raccolta da una gronda posta nel terreno. Il dilavamento produce un disegno decorativo sui muri. Con il passare del tempo gli aghi di pino e le foglie, come il grigio dello smog, aggiungeranno un nuovo strato “naturale” sulla superficie di resina bianca, liscia e perfettamente tesa.

Grandi vetrate a filo esterno per lo spazio comune e un loggiato di protezione con ante oscuranti a libro per le camere, la cucina e l’ingresso costituiscono i due differenti tipi di aperture della casa. Le grandi vetrate della sala si possono quasi completamente aprire per dare vita ad una sorta di grande portico centrale.

Internamente lo spazio della sala ha un tono più calmo e riposante ottenuto con una tonalità calda di grigio: pavimento autolivellante e tinteggiature uniformano perfettamente lo spazio, immerso tra gruppi di betulle, pini e cedri, e la presenza puntuale di una magnolia.

Casa per un regista - Liverani/Molteni

9


Internal view Š Liverani/Molteni 10

ASthought 1


Casa per un regista - Liverani/Molteni

11


Commission


images

Old house and pool, as found Š Liverani/Molteni

Casa per un regista - Liverani/Molteni

13


images

Outside of the old house Š Liverani/Molteni

14

ASthought 1


images

Outside of the old house, arcade Š Liverani/Molteni

Casa per un regista - Liverani/Molteni

15


Plant trees

Exterior view Š Liverani/Molteni

16

ASthought 1


Casa per un regista - Liverani/Molteni

17


Five draft proposals


Plans of the five draft proposals

Casa per un regista - Liverani/Molteni

19


Plans and models of the five draft proposals

20

ASthought 1


Final proposals Š Liverani/Molteni (see p.40)

Casa per un regista - Liverani/Molteni

21


0

First draft proposal, plan and front

First draft proposal, sketch

22

ASthought 1

1

5m


First draft proposal, plan as found and new plan

First draft proposal, plan of trees

Casa per un regista - Liverani/Molteni

23


First draft proposal, model

First draft proposal, concept and models

24

ASthought 1


First draft proposal, last model

Casa per un regista - Liverani/Molteni

25


Second draft proposal, plan and concept

Second draft proposal, render

26

ASthought 1


Second draft proposal, plan and fronts

Second draft proposal, model

Casa per un regista - Liverani/Molteni

27


Second draft proposal, render of roof structure 28

ASthought 1


Casa per un regista - Liverani/Molteni

29


Third draft proposal, plan

Third draft proposal, ground floor, first floor and roof

30

ASthought 1


Third draft proposal, model

Third draft proposal, concept plan

Casa per un regista - Liverani/Molteni

31


Fourth draft proposal, plan and concept

Fourth draft proposal, render

32

ASthought 1


Fourth draft proposal, sketch

Fourth draft proposal, render

Casa per un regista - Liverani/Molteni

33


Fourth draft proposal, plan and fronts

Fourth draft proposal, render

34

ASthought 1


Fourth draft proposal, model

Fourth draft proposal, model

Fourth draft proposal, model

Casa per un regista - Liverani/Molteni

35


Fifth draft proposal, plan functions

Fifth draft proposal, sketch

36

ASthought 1


Fifth draft proposal, plan and fronts

Fifth draft proposal, volume model

Casa per un regista - Liverani/Molteni

37


Fifth draft proposal, sketches

Fifth draft proposal, study of the colors with renders

38

ASthought 1


Fifth draft proposal, volume model

Casa per un regista - Liverani/Molteni

39


Final proposal


Exterior view, render

Casa per un regista - Liverani/Molteni

41


Existing plan (yellow) and project plan (red)

