A R N E L L G I L B E R T O B E R C E R O
Hi! I’m Arnell.
I am an architectural and drafting technologist based in Surrey, BC. My career so far has led me to a diverse range of projects from construction detailing to master planning.
FABRICATION SCHEDULE TOP OF ROOF 183' - 5 5/16"
DETAIL NO.
D1
12 D12
6
DESCRIPTION
DETAIL NO.
GARAGE GRADE BEAM TYPICAL:
D6
sky lobby
3"Ø ADJUSTABLE STEEL TELEPOST ON 10"X30'30' CONCRETE FOOTING
2-20MM CONT. HORIZ. T&B 10M VERT @ 24" O.C. ON 6"X16" CONT. CONCRETE FOOTING REINF. WITH: 2-15M CONT. HORIZ.
REINF. WITH: 3-20M E/W
D7
D9 8' - 1 1/8"
12' - 6 15/16"
REINF. WITH: 20M CONT. HORIZ. T&B 3-15M HORIZ. 10M VERT @ 24" O.C.
OH TYP.
D14
STAIRS: RISE = 7 5/8" RUN = 10" 8' - 0" 3' - 6 3/16"
D7
D3
D8
2 - 15M CONT. HORIZ.
7 A8
T.O. BASEMENT FLOOR 156' - 3 7/8"
8 A8
D5
studio apartment
D12
D9
EXTERIOR WALL TYPICAL: FINISH AS PER ARCH DETAILS 1/2" PT STRAPPING C/W BUGSCREEN AND INTEGRAL FLASHINGS DBLE. 30MIN BUILDING PAPER 1/2" PLYWOOD SHEATHING 2X6 STUD WALL @ 16" O.C. R22 BATT INSULATION 6MIL POLY VB 1/2 GWB
DECK COLUMN FOOTINGS TYPICAL: 6X6 NO.2 PT DF POST ON 8X8X8 CONC. PED. HOOKED INTO 24X24X8 CONC. FOOTING REINF. W. 3-20M E/W T&B
D10
CROSS SECTION 1 1/4" = 1'-0"
ROOF TYPICAL: 235# ASPHALT COMPOSITE SHINGLES (OR AS PER ARCH DETAILS) 15# ROOFING FELT C/W ICE-SHIELD AT ROOF EDGE 1/2" PLYWOOD SHEATHING C/W STRUC. H-CLIPS ENGINEERED TRUSSES @ 24" O.C. R-60 LOOSE FILL INSULATION 6 MIL POLY VB 5/8" GWB
FLOOR TYPICAL OVER UNFINISHED BASEMENT: FINISH FLOOR 5/8 T&G PLYWOOD SHEATHING GLUED AND SCREWED IN PLACE FLOOR JOISTS AS PER ARCH DETAILS
SLAB THICKENING TYPICAL:
EXTERIOR GARAGE WALL TYPICAL: FINISH AS PER ARCH DETAILS 1/2" PT STRAPPING C/W BUGSCREEN AND INTEGRAL FLASHINGS DBLE. 30MIN BUILDING PAPER 1/2" PLYWOOD SHEATHING 2X4 STUD WALL @ 16" O.C. R14 BATT INSULATION 6MIL POLY VB 1/2" GWB
NOTE: BASEMENT SLAB DOES NO REQUIRE STEEL REINF.
6"X16" CONC. SLAB THICKENING TO FULL LENGTH OF LOAD BEARING WALL ABOVE REINF. WITH:
LINE OF EXISTING GRADE
4 A8
5 A8
T.O. FIRST FLOOR 165' - 2 5/8"
1 bedroom apartment
D11
MIN 1/4" GAP AT PERIMETER FILLED WITH: ASPHALT IMPREGNATED FIBREBOARD
30MIN BUILDING PAPER 2X4 STUDS @ 16" O.C. C/W PT SILL PLATE R14 (MIN) BATT INSULATION 6MIL POLY VB
D8
DETAIL DESCRIPTION NO.
CONCRETE SLAB ON GRADE (SOG) TYPICAL: 4" CONCRETE SLAB REINF. WITH: 10M @ 24" O.C. E/W 6MIL POLY VB 4" COMPACTIBLE CLEAN GRANULAR FILL
FOUNDATION WALL TYPICAL: 8X8'4" CONCRETE FOUNDATION WALL DAMP PROOF BELOW GRADE
2' - 0"
D10
2 bedroom 6 apartment A8
D2
COLUMN FOOTINGS TYPICAL:
8"X24" CONCRETE GRADE BEAM REINF. WITH:
ENGINEERED TRUSSES CEILING LINE 173' - 3 3/4"
DESCRIPTION
D13
GARAGE ROOF TYPICAL: 235# ASPHALT COMPOSITE SHINGLES (OR AS PER ARCH DETAILS) 15# ROOFING FELT C/W ICE-SHIELD AT ROOF EDGE 1/2" PLYWOOD SHEATHING C/W STRUC. H-CLIPS
D14
BALCONY TYPICAL DECK BOARDS: 5/4 X 6 RADIUS EDGE PT DECK BOARDS FASTENED W/ DECKING SCREWS PT DECK JOIST AS PER ARCH. DETAILS DOUBLE RIM JOIST AT ALL SIDES, SOLID BLOCKING AT PARALLEL JOIST EDGES @ 24"O.C. INSTALL MSTS-24 STRUC STRAP FROM FACE OF RIM JOIST TO TOP OF ALL JOISTS FACE MOUNTED DECK RAILINGS INSTALLED AS PER MFG. SPECS.
INTERIOR PARTITION TYPICAL: 2X4 STUD WALL @ 16" O.C. 1/2 GWB EA. SIDE
6X6 PT. WOOD POST POST BRACKET
2X4 PT SILL PLATE
8X8 CONCRETE PEDESTAL C/W 15M VERT. HOOKED INTO FOOTING
5/8"X6" ANCHOR @ 28" O.C. PT BOTTOM PLATE PINNED INTO SLAB @ 4" O.C.
12 D13
6
9' - 0"
T.O. GARAGE WALL 170' - 9 1/16"
T.O. GARAGE FLOOR 161' - 9 1/16" 8" MIN.
2
No.
SIDE
6"X1'6" SLAB THICKENING TO FULL LENGTH OF LOAD BEARING WALL ABOVE REINF. W. 2-15M CONT. HORIZ. 6 MIL POLY VB 4" COMPACTED GRANULAR FILL
GARAGE CROSS SECTION 1/4" = 1'-0"
5
D3 SLAB THICKENING 1/2" = 1'-0"
4
7
1/2" = 1'-0"
B.U. BEAM AS PER SPEC.
2X6 PT SILL PLATE
10M DOWELS @12" O.C.
3"Ø STEEL TELEPOST TYP.
5/8"X6" ANCHOR @ 48" O.C.
2-15M T&B C/W 10M TIES @18" O.C.
5/8"X3" ANCHORS
8'-4" CONCRETE FOUNDATION WALL REINF. W. 3-15M HORIZ. AND 10M VERT. @ 24" O.C. HOOKED INTO 6X16 CONT. FOOTING REINF. W. 2-15M CONT.HORIZ
4" DEEP CONC. SLAB 10"Øx8" CONC. PILE C/W 25M REINF. HOOKED INTO GR. BEAM
SIDE
4"Ø PERFORATED AND CLOTH COVERED RIGID PERIMETER DRAIN WITH 4" COVER OF DRAIN ROCK
skyD5 lobby DECK POST FOOTING
32 MPA 5" CONC. SLAB C/W 10M REINF. @12" O.C E.W. AND AT NOSING
FINISHED GRADE
D7
6HFWLRQ
D1 GARAGE GRADE BEAM 1/2" = 1'-0"
D11
LINE OF EXISTING GRADE
1' - 6"
CONCRETE COLUMN PAD (FOOTING) 24X24X8 C/W 3-15M REINF. EA. WAY
TOP
3
ENGINEERED TRUSSES
3 A8
8"X20" CONC. GRADE BEAM REINF W. 2-15M CONT. HORIZ. AND 15M VERT. @ 24" O.C. HOOKED INTO CONT. FOOTING REINF. W. 2-15M CONT. HORIZ.
18" MIN.
