Update on Waterloo Estate Regeneration for Cotleigh Road Residents 19 October 2021

Page 1

H A V E R I N G ESTATE REGENERATION Welcome to the Update on Waterloo Estate Regeneration for Cotleigh Road Residents 19th October 2021

H A V E R I N G ESTATE REGENERATION AGENDA 1. Planning & Design 2. Update on Demolition Progress 3. Erith Presentation 4. Social Value 5. Project Programme 6. Contacts 7. Questions

H A V E R I N G ESTATE REGENERATION PLANNING & DESIGN

H A V E R I N G ESTATE REGENERATION PLANNING & DELIVERY UPDATE • Planning application approved at Strategic Planning Committee 17th June. • Detailed design to commence this year. • Demolition complete by Spring 2022.

H A V E R I N G ESTATE REGENERATION PLANNING & DELIVERY UPDATE Outline application area. Detailed application area (Phase 1) • Buildings 1 and 2. • St Andrews Road. Cotleigh Road Properties.

H A V E R I N G ESTATE REGENERATION PARAMETER PLANS- REDUCTION IN BLOCK 9 MASSING Arial view of reduced massing: • “Dog legs” removed from block 9 to maximise space between Cotleigh Road homes and new Waterloo Estate homes. • Dotted blue line indicates maximum massing of new blocks.

H A V E R I N G ESTATE REGENERATION Cotleigh RoadBlock 9 No 27RoadCotleigh No 44 Cotleigh Road No 34RoadCotleigh Cotleigh Road No 21 23 Cotleigh Road Block 9 REDUCTION IN BLOCK 9 MASSING Section view of reduced massing: • “Dog legs” removed from block 9 to maximise space between Cotleigh Road homes and new Waterloo Estate homes. • Dotted blue line indicates maximum massing of new blocks. x x x 8 7 5 25m 33m 5

H A V E R I N G ESTATE REGENERATION

UPDATE ON DEMOLITION PROGRESS

H A V E R I N G ESTATE REGENERATION A B C D Section Properties Start Finish Duration A 1 – 15 Queen Street, 10 – 24 Waterloo Road 27th September 15th October 3 weeks B 2 – 24 Queen Street 27th September 15th October 3 weeks C 8 – 30 St Andrews Road 18th October 12th November 4 weeks D 54 – 134 Queen Street 22nd November 10th December 3 weeks DEMOLITION PROGRESS

DEMOLITION PROGRESS

H A V E R I N G ESTATE REGENERATION

VIDEO

– asbestos

UPCOMING DEMOLITION deconstruction of existing buildings – high rise demolition to 15th November 2021. elements removal from existing buildings completion clearance has extensive of London required Havering Planning

nearing

• Removal of non-structural

H A V E R I N G ESTATE REGENERATION

and asbestos

been

ACTIVITIES • Continued

commence

and undertaken with full HSE endorsement. • Further Archaeological excavations overseen by Museum

Archaeologists as

by

Team.

November. Access

replaced

temporary

developed

secure

St ChurchAndrews

incorporate

H A V E R I N G ESTATE REGENERATION BOUNDARIES

Andrews Church

rear of

Hoarding facing St to designs with the Church. fences to be removed and with fence line supplied by LBH starting w/c13 boundary Wates to boundary with Heras fencing w/c 29th will to properties.

be required

Rear

new

th GaragesDecember.on

to be removed and

H A V E R I N G ESTATE REGENERATION WORKING HOURS • Monday – Friday: 8am – 6pm • Saturdays: 8am – 1pm • No working Sundays or Bank Holidays Staff may begin to arrive on site before these times and leave afterwards depending on the days activity, however no noisy works will take place outside of these hours. Staff arrival may be staggered due to Covid-19 restrictions.

Demolition

Waterloo & Queen St, Romford

Overall scope of works consist demolition and clearance of all structures highlighted within red line boundary.

Demolition Methods High Reach

Demolition will be progressive to each wing of the structure, floor by Thefloor.structure gaining its stability from the central core. The larger of the two wings demolished initially followed by the smaller side, with the core reduced at this time. Lower level works facilitated by conventional demolition excavators.

High Reach excavator will facilitate demolition as illustrated, with safety exclusion zones in place. High level dust suppression will be provided from high reach excavator and supporting MEWP.

Demolition Methods Traditionally Rigged Excavators • Traditional excavators (5-85 tonne) are adapted for demolition purposes • Specialist demolition attachments used to break, crush and cut elements of the building

Environmental Dust Suppression • An integral element of demolition is the control of dust arisings throughout the demolition process. • There are numerous methods of dust suppression, which include –• Fire Hose • Fire Engines • Moto Fog Dust Suppression Units • Dust Boss’ • Jets equipped to arms of High Reach

The Site houses 3no Live Noise, Dust and Vibration Monitoring units across the site, which will help us to ensure that our works are carried out in strict accordance with these guidelines

Environmental Environmental Monitoring • Demolition works are carried out under strict guidelines set by LB Havering •

Safety

H A V E R I N G ESTATE REGENERATION PREVIOUS POINTS RAISED • Parking • Pest Control • Window Cleaning

SOCIAL VALUE

H A V E R I N G ESTATE REGENERATION

H A V E R I N G ESTATE REGENERATION PROPOSED MEANWHILE USE SPACE • Areas identified for use • Parish centre • 8 – 28 St Andrews Road • 2 – 24 Queen Street • The Old School House • Option to provide dedicated parking for St Andrews Church

H A V E R I N G ESTATE REGENERATION MEANWHILE USE POTENTIAL PROPOSALS Proposals Include: • Community Hub • Growing spaces for Crowlands School • Creative Spaces • Hot desk space • Construction training • St Andrews Church parking Subject to approval by Havering Council. We will be engaging with residents about the proposals.

H A V E R I N G ESTATE REGENERATION Feb 21 Mar 21 Apr 21 May 21 Jun 21 Jul 21 Aug 21 Sep 21 Oct 21 Nov 21 Dec 21 Jan 22 Feb 22 Mar 22 PROJECT PROGRAMME - KEY MILESTONES • Monthly newsletters to be issued to residents. • Hard demolition commenced end of September and due to complete by Spring 2022. Demolition and enabling works commenced Wehereare Enabling works phase Hard demolition phase Demolition and enabling works completed Tower block to be demolished

H A V E R I N G ESTATE REGENERATION KEY CONTACTS: For any queries on the day to day activities on site (including anything urgent), please Neilcontact:Shaftain On Site Project Manager Wates Residential Mobile: 07729 105 019 Email: Neil.Shaftain@wates.co.uk For all Waterloo related queries, please contact: Paul Dwyer Residents Liaison Waterloo.Estate@glhearn.com01708Paul.Dwyer@havering.gov.ukofficer434130Mobile:0796539160

H A V E R I N G ESTATE REGENERATION QUESTIONS?