42

ASthought 1


Plan of the surroundings

Render of the volume

Casa per un regista - Liverani/Molteni

43


Roof plan and north front

Diagram of the internal space

44

ASthought 1


Plan with functions

Volumetric drawing

Casa per un regista - Liverani/Molteni

45


Ground floor, mq

Render front

46

ASthought 1


Ground floor, measures and functions

Casa per un regista - Liverani/Molteni

47


Drawings of fronts and sections

48

ASthought 1


Drawings of fronts and sections

Casa per un regista - Liverani/Molteni

49


Interior view, render 50

ASthought 1


Casa per un regista - Liverani/Molteni

51


Exterior view, render

52

ASthought 1


Casa per un regista - Liverani/Molteni

53


Models


Study models

Casa per un regista - Liverani/Molteni

55


Roofing proposal’s models

Pool, proposal model

56

ASthought 1


Pool, final proposal model

Casa per un regista - Liverani/Molteni

57


Construction drawings


LEGENDA 1 SIMES ZIP PLUS tonda 21cm diametro - in alluminio

TOTALE n. 6

posizionare come da disegno

2 SIMES MINREEF S5262 luce a 180°

TOTALE n. 8

posizionare a circa 1m dal confine e a 3m dall’angolo

3 PRESA ELETTRICA ESTERNA

TOTALE n. 1

Outdoor lighting plan

Casa per un regista - Liverani/Molteni

59


Ground floor, measures

60

ASthought 1


Ground floor, for disabled people

Casa per un regista - Liverani/Molteni

61


Roof plan

62

ASthought 1


Ground floor, internal height

Casa per un regista - Liverani/Molteni

63


Drawings of fronts

Drawing of all fronts together

64

ASthought 1


Casa per un regista - Liverani/Molteni

65


Some details of the windows, roof and floor 66

ASthought 1


LEGENDA 1 Resina Drycoat sp. 5mm 2 Travetto in CA, solaio tipo Plastbau Metal 26/8, sp totale 38cm 2b Alleggerimento solaio in polistirolo, solaio tipo Plastbau Metal 26/8 3 Polistirene, sp. 5cm 4 Montanto sezione 4x cm 5 Lana di roccia, sp. 4cm 6 Cartongesso 7 Parete portante in CA, sp. 20cm 8 Finitura pavimento in cemento levigato o similare 9 Pannello isolante per alloggiamento pavimento radiante 10 Getto in calcestruzzo alleggerito 11 Vespaio areato 12 Getto di magrone, sp. 15cm 13 Serramenti in legno 14 Canale di drenaggio 15 Plinto in CA 16 Cordoo in CA 17 Scossalina 18 Cemento a vista 19 Serramenti in acciaio 20 Profilo a U in acciaio 21 Condotto di areazione vespaio 22 Pavimentazione esterna 23 Terrano drenante (ghiaia) 24 Manto erboso 25 Guaina impermeabile

Casa per un regista - Liverani/Molteni

67


Detail of the wall

68

ASthought 1


Getto di Completamento

± 0,00 F

VERIFICARE con progetto ARCHITETTONICO

Serramento Facciata

80

30

IGLOO

15

Getto di Completamento

± 0,00 F

30

30

20

15

VEDERE TAV. S06 COPERTURA IN CLS

15

Getto di Completamento

± 0,00 F

30

30

variabile

60

15

15

4 ø 14

staffe ø 10 / 25

15

PIANTA 1+1ø8 correnti

53

1 + 1 ø 12 / 20

ø 10 / 20

1 + 1 ø 12 / 20 4 + 4 ø 10 correnti

4 + 4 ø 10 correnti

20

staffa ø 12 / 20 3 + 3 ø 10 correnti

SEZIONE =2=

1:25

73 20

SEZIONE

PILASTRI =P1= =P2=

1:25

1:25

PIEGATURA E QUOTE FERRI R 100

armatura tipica verticale 1 + 1 ø 10 / 20

ß

ø

ø8

ø 10

ø 12

R=

16

20

24

ANCORAGGIO FERRI

legature ø 6 / 40 oriz. x 25 vert.