T.O. GARAGE ROOF 177' - 11 1/16"
0' - 6"
FINISHED GRADE
D2 FOUNDATION WALL 1/2" = 1'-0"
Project numb
0' - 5"
6
D4 CONCRETE STEP & LANDING 1/2" = 1'-0"
Date Drawn by
TOP
8
FI Bu
CONC. COLUMN PAD (FOOTING) 30X30X10 C/W 3-15M REINF. EA. WAY
Checked by
D6 COLUMN FOOTING 1/2" = 1'-0" Scale
TOWER 3RD - 10TH TYPICAL FLOOR PLANS
T OTAL 80 2-bedroom units 80 1-bedroom units 240 studio units
1:200M 2.5
5
10
20M
01 DRAFTING 8 SINGLE-DETACHED HOUSE
Construction Documents - Plans, Elevations, Sections, Details
10 ACADEMIC FACILITY
Construction Documents - Complete Architectural Set for Permits
14 MIXED-USE CONDOMINIUM Design Development Drawings
16 DORMITORY RENOVATION
Construction Documents - Complete Architectural Set for Permits
18 BEDROOM LOFTS
Construction Documents - Plans, Elevations, Details
20 EFFLUENT TREATMENT PLANT
Piping & Instrumentation Diagram, Plans, Sections, Isometrics
02 DESIGNS 24 UPD COLLEGE OF FINE ARTS STUDENT COMMONS Academic Support Spaces
28 SILID BALANGA
Mixed-Use Learning Commons
36 MAKE SPACE TODAY
Creative Co-Making and Retail Space
40 APARTMENT C
Studio Unit Interiors
44 MISCELLANEOUS WORK Architectural Visualization
+1 (236) 978 4460
arnell.bercero@student.kpu.ca
LinkedIn: gilbertagab
_DRAFTING
No.
Description
1
Date
A8 1
ZERO CLEARANCE GAS FIREPLACE
A8 48' - 7 1/2" 18' - 2 1/2"
1 A8
17' - 6 1/2"
11' - 4 1/2"
1' - 6"
48' - 7 1/2" 9' - 1 1/4"
9' - 1 1/4"
3' - 11"
7' - 1 1/2"
18' - 2 1/2" 18' - 2 1/2"
9' - 1 1/4"
6' - 0" 11' - 4 1/2"
9' - 1 1/4"
3' - 11"
7' - 1 1/2" 17' - 6 1/2"
6' - 6"
9' - 1 1/4"
3' - 11"
7' - 1 1/2"
6' - 6"
5' - 4 1/2" DN
1' - 6" 6' - 0"
11' - 4 1/2"
5' - 4 1/2"
1' - 6"
6' - 0"
23' - 5"
10 Main Bath
9
10
9
5 10
Bedroom 1
11 6
5
6
5
6
2' - 6 1/4"
5' - 5 1/2"
2' - 6 1/4"
Bedroom 2 8
7 Bedroom 1 7 1
1
6' - 2 3/4" 11' - 7 3/4" 6' - 2 3/4"
7'X16" O.H. GARAGE DOOR
6' - 2 3/4"
12
11' - 7 3/4"
8 Bedroom 2
13
12
8 1
2' - 4 1/2" 2' - 4 1/2"
9' - 7 1/4" 5' - 0 3/4"
2' - 4 1/2" 2' - 4 1/2"
5' - 0 3/4"
9' - 7 1/4"
47' - 1 1/2" 4' - 6 1/2"
9' - 7 1/4"47' - 1 1/2"
2' - 4 1/2" 2' - 4 1/2"
1' - 8 1/4"
8' - 0"
3' - 4 1/2" 3' - 0" DN 3' - 4 1/2"
3' - 4 1/2"
1' - 8 1/4"
8' - 0"
DN
DN
1
2
DN
5 Entry
Living Room
1 DN Entry
2 Living Room
1
2
DN 6' - 1 1/2" DN
15' - 0" 7' - 6"
6' - 1 1/2"
7' - 6"
6' - 1 1/2"
2
2 7' - 6"
7' - 6"
2
1' - 10 1/2"
7' - 6" 15' - 0" 15' - 0"
7' - 6"
1' - 10 1/2" 1' - 10 1/2"
FIRST FLOOR PLAN 1/4" = 1'-0"
1
FIRST FLOOR PLAN 51' - 4"= 1'-0" 1/4"
51' - 4"
2' - 0"
11' - 8 1/2"
2' - 0"2' - 0"
GARAGE FLOOR PLAN 2 1/4" = 1'-0"
28' - 2 1/2"
6
2' - 0"
6
2' - 0"
2' - 0"
2' - 0"
2' - 0"
No.
Description
2' - 0"2' - 0"
2' - 0"
2' - 0"
FIRST FLOOR PLAN 1 1/4" = 1'-0"
2' - 0"
Date
2' - 0" 2' - 0"
PRE-ENGINEERED ROOF TRUSSES @24" O.C. INSTALLED AS PER MANUFACTURERS SPECS.
REF.
6
6
6
6 6
6
B3
6
39' - 11 39'1/2" - 11 1/2"
RIDGE LINE
6
B1
DW
28' - 2 1/2"
RIDGE RIDGE LINE LINE
ZERO CLEARANCE GAS FIREPLACE
B3
B3
Project number Date Drawn by
GARAGE ROOF PLAN 2 ROOF FRAMING PLAN 3 1/4" = 1'-0" 1/8" = 1'-0"
Checked by
A2
00 2023 OCT 17 Arnell Bercero Checker
SINGLE-DETACHED HOUSE Scale
No.
Description
As indicated
10/17/2023 5:28:48 AM
B3
2' - 0"2' - 0"
B3
B2
6
RIDGE LINE
6
6
FINAL PROJECT Floor Plans
B3 B2
RIDGE LINE
6
CADD-1250
2' - 0"
8' - 1"
Living Room
Entry
1 22
11' - 8 1/2"
Date
Construction Documents - Plans, Elevations, Sections, Details
8
2' 8' - 0" - 1"
3' - 4 1/2"
1 1
ROOF PLAN 1/4" = 1'-0" ROOF PLAN 1/4" = 1'-0"
35' - 9"
2' -1'3"- 9" 2' 1' - 3" 9" 1' - 9"
DW DW DW REF.
3
8' - 0"
47' - 1 1/2"
B6
35' - 9"
1 4' - 6 1/2"
3' - 10 1/2"
5' - 5"
3' - 0" DN
DN5
1 4' - 6 1/2"
5' - 0 3/4"
3 Dining Room 1' - 8 1/4"
3' - 4 1/2"
5
13
5' - 5"
1
Bedroom 2
13
5' - 5"
11' - 7 3/4"
23
12
3' - 0" 3' - 4 1/2"
5' - 5 1/2" 11
7
Bedroom 1
14
2' - 6 1/4"
35' - 9" 35' - 9"
10
11
5 11 5' - 5 1/2"
3
Dining Room
4'5'- -10 4' - 10 1/2" 2' 4' - 0"- 10 2' 1/2" - 0" 0" 1/2"
9
10
Main Bath
11
5 Pantry
Dining Room
2' - 8" 2' - 8" REF. REF.
10
11
5
Pantry
4
2' - 8"
8
Main Bath
Garage 13' - 1"
7
Pantry
5' - 5 1/2"
1
5' - 0"
3
4
4
5' - 2 1/4"5' - 2 1/4" 5' - 25'1/4" - 0"
3
4' - 4" 8
9
3 3
7
5' - 5 1/2"
2' - 0"
7
9 Ensuite
4
4 Kitchen
2' - 0"
PRE-ENGINEERED ROOF TRUSSES @24"O.C INSTALLED AS PER MFG. SPECS
9
9' - 8 1/4"
Ensuite
4'8- 4"
1
Kitchen
5' - 5 1/2"
7
1
4
2' - 0"
3
As indicated
2 A8
3
11' - 2 1/4" 11' - 2 1/4" 11' - 2 1/4"
6' - 5 1/2"
23' - 5"
9' - 8 1/4"
4' - 4"
6
5' - 2 1/4"5' - 2 1/4" 5' - 2 1/4"
35' - 9" 35' - 9"
Scale
4
4' - 6"
A2
35' - 9"
Checked by
6 Master Bedroom
6' - 8 1/4"6' - 8 1/4" 6' - 8 1/4"
Drawn by
ROOF FRAMING PLAN 1/8" = 1'-0"
3 Kitchen
Ensuite 10/17/2023 5:28:48 AM
Date
3
12' - 11 1/4" 12' - 11 1/4"12' - 11 1/4"
00 2023 OCT 17 Arnell Bercero Checker
Project number
4
3 2
Master Bedroom
9' - 8 1/4"
2' - 8 1/4"2' - 83'1/4" - 6 3/4" 2' -3'8-1/4" 62'3/4" - 8 1/4" 3' -2'6-2' 3/4" 8 -1/4" 8 1/4" 2'2'--881/4" 1/4" 2' - 8 1/4"
B3
11' - 7 1/2" 11' - 7 1/2" 11' - 7 1/2"
B3
B3
2
6
2' - 4 1/2"2' - 4 1/2" 4' -2'6"- 4 1/2" 4' - 6"
REF.
