Hydrocarbons OffshoreTopsides capability and experience brochure | WorleyParsons

Page 9

Project Browse Basin Development Customer Woodside Energy Ltd Project Location Western Australia Phases The Browse basin field lies 300km offshore in a water depth of 400m. The gas reserves are considered high enough to support a dedicated LNG facility. Select has been assisting Woodside to determine the optimal development scenario to best meet its business objectives. Possible development scenarios that have been considered include gas export to new onshore LNG facilities in either Darwin, or the Kimberly, transport to the existing LNG facilities on the Burrup or possible offshore LNG options including floating facilities or fixed offshore structures in neighboring shallow water.

Project Jasmine Area Development Project Customer ConocoPhillips Project Location Central North Sea, UK Phases The North Sea Jasmine field was discovered in June 2006. The Jasmine development comprises a new wellhead platform tied back to the ConocoPhillips operated Judy platform via a new multiphase pipeline and new riser platform, bridge linked to the existing Judy platform. The Jasmine Wellhead Platform includes a test separator, flare, metering and will be supported by a new bridge-linked living quarters platform. WorleyParsons has been engaged by ConocoPhillips (as Operator) and their joint venture partners BG and ENI to perform FEL 2, FEL 3, detailed design and procurement services to develop the Jasmine field. Courtesy of ConocoPhillips

Project Shtokman Floating Production Unit Customer GazProm Project Locatio0n Russian Arctic Shelf Phases WorleyParsons performed the pre-Front End Engineering Design (FEED) services for the Shtokman Development in the Barents Sea. The Shtokman gas/condensate field is in the Russian sector of the Barents Sea about 600 kilometres northeast of the city of Murmansk. The production vessel is a ship-shape hull capable of withstanding the sea ice conditions that may occur at the site and topsides capable of processing 70 million cubic metres per day of gas plus associated liquids.

Project Equus Offshore Facilities Customer Hess Project Location Western Australia Phases WorleyParsons performed the pre-FEED services for the Equus Offshore Facilities in the NorthWest Shelf of Australia. The facilities comprise a semi-submersible production facility, including risers and moorings. The pre-FEED phase was executed by the Select / INTECSEA team in Australia. The offshore development in located 180km north of Exmouth, Western Australia, in water depths of over 1000m. The facility design flow rate is 325 MMscfd and includes gas / liquid separation, glycol regeneration, gas dehydration and gas / condensate export.

Offshore Topsides Capability & Experience | 9


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.