armatura tipica orizzontale 1 + 1 ø 8 / 25

3 + 2 ø 12

10

10

armatura aggiunta verticale per 1,00 mt 1 + 1 ø 10 / 20

20

armatura tipica orizzontale 1 + 1 ø 8 / 25

70

91

105

ACCIAIO NERVATO fyk RETE ELETTROSALDATA fyk PRECOMPRESSIONE fptk

NOTE

12,5 m

5 ø ß

3,0 kN/cm² 43,0 kN/cm² 39,0 kN/cm²

Rck

kN/cm²

(rif. UNI 11104:2004 / UNI EN 206-1)

CLASSE DI ESPOSIZIONE COPRIFERRO FONDAZIONI MINIMO COPRIFERRO ELEVAZIONI MINIMO CONSISTENZA CALCESTRUZZO DOSATURA MINIMA CEMENTO DIMENSIONE MASSIMA INERTE VEDI NOTE GENERALI

90°

ß

DETTAGLIO =B=

1:10

ø 30

32

ø spirale = 0,25 ø barra

50 ø

30°

DETTAGLIO =A=

ø 26

CALCESTRUZZO (rif. UNI 11104:2004 / UNI EN 206-1)

Barre con L

a

R

ø 20

A 28 GIORNI

3ø 3 + 2 ø 12

90°

ø 16

MATERIALI

50 ø Barre correnti

20

20

legature ø 6 / 40 oriz. x 25 vert.

20

90°

10

armatura tipica verticale 1 + 1 ø 10 / 20

risvolto ortogonale al disegno (a)

R ß

20

6 + 6 ø12

6 + 6 ø12

80

SEZIONE =3=

1:25

4 ø 14

chiamate 4 ø 14

- 0,60

15

SEZIONE =1=

30 6 + 6 ø12

30

20

15

10

ø 10 / 20

30

20

35

R

20

23 / 33

53

43

ø 10 / 20 staffa ø 12 / 20

1 + 1 ø 12 / 20

R

35

43 23 / 33

96

chiamate 4 ø 14

ø 10 / 20

12

1 + 1 ø 12 / 20

70

ø 10 / 20

43 ø 10 / 20

30

1+1ø8 correnti

12

30 / 40

10

15 15

staffe ø 10 / 25

- 0,60

1+1ø8 correnti

10

4 ø 14

20

- 0,60

15

15 60

IGLOO

staffe ø 10 / 25 80

- 0,60

Getto di Completamento

5

IGLOO 30

IGLOO

3040 / 40

30

15

± 0,00 F

30

15

15

- 0,60

XC 2 35 mm 25 mm s4 280 kg/mc 15 mm

35 ø

1:10

Ancoraggio con piega

VEDERE TAV. S05 TR 2 TRAVE DI BORDO VEDERE TAV. S05 TR 1 TRAVE DI BORDO

VEDERE TAV. S05 TR 2 TRAVE DI BORDO

legature

1:25

SETTO M2

1:25

4 + 4 ø 10 correnti

SETTO M4

1:25

chiamate ø 10 / 20

armatura tipica verticale 1 + 1 ø 10 / 20

4 + 4 ø 10 correnti

SETTO M5

1:25

4 + 4 ø 10 correnti

SETTO M6

1:25

armatura tipica verticale 1 + 1 ø 10 / 20

chiamate ø 10 / 20

1 + 1 ø 12 / 20

15

15

30

1 + 1 ø 12 / 20

- 0,60

armatura tipica verticale 1 + 1 ø 10 / 20

30

1 + 1 ø 12 / 20

30

1 + 1 ø 12 / 20

legature

chiamate ø 10 / 20

chiamate ø 10 / 20

15

20

53 1 + 1 ø 12 / 20

armatura tipica orizzontale 1 + 1 ø 8 / 25

armatura tipica orizzontale 1 + 1 ø 8 / 25

armatura tipica orizzontale 1 + 1 ø 8 / 25

variabile

15 chiamate ø 10 / 20

armatura tipica verticale 1 + 1 ø 10 / 20

30

30 15

30

1:25

armatura tipica verticale 1 + 1 ø 10 / 20

1 + 1 ø 12 / 20

4 + 4 ø 10 correnti

SETTO M3

76

armatura aggiunta orizzontale per H / 2 1 + 1 ø 8 / 25

armatura aggiunta orizzontale per H / 2 1 + 1 ø 8 / 25 chiamate ø 10 / 20

1 + 1 ø 12 / 20

- 0,60

legature ø 6 / 40 oriz. x 25 vert.