B2
4
3
Master Bedroom
FINAL PROJECT Floor Plans
B3 B2
2
2
CADD-1250
2' - 3"
DN
2
B3
4' - 0"
DN
2
4' -4'0"- 0" 4' - 0"
B3
DW
B1
PRE-ENGINEERED ROOF TRUSSES @24" O.C. INSTALLED AS PER MANUFACTURERS SPECS.
5' - 4 1/2"
8'2'- 1" - 7 1/4"2' - 7 1/4" 1/4" - 0" 4' - 2' 0"- 7 4'
9' - 1 1/4"
6' - 6"
48' - 7 1/2" 17' - 6 1/2"
ZERO CLEARA GAS FIREPLAC
ZERO CLEARA GAS FIREPLAC
ZERO CLEARA GAS FIREPLAC
7
7
Garage
12
12
14 Garage
6
4" ALUMINUM GUTTERS AND D.S. 235#COMB-FACES ARCHITECTURAL GRADE 2X8 SP. FASCIA ASPHALT COMPOSITE SHINGLE CONT. VENTED ALUM. SOFFITS 4" ALUMINUM GUTTERS AND D.S. 6" EXP. HARDI-PLANK SIDING 2X8 COMB-FACES C/W COMB-FACEDSP. SP.FASCIA TRIM AT CONT. VENTED ALUM. SOFFITS OPENINGS, CORNERS, AND
7'X16" O.H. GARAGE DOOR 14
12
12 7'X16" O.H. GARAGE DOOR
6
23
1
4
B6
23
1
2
22
22
B6
22
2
GARAGE FLOOR PLAN 1/4" = 1'-0"
11' - 8 1/2"
6
4
B6
3
CADD
DASHED GRADE STUCCO FINISH TO FINISHED ALL ABOVE-GRADE @ NORTH FOUNDATION WALL AREAS ELEVATION 160' - 3 31/32"
6
GARAGE FLOOR PLAN 1/4" = 1'-0"
2
6
6
11' - 8 1/2"
GARAGE FLOOR PLAN 2 1/4" = 1'-0" 6
Desc
INSTALL APPROPRIATE FLASHINGS AT ALL HORIZ. TRANSITIONS, DASHED FINISH TO BASE OF STUCCO WALL, AND ALL WINDOW ALL ANDABOVE-GRADE DOOR OPENINGS FOUNDATION WALL AREAS
2
11' - 8 1/2"
11' - 8 1/2"
11' - 8 1/2"
No.
6" EXP. HARDI-PLANK SIDING C/W COMB-FACED SP. TRIM AT OPENINGS, CORNERS, AND BAND BOARD INSTALL APPROPRIATE FLASHINGS AT ALL HORIZ. TRANSITIONS, BASE OF WALL, AND ALL WINDOW AND DOOR OPENINGS
3
11' - 8 1/2"
Desc
12
BAND BOARD
6
7'X16" O.H. GARAGE DOOR 23
12
No.
6
6
No.
Description
Date
No.
Description
Date
No.
Description
Date
FINISHED GRADE @ NORTH ELEVATION 160' - 3 31/32"
FINAL P CADD Elev FINAL P Elev
Project number Date
Drawn by
ANCE CE
2
NORTH ELEVATION 1/4" = 1'-0"
ANCE CE
2
ANCE CE
4
12 6
B3
DW
B3 ENGINEERED TRUSSES B3 B3
REF. DW REF.DW
B1
12' - 6 15/16"
B2 B3 B2
B2
B3
B3
3
B2
B3
3
D2
B3 B3
FINAL PROJECT CADD-1250 Floor Plans CADD-1250 FINAL PROJECT Date
Floor Plans FINAL PROJECT 00 2023 OCT 17 Floor Plans Arnell Bercero
Drawn by Project number LINE OF Checked by EXISTING GRADE Date Drawn by Project number Checked by Date
ROOF FRAMING PLAN 1/8" = 1'-0"
Drawn Scale by Checked by
ROOF FRAMING PLAN 1/8" = 1'-0"
Scale D7
5 A8
DETAIL NO.
GARAGE GRADE BEAM TYPICAL:
D6
8 A8
4 A8
A2 A2 A2
00 Checker 2023 OCT 17 Arnell Bercero 00 2023 Checker OCT 17 Bercero 7Arnell As indicated A8 Checker As indicated As indicated
Scale
D3
T.O. BASEMENT FLOOR 156' - 3 7/8"
2-20MM CONT. HORIZ. T&B 10M VERT @ 24" O.C. ON 6"X16" CONT. CONCRETE FOOTING REINF. WITH: 2-15M CONT. HORIZ.
REINF. WITH: 3-20M E/W
2 - 15M CONT. HORIZ.
D9
EXTERIOR WALL TYPICAL: FINISH AS PER ARCH DETAILS 1/2" PT STRAPPING C/W BUGSCREEN AND INTEGRAL FLASHINGS DBLE. 30MIN BUILDING PAPER 1/2" PLYWOOD SHEATHING 2X6 STUD WALL @ 16" O.C. R22 BATT INSULATION 6MIL POLY VB 1/2 GWB
DECK COLUMN FOOTINGS TYPICAL: 6X6 NO.2 PT DF POST ON 8X8X8 CONC. PED. HOOKED INTO 24X24X8 CONC. FOOTING REINF. W. 3-20M E/W T&B
CROSS SECTION 1/4" = 1'-0"
EXTERIOR GARAGE WALL TYPICAL:
Scale
FINISH AS PER ARCH DETAILS 1/2" PT STRAPPING C/W BUGSCREEN AND INTEGRAL FLASHINGS DBLE. 30MIN BUILDING PAPER 1/2" PLYWOOD SHEATHING 2X4 STUD WALL @ 16" O.C. R14 BATT INSULATION 6MIL POLY VB 1/2" GWB
D12
ROOF TYPICAL: 235# ASPHALT COMPOSITE SHINGLES (OR AS PER ARCH DETAILS) 15# ROOFING FELT C/W ICE-SHIELD AT ROOF EDGE 1/2" PLYWOOD SHEATHING C/W STRUC. H-CLIPS ENGINEERED TRUSSES @ 24" O.C. R-60 LOOSE FILL INSULATION 6 MIL POLY VB 5/8" GWB
FLOOR TYPICAL OVER UNFINISHED BASEMENT: FINISH FLOOR 5/8 T&G PLYWOOD SHEATHING GLUED AND SCREWED IN PLACE FLOOR JOISTS AS PER ARCH DETAILS
D10
1
D11
NOTE: BASEMENT SLAB DOES NO REQUIRE STEEL REINF.
SLAB THICKENING TYPICAL:
A
DETAIL DESCRIPTION NO.
MIN 1/4" GAP AT PERIMETER FILLED WITH: ASPHALT IMPREGNATED FIBREBOARD
D8
A
Scale Checked by
CONCRETE SLAB ON GRADE (SOG) TYPICAL: 4" CONCRETE SLAB REINF. WITH: 10M @ 24" O.C. E/W 6MIL POLY VB 4" COMPACTIBLE CLEAN GRANULAR FILL
FOUNDATION WALL TYPICAL:
6"X16" CONC. SLAB THICKENING TO FULL LENGTH OF LOAD BEARING WALL ABOVE REINF. WITH:
D5
COLUMN FOOTINGS TYPICAL: 3"Ø ADJUSTABLE STEEL TELEPOST ON 10"X30'30' CONCRETE FOOTING
30MIN BUILDING PAPER 2X4 STUDS @ 16" O.C. C/W PT SILL PLATE R14 (MIN) BATT INSULATION 6MIL POLY VB
T.O. FIRST FLOOR 165' - 2 5/8"
DESCRIPTION
8"X24" CONCRETE GRADE BEAM REINF. WITH:
REINF. WITH: 20M CONT. HORIZ. T&B 3-15M HORIZ. 10M VERT @ 24" O.C.
