(13) What would be the ohms resistance measurement expected and actual when taken at the controller’s Circuit 1 terminal if, during an earlier digging activity, the (field) wire was nicked, but not completely cut at Point GG? (14) What would be the ohms resistance measurement expected and actual when taken at the controller’s Circuit 2 terminal if, during an earlier digging activity, the (field) wire was nicked, but not completely cut at Point GG?
The MGCSA thanks Andy Lindquist for his expertice and inight into electrical circutry. Andy owns and operates Links Systems Inc. and can be reached at alindquist@ linkssystemsinc.com.
Page 41