armatura tipica verticale 1 + 1 ø 10 / 20

15

30 15

15

4 + 4 ø 10 correnti

4 + 4 ø 10 correnti

SETTO M1

chiamate ø 10 / 20

1 + 1 ø 12 / 20

30

1 + 1 ø 12 / 20

armatura tipica verticale 1 + 1 ø 10 / 20

legature

5 15

15

chiamate ø 10 / 20

armatura tipica orizzontale 1 + 1 ø 8 / 25

armatura tipica verticale 1 + 1 ø 10 / 20

legature

50

chiamate ø 10 / 20

legature armatura tipica orizzontale 1 + 1 ø 8 / 25

armatura tipica verticale 1 + 1 ø 10 / 20

legature armatura aggiunta orizzontale per H / 2 1 + 1 ø 8 / 25

armatura tipica orizzontale 1 + 1 ø 8 / 25

armatura aggiunta orizzontale per H / 2 1 + 1 ø 8 / 25

armatura tipica orizzontale 1 + 1 ø 8 / 25

legature

armatura aggiunta orizzontale per H / 2 1 + 1 ø 8 / 25

VEDERE TAV. S05 TR 1 TRAVE DI BORDO

15 legature

armatura tipica orizzontale 1 + 1 ø 8 / 25

VEDERE TAV. S05 TR 1 TRAVE DI BORDO

VEDERE TAV. S05 TR 1 TRAVE DI BORDO

armatura aggiunta orizzontale per H / 2 1 + 1 ø 8 / 25

VEDERE TAV. S05 TR 2 TRAVE DI BORDO

VEDERE TAV. S05 TR 2 TRAVE DI BORDO

4 + 4 ø 10 correnti

SETTO M7

1:25

4 + 4 ø 10 correnti

SETTO M8

1:25

Detail of the wall and internal partition

Casa per un regista - Liverani/Molteni

69


Some details of the window

70

ASthought 1


Forms of the windows and some costruction details

Casa per un regista - Liverani/Molteni

71


staffa travetto ø 6 / 150

12

4

4 ø 10

26

25

NOTE : * PRESCRIZIONI SOLAIO PLASTBAU

staffa rompitratta ø 5 / 25

8.5

staffa travetto ø 6 / 150 2 ø 16 / 2 ø 14 / 2 ø 12

- VEDERE SCHEDA TECNICA DEL PRODUTTORE - NO BANCHINAGGIO , SOLO ROMPITRATTA OGNI 1,70 mt (max) - PREVEDERE ALMENO n° 1 ROMPITRATTA TRASVERSALE per LUCI SOLAIO MAGGIORI a 5,00 mt

60

SEZIONE SOLAIO PLASTBAU METAL

staffa travetto ø 6 / 150

1:10

*

RETE ELETTROSALDATA ø 5 maglia 10 x 10 cm

*

30 5

15

staffa rompitratta ø 5 / 25

35

VISTA ASSONOMETRICA

ø 10 / 15 inf

/ 15 sup

inf

10

ø 10 / 15

ø 10

ø 10 / 15 inf

ø 12 / 20 inf

90°

ß

SEZIONE

1:50

ø8

ø 10

ø 12

ø 16

ø 20

ø 26

ø 30

R=

16

20

24

32

70

91

105

ANCORAGGIO FERRI / 15 inf

MATERIALI CALCESTRUZZO (rif. UNI 11104:2004 / UNI EN 206-1)