D14
Project number STAIRS: RISE = 7 5/8" RUN = 10"
ROOF B3FRAMING PLAN B3 1/8" = 1'-0"
DESCRIPTION
8X8'4" CONCRETE FOUNDATION WALL DAMP PROOF BELOW GRADE
OH TYP.
D8
B3
3' - 6 3/16"
3
D10
B3
B3
D1
2' - 0"
B2
6 A8
B3 B2
B3
CEILING LINE 173' - 3 3/4"
CADD-1250
B3
REF.
D9
DETAIL NO.
D7
8' - 1 1/8"
B1
PRE-ENGINEERED ROOF TRUSSES @24" O.C. INSTALLED AS PER PRE-ENGINEERED MANUFACTURERS ROOF TRUSSES SPECS. @24" O.C. PRE-ENGINEERED INSTALLED AS PER ROOF TRUSSES SPECS. MANUFACTURERS @24" O.C. INSTALLED AS PER MANUFACTURERS SPECS.
8' - 0"
D12
Date
WEST ELEVATION FABRICATION SCHEDULE 4 1/4" = 1'-0" TOP OF ROOF 183' - 5 5/16"
B1
Checked by Project number
WEST ELEVATION 1/4" = 1'-0"
Drawn by
NORTH ELEVATION 1/4" = 1'-0"
10/17/2023 10/17/2023 5:28:48 10/17/2023 AM 5:28:48 AM5:28:48 AM
D13
GARAGE ROOF TYPICAL: 235# ASPHALT COMPOSITE SHINGLES (OR AS PER ARCH DETAILS) 15# ROOFING FELT C/W ICE-SHIELD AT ROOF EDGE 1/2" PLYWOOD SHEATHING C/W STRUC. H-CLIPS
D14
BALCONY TYPICAL DECK BOARDS: 5/4 X 6 RADIUS EDGE PT DECK BOARDS FASTENED W/ DECKING SCREWS PT DECK JOIST AS PER ARCH. DETAILS DOUBLE RIM JOIST AT ALL SIDES, SOLID BLOCKING AT PARALLEL JOIST EDGES @ 24"O.C. INSTALL MSTS-24 STRUC STRAP FROM FACE OF RIM JOIST TO TOP OF ALL JOISTS FACE MOUNTED DECK RAILINGS INSTALLED AS PER MFG. SPECS.
INTERIOR PARTITION TYPICAL: 2X4 STUD WALL @ 16" O.C. 1/2 GWB EA. SIDE
6X6 PT. WOOD POST POST BRACKET
2X4 PT SILL PLATE
8X8 CONCRETE PEDESTAL C/W 15M VERT. HOOKED INTO FOOTING
5/8"X6" ANCHOR @ 28" O.C. PT BOTTOM PLATE PINNED INTO SLAB @ 4" O.C.
FINISHED GRADE
T.O. GARAGE ROOF 177' - 11 1/16" 12 D13
6
T.O. GARAGE WALL 170' - 9 1/16"
D1 GARAGE GRADE BEAM 1/2" = 1'-0"
9' - 0"
D11
LINE OF EXISTING GRADE
T.O. GARAGE FLOOR 161' - 9 1/16"
No.
Descr
SIDE
6"X1'6" SLAB THICKENING TO FULL LENGTH OF LOAD BEARING WALL ABOVE REINF. W. 2-15M CONT. HORIZ. 6 MIL POLY VB 4" COMPACTED GRANULAR FILL
8" MIN.
GARAGE CROSS SECTION 1/4" = 1'-0"
5
D3 SLAB THICKENING 1/2" = 1'-0"
D5 DECK POST FOOTING 1/2" = 1'-0" B.U. BEAM AS PER SPEC.
2X6 PT SILL PLATE
10M DOWELS @12" O.C.
3"Ø STEEL TELEPOST TYP.
5/8"X6" ANCHOR @ 48" O.C.
2-15M T&B C/W 10M TIES @18" O.C.
5/8"X3" ANCHORS
8'-4" CONCRETE FOUNDATION WALL REINF. W. 3-15M HORIZ. AND 10M VERT. @ 24" O.C. HOOKED INTO 6X16 CONT. FOOTING REINF. W. 2-15M CONT.HORIZ
D2 FOUNDATION WALL 1/2" = 1'-0"
CADD
4" DEEP CONC. SLAB 10"Øx8" CONC. PILE C/W 25M REINF. HOOKED INTO GR. BEAM
SIDE
4"Ø PERFORATED AND CLOTH COVERED RIGID PERIMETER DRAIN WITH 4" COVER OF DRAIN ROCK
4
7
32 MPA 5" CONC. SLAB C/W 10M REINF. @12" O.C E.W. AND AT NOSING
FINISHED GRADE
D7
2
1' - 6"
CONCRETE COLUMN PAD (FOOTING) 24X24X8 C/W 3-15M REINF. EA. WAY
TOP
3
ENGINEERED TRUSSES
3 A8
8"X20" CONC. GRADE BEAM REINF W. 2-15M CONT. HORIZ. AND 15M VERT. @ 24" O.C. HOOKED INTO CONT. FOOTING REINF. W. 2-15M CONT. HORIZ.
0' - 6"
23' - 5"
13' - 1"
23' - 5" 23' - 5"
235# ARCHITECTURAL GRADE WOOD SHINGLE SIDING ASPHALT COMPOSITE SHINGLE
14
7
13' - 1" 13' - 1"
A8
EAST ELEVATION 1/4" = 1'-0"
WOOD SHINGLE SIDING
Garage
3' - 10 1/2" 3' - 10 1/2" 3' - 10 1/2"
2
3
ROOF TRUSSES @24"O.C INSTALLED AS PER MFG. SPECS
2 A8
SOUTH ELEVATION 1/4" = 1'-0"
18" MIN.
6' - 5 1/2"6' - 5 1/2" 6' - 5 1/2"
2 A8
1
PRE-ENGINEERED ROOF TRUSSES @24"O.C INSTALLED AS PER MFG. SPECS PRE-ENGINEERED ROOF TRUSSES @24"O.C INSTALLED AS PER MFG. SPECS PRE-ENGINEERED
CONC. COLUMN PAD (FOOTING) 30X30X10 C/W 3-15M REINF. EA. WAY
Project number
0' - 5"
6
D4 CONCRETE STEP & LANDING 1/2" = 1'-0"
Date Drawn by
TOP
8
FINAL P Building
Checked by
A
D6 COLUMN FOOTING 1/2" = 1'-0" Scale
9
A
A B
D
A
A
10
FIFTH FLOOR PLAN
UNIVERSITY OF THE PHILIPPINES
UNIVERSITY OF THE PHILIPPINES
ODPI
REPUBLIC ACT 9266: Article IV, Section 33 These drawings, as instruments of service, are the property and documents of the University of the Philippines.
2455
2010
A
2010
A
B 1610
1610
1460
1460
A
585
1560
1560 GENERAL NOTES: 1. MALE GRANITE COUNTER= EMERALD PEARL 2. FEMALE GRANITE COUNTER= HIMALAYAN WHITE 3. TILE CODES: Y = MAR AMARILLO SOAP SOAP DISPENSER DISPENSER BG = VIG SOLIDO NOISE-LESS B NOISE-LESS BG HAND DRYER BG HAND DRYER W = LATINA BIANCO BL = MAR AQUA BG TOILET BG TOILET PAPER B = M. FAMA BROWN PAPER HOLDER HOLDER 4. MALE PARTITION COLORS: 675 510 675 510 FACING PANELS= BROWN DOORS & INNER PANELS= BLUE C 5. FEMALE PARTITION COLORS: FACING PANELS= BEIGE DOORS & INNER PANELS= BROWN E D E D 6. TOILET PARTITION ACCESSORIES ARE STAINLESS STEEL BRUSHED FINISH 585
A
D C
FEMALE - FRONT STUDIO LABS FEMALE - FRONT STUDIO LABS TOILET PLAN 5TH TO 7TH A TOILET PLAN - 5THFLOOR TO 7TH FLOOR
A 2010
2010
1560 2010
GENERAL NOTES: GENERAL NOTES: 1. MALE GRANITE COUNTER= EMERALD PEARL 2010 1. MALE GRANITE COUNTER= EMERALD PEARL M MIRROR 2. FEMALE GRANITE 2. COUNTER= HIMALAYAN WHITE HIMALAYAN WHITE FEMALE GRANITE COUNTER= NOISE-LESS 3. TILE CODES: HAND DRYER 3. TILE CODES: SOAP 510 600 Y = MAR AMARILLO = MAR AMARILLO DISPENSER Y TOILET BG = VIG SOLIDOBG = VIG SOLIDO PAPER HOLDER W W = LATINA BIANCO W = LATINA BIANCO B BL = MAR AQUA BL W W= MAR AQUA W N B = M. FAMA BROWN B = M. FAMA BROWN 4. MALE PARTITION COLORS: BG BG BG 4. MALE PARTITION COLORS: FACING PANELS= BROWN FACING PANELS= BROWN DOORS & INNER PANELS= BLUE DOORS & INNER PANELS= BLUE 5. FEMALE PARTITION5.COLORS: FEMALE PARTITION COLORS: FACING PANELS= BEIGE FACING PANELS= BEIGE DOORS & INNER PANELS= BROWN DOORS & INNER PANELS= BROWN 6. TOILET PARTITION 6. ACCESSORIES ARE TOILET PARTITION ACCESSORIESO ARE STAINLESS P STAINLESS STEEL BRUSHED FINISH STEEL BRUSHED FINISH
C
2455
2455
1640
1610
L
1610
TOILET PLAN - 5TH TO 7TH FLOOR 2455
TOILET PAPER HOLDER
Y
2010
BG
SCOPE OF WORK:
D
810
2010
BG
FIN. GROUND FLR LINE
COMPLETED WORKS 510 600 (NOT INCLUDED B INECONTRACT) SECTION
FLR. LINE 510 600 T&B FIN.
SECTION
B
TOILET PAPER HOLDER
TOILET PAPER HOLDER
1640
Y
FOR REFERENCE Y ONLY M M
1640
AL NOTES: E GRANITE COUNTER= EMERALD PEARL ALE GRANITE COUNTER= HIMALAYAN WHITE CODES: Y = MAR AMARILLO BG = VIG SOLIDO W = LATINA BIANCO BL = MAR AQUA B = M. FAMA BROWN E PARTITION COLORS: ACING PANELS= BROWN DOORS & INNER PANELS= BLUE ALE PARTITION COLORS: ACING PANELS= BEIGE DOORS & INNER PANELS= BROWN ET PARTITION ACCESSORIES ARE STAINLESS RUSHED FINISH
SECTION
MALE - FRONT STUDIO LABS
TOILET PLAN - 5TH TO 7TH FLOOR
2455
A
C
C
1340
FEMALE - FRONT STUDIO LABS
SECTION
B
D
1340
E
BG
2455
C
1545
A
810
A
510
W
400
1610
TOILET PAPER HOLDER
675
1340
B
BG BG
1460
585
SOAP DISPENSER NOISE-LESS HAND DRYER
2455
1545
1560
N
N
ACADEMIC FACILITY P
O P
O
Construction Documents - Complete Architectural Set for Permits
MALE - FRONT STUDIO LABS MALE - FRONT STUDIO LABS
11
57
900
30
E
450
46
STAIRS HANDRAIL
TYPICAL 4F-8F
A
STAIR PLANS
C
SPOT DETAIL
12
B
DETAIL SECTION
D
SPOT DETAIL
2.0mm TRANSLUCENT THERMOPLASTIC ROOFING SHEETS (CORRUGATED) 2.0mm TRANSLUCENT THERMOPLASTIC ROOFING SHEETS (CORRUGATED)
M ATRIUM
CONCRETE PEDESTAL FOR SOLAR PANELS CONCRETE PEDESTAL FOR SOLAR PANELS CONCRETE GUTTER CONCRETE GUTTER CONCRETE LEDGE CONCRETE LEDGE
NATURAL STONE FINISH NATURAL STONE FINISH 25mm THK x 1.5 PCF DENSITY 25mm THK POLYURETHANE x 1.5 PCF DENSITY SPRAYED-ON INSULATION SPRAYED-ON POLYURETHANE INSULATION
B
B
CONCRETE PLANTBOX
CONCRETE PLANTBOX
FIN. 7TH FLR LINE
FIN. 7TH FLR LINE
FIN. 7TH FLR LINE FIN. 7TH FLR LINE
B B
FIN. 6TH FLR LINE
FIN. 6TH FLR LINE
FIN. 6TH FLR LINE FIN. 6TH FLR LINE
DECORATIVE DECORATIVE ALUMINUM ALUMINUM PANEL PANEL
FIN. 5TH FLR LINE CONCRETE LEDGE CONCRETE LEDGE
FIN. 5TH FLR LINE
B
WALL SECTION DETAIL
B
WALL SECTION DETAIL
FIN. 5TH FLR LINE FIN. 5TH FLR LINE
B B
SECTION DETAIL SECTION DETAIL
13
sky lobby
2-bedroom units TOWER 1 80 50 1-bedroom units 1 bedroom apartment
2-bedroom units 2-bedroom units TOWER 1 80 WER 1 80 50 1-bedroom units 50 1-bedroom units sky lobby studio apartment
-bedroom units studio units
sky lobby
2-bedroom units TOWER 1 80 50 1-bedroom units
1 bedroom apartment
TOW
1 bedroom apartment
2 bedroom apartment
sky lobby studio apartment
WER 1
80 2-bedroom units 50 1-bedroom units
TOWER 1
80 2-bedroom units 50 1-bedroom units
studio apartment
1-bedroom units TOWER 2 30 120 studio units
30 1-bedroom units 1-bedroom units TOWER 2 WER 2 30 120 studio units 120 studio units 50 1-bedroom units 120 studio units
50 1-bedroom units 120 studio units
sky lobby
TOWER 3
sky lobby
TOWER 3
1 bedroom apartment
2 bedroom apartment
1-bedroom units TOWER 2 30 120 studio units
0TH T80OTAL 2-bedroom units 1-bedroom TOWER units ANS 80 240 studio units FLOOR PLANS TOWER OR PLANS 20M 30 1-bedroom units 1-bedroom units WER 2 120 studio units TOWER 25030 120 studio units 50 1-bedroom units 1-bedroom units 120 studio units 120 studio units T OTAL TH 80 2-bedroom units TOTAL TOWER 3RD - TOWER 10TH 3 80 2-bedroom units TOWER 3 1-bedroom units NS 80 80 1-bedroom units 240 studio units TYPICAL FLOOR PLANS LIFESTYLE KALINAW CENTER 240 studio units
TOW
sky lobby
50 1-be 120 stud
TOW
sky lobby
1:200M
TYLE CENTER 20M 2.5 5
Arch141 Final Plate | Prof. R.O. Yazon
TOWER 10 Prof. R.O. Yazon FLOOR PLANS
TOWE FLOOR PLAN 50 1-bedr
sky lobby
sky lobby
TOWER 20M FLOOR PLANS
120 studi
TOW
TOWER KALINAW LIFESTYLE CENTER TOWER 3RDCENTER - 10TH KALINAW LIFESTYLE BERCERO, Arch141 AGA FLOOR PLANS Final Plate | Prof. R.O. Yazon MIXED-USE CONDOMINIUM FLOOR PLANS Arch141 FinalTYPICAL Plate | Prof. R.O. Yazon
TO TA 80 2 80 1 240
sky lobby
14
50 1-bedroom units 120 studio units
50 1-bedroom units 120 studio units
TOWER 3
TOWER 3
Design Development Drawings - Floor Plans
1:200M 2.5
5
10
20
TOTAL AREA 121.5 sqm
7
SPACES
8
1 Foyer 2 Dining Room 3 Living Room
3
4 Kitchen 5 Gallery 6 Toilet and Bath 7 2nd Bedroom 8 Master Bedroom
5
2
9 Walk-in Closet
9
10 Master Bathroom
8
11 Laundry and Storage
4
11
1
7
6
1
6
9
TOTAL AREA 54 sqm
7
1
2 BEDROOM UNIT FLOOR PLAN
10
6
SPACES 1 Foyer
5
5 4
4
2 Living and Dining Area 3 Convertible Sleeping Area 4 Kitchen 5 Walk-in Closet 6 Master Bedroom 7 Laundry and Storage
2
3
2
3
STUDIO UNIT FLOOR PLAN 1
retractable divider
STUDIO UNIT FLOOR PLAN 2
convertible sofa/bed
different column placement
15 KALINAW LIFESTYLE CENTE
DORMITORY RENOVATION
Construction Documents - Complete Architectural Set for Permits
16
17
NOTES * VERIFY ON SITE
2x6" STEEL C CHANNELS ATTACHED TO WALL BY WELDED 2x2x4" MS ANGLE BRACKET W/ EXPANSION BOLTS.