ø spirale = 0,25 ø barra

ACCIAIO NERVATO fyk RETE ELETTROSALDATA fyk PRECOMPRESSIONE fptk

A 28 GIORNI

Barre correnti

PIANTA

1:25

1:50

240

ø 12 / 20

25

5

ø 10 / 15 sup

100

RIPARTITI

NOTE

ø

RETE ELETTROSALDATA ø 5 maglia 10 x 10 cm

ø 12 / 20 sup

ø 10 / 15 sup

ancoraggio solaio PLASTBAU

30°

ß

90°

ß

legature

25

135

25

ø 10 / 15 inf

inf

legature ø 6 / 40 x 45 10

5 ø 12

35 ø Ancoraggio con piega

ø 10 / 15 inf

ø 12 / 20 inf

240

- PER IL TRACCIAMENTO DEI SETTI FARE RIFERIMENTO AGLI ELABORATI ARCHITETTONICI - PER L'ESATTA POSIZIONE DEI FORI FARE RIFERIMENTO AGLI ELABORATI ARCHITETTONICI / IMPIANTISTICI risvolto - TUTTI I FERRI SI INTENDONO RISVOLTATI IN ESTREMITA' SALVO DIVERSAMENTE INDICATO - PRIMA DEI GETTI, AVVISARE CON DOVUTO ANTICIPO LA D. L.

5

ø 10 / 15 sup

25

100

ancoraggio solaio PLASTBAU

5 ø 14

10

ø 10 / 15 inf

ø 14 / 20 inf

SEZIONE

25

25

ø 10 / 15 inf

1:25

140

25

135

ø 12 / 15

legature ø 6 / 45 x 45

sup

10 775

inf ø 16 / 15

ø 12 / 15 sup

25 240

5

ø 10 / 15 sup

25

PROGETTO ARCHITETTO

25

775

ø 16 / 15 inf

100

ancoraggio solaio PLASTBAU 25

135

25

ø 10 / 15 inf

PROGETTO STRUTTURE Indice

legature ø 6 / 40 x 45

E' vietata la riprodu documento senza autorizza

10

RETE ELETTROSALDATA ø 5 maglia 10 x 10 cm

565

ø 12 / 20 sup

25

565

Progettazione strutturale

ø 12 / 15 sup

ø 10 / 15 sup

25

legature

ø 14 / 20 inf

ENRICO MOLTENI ANDREA LIVERANI

5 ø 16

20 su p

ø 10 / 15 inf

inf

1:25

20

0/

ø1

4/

ø1

2/

SEZIONE ø1

ø1

0/

15

15

140 Progettazione strutturale

su

p

MAURO EUGENIO G

DETTAGLIO =S4=

1:50

Some details of the roof structure

72

ASthought 1

inf

DETTAGLIO =S3=

PIANTA

sup

inf

10

ø 10 / 15

1:50

liverani-molteni architetti ø 16 / 15 inf

ø 10 / 15

PIANTA

XC 3 25 mm s4 280 kg/mc 15 mm

NOTE GENERALI :

RETE ELETTROSALDATA ø 5 maglia 10 x 10 cm

ø 12 / 20 sup

(rif. UNI 11104:2004 / UNI EN 206-1)

CLASSE DI ESPOSIZIONE COPRIFERRO MINIMO CONSISTENZA CALCESTRUZZO DOSATURA MINIMA CEMENTO DIMENSIONE MASSIMA INERTE

25

ø 12 / 20 inf

DETTAGLIO =S2=

legature

kN/cm²

1,5 kN/m²

ø 12 / 20 sup 255

1:25

DETTAGLIO =S1=

ø 10 / 15 sup

25

SEZIONE

140

0,5 kN/m²

VEDERE NOTE GENERALI

255

10

3,0 kN/cm² 43,0 kN/cm² 39,0 kN/cm²

PERMANENTI ACCIDENTALI 12,5 m

5

sup

Barre con L

Rck

SOVRACCARICHI

50 ø

ø 12 / 20

a

R

ø

50 ø

PIANTA

90°

R

ø 12

5 ø 12

ø 12 / 20 inf

ø 10 / 15

ø 10

risvolto ortogonale al disegno (a)