1/2x8" T&G ENG'D WOOD PLANKS LAID PERPENDICULAR TO FLOOR FRAMING, FLOATING INSTALLATION ON 3/4" THK MARINE PLYWOOD SUBFLOORING
700
D
B
ID-07
872.5
85
900 700
2875*
872.5
50
2100
872.5
A
4500 D
ID-07
C
2875*
2205
SEE SHEET ID-06 (RAILING DETAIL) SEE SHEET ID-05 (STAIR DETAIL)
267
2120
200 EQ EQ EQ EQ EQ EQ
ID-07
2110*
872.5
JOIST SPACING AS PER ENGINEER'S SPECIFICATION, MAX 600MM O.C., BRIDGE @ MIDSPAN AS NEEDED
100
ID-06
700 2875*
NOTES
BEDROOM F LOFT
BEDROOM F LOFT
FLOOR PLAN 1 SPECIFICATIONS OF STEEL MEMBERS (E.G. THK, GAUGE,) SCALE 1 : 40 M. ID-02 AS PER ENGINEER'S APPROVAL
2
ID-02
BEDROOM F LOFT
FRAMING PLAN SCALE
A
1 : 40 M.
ID-02
ELEVATION SCALE
1 : 40 M.
ALL VISIBLE STEEL MEMBERS WITH PAINTED BLACK MATTE FINISH INTERIORS BY:
700 IDr. ANAIS SILVESTRE 100 650
PROJECT
R.A. 545 ART. 2 SEC. 25 (4) ALL DESIGNS, DRAWINGS, SPECIFICATIONS AND COPIES THEREOF, PREPARED AND FURNISHED BY THE ARCHITECT IN CONNECTION WITH THIS PROJECT, ARE INSTRUMENTS OF PROFESSIONAL SERVICE. ARE INSTRUMENTS OF PROFESSIONAL SERVICE, ARE THE PROPERTY OF THE ARCHITECT WHETHER THE WORK FOR WHICH THEY ARE MADE MAY BE EXECUTED OR NOT, AND ARE NOT TO BE REPRODUCED OR USED ON OTHER WORK EXCEPT BY WRITTEN AGREEMENT WITH THE ARCHITECT.
100
ARCHITECTURAL DESIGN BY:
Arch. Jun Benito
SHEET CONTENTS:
OWNER
DRAWN BY:
LGF BEDROOM F LOFT
FUEGO RESIDENCE
S4S K.D. SOLID WOOD LOCATION CLADDING ON 1x1" STEEL TUBULAR
REVISION:
SHEET NO.
AGB CHECKED BY: AMS DATE: 2018-12-17 HAND RAIL CLADDING FROM NOTES:
1x2" S4S K.D. SOLID WOOD, CHAMFERED AS SHOWN
ID-02
1x1" STEEL TUBULAR RAILING
700
700
2x2x4" WELDED MS ANGLE BRACKETS
550
300
LOFT STAIRS HANDRAIL
D
ID-05
DETAIL SCALE
1 : 5 M.
550
2x4" STEEL TUBULAR STAIR STRINGER
850
2 - 1x1" ANGLE BARS WELDED TO STAIR STRINGER
6x6" 6MM THK WELDED B.I PLATE ATTACHED TO FLOOR BY EXPANSION BOLTS
18
DETAIL A SCALE
LOFT STAIRS
IDr. ANAIS SILVESTRE ARCHITECTURAL DESIGN BY:
Arch. Jun Benito
C
1 : 20 M.
R.A. 545 ART. 2 SEC. 25 (4)
INTERIORS BY:
2 - 1x1" ANGLE BARS WELDED TO STAIR STRINGER
100 150
LOFT STAIRS
A
ID-05
2x6" S4S K.D. SOLID WOOD STAIR STEPS, CHAMFERED AS SHOWN, SLIP-RESISTANT FINISH
2400 9 EQ. TREADS
550
2400 9 EQ. TREADS
2x6" S4S K.D. SOLID WOOD STAIR STEPS, CHAMFERED, SLIP-RESISTANT FINISH. ATTACHED TO ANGLE BAR SUPPORTS.
ALL DESIGNS, DRAWINGS, SPECIFICATIONS AND COPIES THEREOF, PREPARED AND FURNISHED BY THE ARCHITECT IN CONNECTION WITH THIS PROJECT, ARE INSTRUMENTS OF PROFESSIONAL SERVICE. ARE INSTRUMENTS OF PROFESSIONAL SERVICE, ARE THE PROPERTY OF THE ARCHITECT WHETHER THE WORK FOR WHICH THEY ARE MADE MAY BE EXECUTED OR NOT, AND ARE NOT TO BE REPRODUCED OR USED ON OTHER WORK EXCEPT BY WRITTEN AGREEMENT WITH THE ARCHITECT.
ID-05
PROJECT
OWNER
DETAIL B SCALE
ID-05
SHEET CONTENTS:
REVISION:
DETAIL SCALE
DRAWN BY:
LOFT STAIRS DETAILS
FUEGO RESIDENCE LOCATION
LOFT STAIRS STEPS
E
1 : 20 M.
AGB CHECKED BY: AMS DATE: 2018-12-17 NOTES:
1 : 5 M.
SHEET NO.
ID-05
LOFT HANDRAIL
C
ID-05
50
85
50 120 120 120 120 120
S4S K.D. SOLID WOOD CLADDING ON 1x1" STEEL TUBULAR
2x2x1" WELDED MS ANGLE BRACKET ATTACH TO WALL BY EXPANSION BOLT
120 120 120 120 120
900
120 120 120 120 120
1/2x1" FLAT STEEL BAR
1/2x1" FLAT STEEL BAR
1/2" STEEL ROUND BAR, SPACED AS SHOWN
1/2" STEEL ROUND BAR
1x1" STEEL TUBULAR
DETAIL A SCALE
IDr. ANAIS SILVESTRE ARCHITECTURAL DESIGN BY:
NOTES
ALL DESIGNS, DRAWINGS, SPECIFICATIONS AND COPIES THEREOF, PREPARED AND FURNISHED BY THE ARCHITECT IN CONNECTION WITH THIS PROJECT, ARE INSTRUMENTS OF PROFESSIONAL SERVICE. ARE INSTRUMENTS OF PROFESSIONAL SERVICE, ARE THE PROPERTY OF THE ARCHITECT WHETHER THE WORK FOR WHICH THEY ARE MADE MAY BE EXECUTED OR NOT, AND ARE NOT TO BE REPRODUCED OR USED ON OTHER WORK EXCEPT BY WRITTEN AGREEMENT WITH THE ARCHITECT.
Arch. Jun Benito SPECIFICATIONS OF STEEL MEMBERS (E.G. THK, GAUGE,) AS PER ENGINEER'S APPROVAL
B
1 : 20 M.
R.A. 545 ART. 2 SEC. 25 (4)
INTERIORS BY:
1x2x4" WELDED MS ANGLE BRACKETS
LOFT RAILINGS
LOFT RAILINGS ID-06
1x1" STEEL TUBULAR
100
100
1x2x4" WELDED MS ANGLE BRACKETS
A
1 : 5 M.
S4S K.D. SOLID WOOD CLADDING ON 1x1" STEEL TUBULAR
EQ
775
EQ
SCALE
900
EQ
DETAIL
ID-06
PROJECT
OWNER
DETAIL B SCALE
1 : 20 M.
SHEET CONTENTS:
DRAWN BY:
AMS DATE: 2018-12-17
REVISION:
LOCATION
SHEET NO.