R

ß

legature

355

10

RETE ELETTROSALDATA ø 5 maglia 10 x 10 cm

25

sup

legature ø 6 / 40 x 45

ø 12 / 20 sup

ø 10 / 15 sup 355

ø 12 / 20 sup

25

25

PIEGATURA E QUOTE FERRI

/ 20 sup

5

100

ancoraggio solaio PLASTBAU

650

ø 10 / 15 sup

545

P

R

SEZIONE ROMPITRATTA

25

DET

spille ø 6 / 50

2 ø 16 / 2 ø 14 / 2 ø 12

1:10

25

LA CONTINUITA' DELLA RETE ELETTROSALDATA NELLA CAPPA DEVE ESSERE GARANTITA LEGANDO I FOGLI CONTIGUI ATTRAVERSO DELLE SPILLE ø 6 passo 50 cm foglio 1 foglio 2 ( SOVRAPPOSIZIONE VIETATA )

/ 20 inf

staffa rompitratta ø 5 / 25

X

ARMATURA TRAVETTI SOLAIO PLASTBAU - 2 ø 16 per LUCE SOLAIO = 7,60 mt - 2 ø 14 per LUCE SOLAIO compresa tra 5,00 mt e 7,60 mt - 2 ø 12 per LUCE SOLAIO max 5,00 mt