AGB CHECKED BY:
LOFT RAILINGS DETAILS
FUEGO RESIDENCE
ID-06
NOTES:
1 1/4" MS ANGLE BAR TRIM 1/2x4" ENG'D WOOD BASEBOARD
1x2x4" WELDED MS ANGLE BRACKETS BOLTED TO WALL 1/2x8" T&G ENG'D WOOD PLANKS, LAID PERPENDICULAR TO FLOOR FRAMING, FLOATING INSTALLATION ON 3/4" THK MARINE PLYWOOD SUBFLOORING
1/2x8" T&G ENG'D WOOD PLANKS, LAID PERPENDICULAR TO FLOOR FRAMING, FLOATING INSTALLATION ON 3/4" THK MARINE PLYWOOD SUBFLOORING
2x6" STEEL C CHANNELS ATTACHED TO WALL BY WELDED 2x2x4" MS ANGLE BRACKET W/ EXPANSION BOLTS
2x6" STEEL C CHANNELS ATTACHED TO WALL BY WELDED 2x2x4" MS ANGLE BRACKET W/ EXPANSION BOLTS WEB STIFFENER, AS NEEDED (PER ENGINEER'S SPECIFICATION)
1/2" THK MOISTURE RESISTANT GYPSUM BOARD CEILING
1/2" THK MOISTURE RESISTANT GYPSUM BOARD CEILING
1x1" MS ANGLE BAR TRIM WITH 1/2" SHADOW GAP
1x1" WELDED MS ANGLE BAR TRIM WITH 1/2" SHADOW GAP
LOFT FLOOR FRAMING
A
ID-07
LOFT FLOOR FRAMING
CONNECTION DETAIL A SCALE
B
1 : 10 M.
ID-07
CONNECTION DETAIL B SCALE
1 : 10 M.
1/2x4" ENG'D WOOD BASEBOARD
141 x141" WELDED MS ANGLE BAR TRIM
1/2x8" T&G ENG'D WOOD PLANKS, LAID PERPENDICULAR TO FLOOR FRAMING, FLOATING INSTALLATION ON 3/4" THK MARINE PLYWOOD SUBFLOORING
1/2x8" T&G ENG'D WOOD PLANKS, LAID PERPENDICULAR TO FLOOR FRAMING, FLOATING INSTALLATION ON 3/4" THK MARINE PLYWOOD SUBFLOORING
2x6" STEEL C CHANNELS ATTACHED TO WALL BY WELDED 2x2x4" MS ANGLE BRACKET W/ EXPANSION BOLTS
1x2x4" WELDED MS ANGLE BRACKETS BOLTED TO LOFT FRAMING
1/2" THK MOISTURE RESISTANT GYPSUM BOARD CEILING
1/2" THK MOISTURE RESISTANT GYPSUM BOARD CEILING
1x1" WELDED MS ANGLE BAR TRIM WITH 1/2" SHADOW GAP
1x1" WELDED MS ANGLE BAR TRIM WITH 1/2" SHADOW GAP LOFT FLOOR FRAMING
LOFT FLOOR FRAMING
C
ID-07
CONNECTION DETAIL C
SCALE
R.A. 545 ART. 2 SEC. 25 (4)
INTERIORS BY:
IDr. ANAIS SILVESTRE ARCHITECTURAL DESIGN BY:
Arch. Jun Benito
D
1 : 10 M.
ALL DESIGNS, DRAWINGS, SPECIFICATIONS AND COPIES THEREOF, PREPARED AND FURNISHED BY THE ARCHITECT IN CONNECTION WITH THIS PROJECT, ARE INSTRUMENTS OF PROFESSIONAL SERVICE. ARE INSTRUMENTS OF PROFESSIONAL SERVICE, ARE THE PROPERTY OF THE ARCHITECT WHETHER THE WORK FOR WHICH THEY ARE MADE MAY BE EXECUTED OR NOT, AND ARE NOT TO BE REPRODUCED OR USED ON OTHER WORK EXCEPT BY WRITTEN AGREEMENT WITH THE ARCHITECT.
ID-07
PROJECT
OWNER FUEGO RESIDENCE
LOCATION
CONNECTION DETAIL D SCALE
1 : 10 M.
SHEET CONTENTS:
DRAWN BY:
LOFT FLOOR FRAMING CONNECTION DETAILS REVISION:
AGB CHECKED BY: AMS DATE: 2018-12-17
SHEET NO.
BEDROOM LOFTS NOTES:
ID-07
Construction Documents - Plans, Elevations, Details
19
KWANTLEN POLYTECHNIC UNIVERSITY
CADD TECHNOLOGIES
EFFLUENT TREATMENT PLANT Piping & Instrumentation Diagram, Plans, Sections, Isometrics
20
21
_DESIGNS
UPD COLLEGE OF FINE ARTS
STUDENT COMMONS Academic Support Spaces
The CFA Student Commons is a 250sqm renovation project for the University of the Philippines Diliman - College of Fine Arts. The project repurposes an unused property of the college into a satellite study area. A program of spaces was developed thru consultations with the various stakeholders of the college. Included in the design is a study hall along with support spaces such as a child-care, counseling, and a meeting room. Additionally a retail area was provided for educational and art supplies.
24
1
2.5
5
10M
25
26
27
THESIS
28
GF Front Lobby
2F University-Hub Library
SILID BALANGA
Mixed-Use Learning Commons
This undergraduate thesis, advised by Arch. Johannes Chua and Arch. Tina Bulaong, was presented to the faculty of the University of the Philippines Diliman - College of Architecture in fulfillment of the requirements for the degree of Bachelor of Science in Architecture.
RA S
Commons for the Balanga City University
T.
NAR
The project was titled Silid Balanga: Learning
Hub. Its primary aim was to capitalize on the city’s information assets by offering a comprehensive range of facilities related to learning, development, and livelihood for the community.
The
project
also
sought
to
cultivate
collaboration among the students, educators, professionals, and the local government of 2 1
3RD 2ND FFL 1 : 200
CA
1ST FFL
D R IV P IT O L
E
1 THIRD FLOOR PLAN 1:200
5
10
20
40M
Balanga City.
29
Bal anga Univers ity Town
200 m
EXPLORING THE BUILT ENVIRONMENT Architectural Mapping
BATAAN PROVINCIAL CAPITOL
ST. JOSEPH CATHEDRAL
TOMAS DEL ROSARIO COLLEGE
BALANGA CITY HALL
BATAAN PENINSULA STATE UNIVERSITY
CAPITOL DRIVE
PLAZA HOTEL BALANGA CITY
BATAAN PEOPLES CENTER
BALANGA PUBLIC MARKET
30
GALERIA VICTORIA
SITE ANALYSIS
COMMERCIAL INSTITUTIONAL RESIDENTIAL EDUCATIONAL FACILITIES
COMMERCIAL INSTITUTIONAL TREND
OVER 10 YEARS 5-10 YEARS AGO 5 YEARS-PRESENT HERITAGE STRUCTURE
HEAVY MILD TRAFFIC TRAFFIC
LIQUEFACTION-PRONE
0 - 0.5M 0.5 - 1.5M 1.5M+
31
FORM PROGESSION
ZONING DIAGRAM ADMINISTRATION EDUCATIONAL EXHIBIT
5478m 2
COMMERCIAL PERFORMANCE GENERAL SUPPORT CIRCULATION OUTDOOR & LANDSCAPING
locate site with proper area
5F
ADMINISTRATION & OFFICES
explore maximum building size limit height appropriate to site context
4F
rationalize building form strengthen street facade continuity recess facade for views and pedestrian use
increase open spaces to 60% of site divide massing appropriate to human scale mix natural and built environment
FUNCTION SPACES & OFFICES
3F 2F
UNIVERSITY-HUB LIBRARY
2F GF
COMMUNITY HUB
GENERAL SERVICES
B1+ & PARKING open at street level to interest people solid-void silhouette for visual emphasis
32
33
ORIENTATION TO PREVAILING WINDS
BAY SECTION (SOUTH FACADE) LOWER ROOF APEX +23.6M
INSULATED GALVANIZED STEEL SHEET ROOFING ON STEEL PURLINS & TRUSSES FIBER CEMENT BOARD EGGCRATE BRISE SOLEIL
HOT AIR ESCAPES SPACES THRU OPEN STAIRWELLS AND COURTYARD
STEEL ROD SUPPORT AT EGGCRATE INTERSECTIONS ATTACHED TO REINFORCED WALL
AMIHAN / NORTHEAST PREVAILING WINDS
SUSPENDED ACOUSTIC CEILING TILES 5TH FFL +16.8M
CARPET TILES ON LOW-PROFILE RAISED FLOOR SYSTEM THIN BRICK VENEER ON REINFORCED CONCRETE MASONRY WALLS 4TH FFL +12.8M
6” CLEAR LOW-E GLASS BLADE JALOUSIE WINDOWS WITH WEATHER-SEALING, SCREEN AS NEEDED WHITE ALUMINUM COMPOSITE PANELS 3RD FFL +8.6M
HOMOGENOUS VINYL TILES
BUILDING FORM BENDS ITSELF TO ACCOMODATE FOR CROSS VENTILATION
CAST-IN-PLACE REINFORCED CONCRETE SLAB 2ND FFL +4.6M
1ST FFL +0.6M NGL +0.0M
ROUND CAST-IN-PLACE REINFORCED CONCRETE COLUMN CAST-IN-PLACE REINFORCED CONCRETE BEAM B1 FFL1 -3.5M
REINFORCED CONCRETE RETAINING WALLS B1 FFL2 -5.25M
ISOLATED COLUMN FOOTINGS WITH TIE BEAMS B2 FFL1 -7.00M
B2 FFL2 -8.75M
34
&URVV 6HFWLRQ WKUX :HVW 6SDFHV
1
ROOF PLAN 1 : 200
HABAGAT / SOUTHWEST PREVAILING WINDS
RADIATION ANALYSIS
kWh/m2
Southeast View
1500.00 < 1350.00 1200.00 1050.00
Radiation Analysis SILIDBALANGA_PHL 1 JAN 0:00 - 31 DEC 24:00
900.00 750.00
Analyzed Base Model
600.00
Diagrams show the amount of solar exposure received by the building over an entire year at its accurate coordinate location. Solar exposure from the east, south, and west facades are greatly reduced due to the eggcrate sunshading (concealed in analyzed model), and placement of emergency exits at exterior. The north facade receives little
450.00
exposure due to its orientation. The diagram shows the building form’s effectivity in 300.00
shading itself, as seen most clearly from the plan and perspective view.