ø 12

18

4 ø 10

Y

R

RETE ELETTROSALDATA ø 5 maglia 10 x 10 cm

Redesco Progetti srl

Progettazione impiantistica


260

40

180

330

190

TR 2

TR 1

140

40

20

550

40

1143

TR 7

201

LM

CO

100

177

O

20

TR 4

40

TV 1

520

TR 1

140

90 280

40

360

TR 2

TR 9

TR 3

720

125 90

TV 1

TR

6

40

60 700

780

TR 2

TR 5

1070

680

TR10

Y 20

100

8

90

X TR

710 40

50

10

90

TR 1 140

60

TR11

20

50

1270

TR

12 TR

12

70

90

13

14

0

TR

1

10

97

72

0

70

0

TR

2

90

PROGETTO ARCHITETTO

PROGETTO STRUTTURE

40

Indice

E' vietata la riprod documento senz autorizz

Progettazione strutturale

57

0

14

0

0

49

SOLAIO PLASTBAU METAL TIPO 26 / 8 40

SOLAIO IN CLS

ENRICO MOLTENI ANDREA LIVERANI liverani-molteni architetti

Progettazione strutturale

MAURO EUGENIO G Redesco Progetti srl

Progettazione impiantistica

Plan of the structure

Casa per un regista - Liverani/Molteni

73


Building site


Raising the walls Š Liverani/Molteni

Casa per un regista - Liverani/Molteni

75


Construction site Š Liverani/Molteni 76

ASthought 1


Casa per un regista - Liverani/Molteni

77


Raising the walls Š Liverani/Molteni

Raising the walls Š Liverani/Molteni

78

ASthought 1


Raising the walls Š Liverani/Molteni

Casa per un regista - Liverani/Molteni

79


Support of the roof © Liverani/Molteni

Structure of the roof © Liverani/Molteni

80

ASthought 1


Structure of the roof Š Liverani/Molteni

Structure of the roof Š Liverani/Molteni

Casa per un regista - Liverani/Molteni

81


Structure of the roof © Liverani/Molteni

Supports of the roof © Liverani/Molteni

82

ASthought 1


Supports of the roof Š Liverani/Molteni

Casa per un regista - Liverani/Molteni

83


84

Skylight roof © Liverani/Molteni

Roof and wall after the concrete casting © Liverani/Molteni

Roof and wall after the concrete casting © Liverani/Molteni

Roof and wall after the concrete casting © Liverani/Molteni

ASthought 1


Structure of the pool Š Liverani/Molteni

Structure of the pool Š Liverani/Molteni

Casa per un regista - Liverani/Molteni

85


Construction site Š Liverani/Molteni

Roof after the concrete casting Š Liverani/Molteni

86

ASthought 1


Layer of cement Š Liverani/Molteni

Layer of cement Š Liverani/Molteni

Casa per un regista - Liverani/Molteni

87


Pool after the concrete casting Š Liverani/Molteni

Layer of cement Š Liverani/Molteni

88

ASthought 1


Roof and walls after the concrete casting Š Liverani/Molteni

Casa per un regista - Liverani/Molteni

89


Windows Š Liverani/Molteni

Windows Š Liverani/Molteni

90

ASthought 1


Windows Š Liverani/Molteni

Windows Š Liverani/Molteni

Casa per un regista - Liverani/Molteni

91


Pool with catwalk © Liverani/Molteni

Resin layer © Liverani/Molteni

92

Resin layer © Liverani/Molteni

Resin layer © Liverani/Molteni

ASthought 1


Cleaning and painting the roof Š Liverani/Molteni

Cleaning and painting the roof Š Liverani/Molteni

Casa per un regista - Liverani/Molteni

93


Resin layer Š Liverani/Molteni

Resin layer Š Liverani/Molteni

94

ASthought 1


Resin layer Š Liverani/Molteni

Casa per un regista - Liverani/Molteni

95


Choice of color for the interior Š Liverani/Molteni

Choice of color for the interior Š Liverani/Molteni

96

ASthought 1


Choice of color for the interior Š Liverani/Molteni

Casa per un regista - Liverani/Molteni

97


Photo gallery exteriors


In front of the pool Š Liverani/Molteni

Casa per un regista - Liverani/Molteni

99


Window of living room Š Liverani/Molteni

100

ASthought 1


Windows of the rooms Š Liverani/Molteni

images

Pool Š Liverani/Molteni

Casa per un regista - Liverani/Molteni

101


Arcade in front of the pool Š Liverani/Molteni

102

ASthought 1


Pool Š Liverani/Molteni

Casa per un regista - Liverani/Molteni

103


Window of living room Š Liverani/Molteni

104

ASthought 1


Window of living room Š Liverani/Molteni

Casa per un regista - Liverani/Molteni

105


Window of living room Š Liverani/Molteni

Entrance Š Liverani/Molteni 106

ASthought 1


Window of living room Š Liverani/Molteni Casa per un regista - Liverani/Molteni

107


Exterior view Š Liverani/Molteni

108

ASthought 1


Casa per un regista - Liverani/Molteni

109


Exterior view © Liverani/Molteni

Exterior view © Liverani/Molteni 110

ASthought 1


Casa per un regista - Liverani/Molteni

111


Exterior view Š Liverani/Molteni 112

ASthought 1


Casa per un regista - Liverani/Molteni

113


Photo gallery interiors


Interior view from inside to outside Š Liverani/Molteni

Casa per un regista - Liverani/Molteni

115


Interior view from inside to outside Š Liverani/Molteni 116

ASthought 1


Casa per un regista - Liverani/Molteni

117


Living room Š Liverani/Molteni

Living room Š Liverani/Molteni

118

ASthought 1


Living room Š Liverani/Molteni

Casa per un regista - Liverani/Molteni

119


Living room Š Liverani/Molteni

Living room Š Liverani/Molteni

120

ASthought 1


Living room Š Liverani/Molteni

Casa per un regista - Liverani/Molteni

121


Living room Š Liverani/Molteni 122

ASthought 1


Room Š Liverani/Molteni

Bathroom Š Liverani/Molteni Casa per un regista - Liverani/Molteni

123


Photo gallery surroundings


Surroundings Š Liverani/Molteni

Casa per un regista - Liverani/Molteni

125


Surroundings Š Liverani/Molteni

Surroundings Š Liverani/Molteni 126

ASthought 1


Surroundings Š Liverani/Molteni Casa per un regista - Liverani/Molteni

127


Selected essay


Casabella number 813

Casa per un regista - Liverani/Molteni

129


Casabella number 813

130

ASthought 1


Casa per un regista - Liverani/Molteni

131



Appendix


Office presentation

134

ASthought 1


Andrea Liverani (1969) master UPC, (Barcellona) e Enrico Molteni (1969) Dottorato di Ricerca UPC, (Barcellona) fondano lo studio liverani/molteni architetti nel 1999 con sede a Milano.

Partecipano e vincono alcuni importanti concorsi di progettazione in Italia e all’estero, tra cui il Municipio di Seregno tuttora in costruzione. Tra le opere realizzate, la Casa ST ottiene diversi riconoscimenti, tra cui il Premio Piranesi 2004 (Slovenia), il Premio Nazionale In/Arch 2005, e il Premio dell’Accademia di San Luca 2006 con la prima mostra personale tenuta a Roma. Selezionati in diverse occasioni a rappresentare la nuova architettura italiana, tra le quali ricordiamo l’invito alla Cornell University e la mostra Wonderland, partecipano come progettisti alla X Biennale di Architettura di Venezia 2006 nel Padiglione Italiano. E.M. ha curato alcune pubblicazioni sull’opera di Álvaro Siza, in particolare sul tema abitativo. Professore nei corsi di progettazione alle università di Alghero e di Milano, invitato all’Accademia di Architettura di Mendrisio (CH) ove insegna stabilmente. Dal 2008 è membro del Comitato di Redazione della rivista Casabella.

Enrico Molteni (1969). Laurea presso il Politecnico di Milano (tesi in Danimarca, 1994). Tirocinio nello studio di Elias Torres/J.A. Martinez Lapeña a Barcellona. Phd presso la UPC, Barcellona. Ha curato pubblicazioni, mostre e diretto un video sull’opera di Álvaro Siza.

Andrea Liverani (1969). Laurea presso il Politecnico di Milano (tesi a Porto con A. Soutinho, 1994). Tirocinio tra Portogallo e Spagna, collabora tra gli altri con G. Vazquez Consuegra. Master presso la UPC, Barcellona.

Casa per un regista - Liverani/Molteni

135


book editor presentation

I am Martina Menconi, I was born in Milan on 1991. I’m currently attending the third year of University of Architecture at Politecnico di Milano.

I’am still studing but I’am very interested to face the new architecture current about the sostenibility. Infact this project takes care about the nature, specially considering that the new house has been built around the existing trees. Moreover this project, realized by Studio Liverani/Molteni, is the original result of collaboration between more architects.

In my opinion, a great project is done by most people working toghether and hard, I prefer to create to design a building or landscape by comparing the different ways of thinkin and ideas.

136

ASthought 1



Work facts

Project:

Director’s house

Address:

Via Gasperi , Casatenovo, LC

Area:

3.950 m²

Built area:

204 m²

Type:

Residential

Planned:

2007 – 2009

Built:

2009-2011

Cost:

520.000 euro

Client:

Private

Architect:

Studio Liverani/Molteni architetti - Andrea Liverani e Enrico Molteni

Collaborators:

Andrea Marelli, Sebastian Carella

Structural engineer:

Mauro Eugenio Giuliani ing. studio Redesco srl

Construction company:

Enrico Molteni & C. srl

Awards:

Finalist project Medaglia d’oro:

References: http://asthought.polimi-cooperation.org/tag/martina-menconi/ Project description:

Studio Liverani / Molteni architetti

History of Commission:

This house is located in a beautiful place surrounded by birches, pines, cedars and a magnolia.

When the owner decided to destroy the old house inherited he thought to build a new one,

confortable and functional for the holiday, specially for the winter, being near at the city but also

far away from it, like it was a isolated place. The owner are a filmaker and his sister so the name

of the house was given for this reason.

Main architectural ideas:

The idea was a modern and unique house, where the idea of space ​​ had to be a relationship

between inside and outside, which immediately created a harmony between interior and exterior.


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.