150.00
6HFWLRQ
A more accurate base model with adjacent landscaping and structures is projected to demonstrate lower solar exposure levels.
0.00 >
MULTIPLE ELEMENTS BLOCK / DIFFUSE SUNLIGHT
EMERGENCY EXIT DOUBLES AS DEEP SHADING DEVICE
FIRE-RATED DOUBLE GLAZED LOW-E GLASS PANELS
OPERABLE CLERESTORY WINDOWS FOR RISING HEAT ESCAPE SMALL CANOPY TO CATCH AND REFLECT LIGHT TO INDOOR SPACE
FLOOR TO CEILING JALOUSIE WINDOWS FOR MAXIMUM VENTILATION
WEST FACADE TREATMENT 6HFWLRQ
CAVITY BETWEEN SUNSHADING AND BUILDING FOR VENTILATION, HEAT GAIN REDUCTION
2F Library Space
2F Discussion Rooms
&URVV 6HFWLRQ WKUX (DVW BASE / NORTH FACADE TREATMENT &RS\ 6WDLUV
SECOND SKIN PROVIDES BOTH HORIZONTAL AND VERTICAL SUNSHADING
TREE CANOPIES ALONG SITE SHADE WIND APPROACHING THE BUILDING
2F Commercial Space
EAST & SOUTH FACADE TREATMENT
35
2700
3950 1625
3800
1900
2250
700 22
900 415
2605 3200
900
DOWN
1180
2390
RETAIL AREA
2830
1315
MAIN ENTRANCE
780
STEP: -0.18m FFL
1500
CHB WALL 1000MM HEIGHT
750
650
360
2540
360
270
780
3055 DRY WALL 2300MM HEIGHT
3635
STEEL-FRAMED GLASS WALL
FF-1: 0.0m FFL
2305
FF-2: -0.1m FFL
3365
2675
STEEL-FRAMED GLASS WALL
265
CO-WORKING SPACE
5305
55
DOWN
365
ARTIST CONFERENCE ROOM
40°
10
1900
1050
L AL
FF-2: -0.15m
YW
STEP: -0.15m FFL
180
CHB WALL
DR
OUTDOOR / PHOTO AREA
2850
3000
2820
1900
TOOLS & MACHINES
750
FF-2: -0.1m FFL
3950
EXISTING BRICK CLADDING ON CHB WALL
TILE BACKSPLASH (1400mm HIGH)
725 700 1525
3900
STOCK LOCKER ROOM AREA
4000
2325
DARK GRAY SKIMCOAT IN MATTE SEALER
350
RUSTIC RECLAIMED DARK WOOD CLADDING
STEEL-FRAMED GLASS WALL
7425
T PLAN
STOCK LOCKER ROOM AREA
B-3
BOOKSHELF
STORAGE 60CM DEPTH
O/H BOOKSHELF
BOOKSHELF
OUTDOOR / PHOTO AREA
RAMP UP
B-13
A-2
B-14
A-1
50x90CM
B-8
B-10
B-6
CO-WORKING SPACE
B-15
B-20
B-7
B-12
B-5
COFFEE TABLE
B-6
B-9
ACCENT DIVIDER
B-21
ARTIST CONFERENCE ROOM
B-4
B-11
120x100CM 120x100CM
Responsibilities for the architectural and interior design project included working directly under the principal interior designer to produce interior / builtin details, conducting site surveys to provide as-built plans for the renovation, preparing contract drawings for building permit, project documentation, and coordination with the contractor on urgent decisions and construction bulletins. DINING AREA RAMP UP
PANTRY 50x250CM
PLANT SHELF B-18 A-21
A-22
B-16
50x90CM
A-23
CASHIER'S DESK
A-24
A-3
A-4
A-5
DISPLAY SHELVES
A-19
A-20
B-17
A-18
Property Line
Creative Co-Making and Retail Space
KIOSK
TOOLS & MACHINES
STORAGE 35CM DEPTH
B-22
60x94CM
STORAGE 70CM DEPTH
B-2
B-23
HANGING AREA
STORAGE 60CM DEPTH
TABLE 90x104CM
STORAGE 35CM DEPTH
PEG BOARD
STORAGE 70CM DEPTH
B-1
B-24
C-1 C-2 C-3 C-4
C-8 C-5
MAKE SPACE TODAY
N4°16'W - 30.00M
B-19
S85°44'W - 14.00M
C-6
C-7
C-9
C-10
C-11
3
STEP UP
LADDER 50X60CM
Secondary roles included sourcing finish materials from suppliers.
A-17
WORKTABLE 70x150CM
RETAIL AREA
A-15
A-14
A-13
A-12
A-11
A-10
OUTDOOR AREA KIOSK DINING AREA
36
A-9
A-8
A-7
A-6 steel railings
A-16
Research on the various equipment and their space requirements, as well as the several possible activities in the makerspace called for flexibility in design and layout of spaces.
Make Space Today is retail, coworking, and makerspace hybrid in Malingap St. Quezon City, envisioned by a collective of artists to foster entrepreneurship within the local creative community. In a collaborative effort with the interior designer and owner, a minimalist look with a defined light and neutral material palette was decided on to highlight the tools and products available in the space. The clear material finishes maintained honesty to the inherent characteristics of the construction materials used.
from Make Space Today Facebook page
37
CASHIER COUNTER DETAILS
380
580
ISOMETRIC
20
LOCATION: 40 MALINGAP STREET, BARANGAY TEACHERS VILLAGE EAST, QUEZON CITY 1100
25 350 1110
20 380
20
20
1:15 MM
20
3/4" THK PLYWOOD IN NATURAL DEAD FLAT LACQUER FINISH, FOR DESIGNER'S APPROVAL
390
LOCATION: 40 MALINGAP STREET, BARANGAY NOTES: TEACHERS VILLAGE EAST, QUEZON CITY 1100
SCALE:
20
1100
50 20 395
SCALE:
DATE: 2019-01-25
SECTIONS
120 380
760
ELEVATION & SECTION
PREPARED BY: AGAB
CASHIER COUNTER
1
ID-8.0
350
20
CASHIER COUNTER SHELF 1
PROJECT: MAKESPACE
CASHIER COUNTER DETAILS
20
20
230
350
20
2
ID-8.0
SHEET CONTENT: ID-7.0
PROJECT: MAKESPACE NOTES:
820
25
870
315
20
SHEET NO:
DATE: 2019-01-25
325 120
20
3/4" THK PLYWOOD IN NATURAL DEAD FLAT LACQUER FINISH, FOR DESIGNER'S APPROVAL
20
50 240 50 20 20
315
395 395
760
730
20 20
CASHIER COUNTER
SCALE: 1:15 MM PREPARED BY: AGAB
SHEET CONTENT:
870
50 20
1
ID-7.0
380 50
1800 20
50 20
20
440
20
900
315 380
870
50 20
730
20
20 20 50
167 0
20
5 112
250
50 20 325
580
COUNTERTOP: 3/4" THK PLYWOOD W/ 1/2" THK EDGING IN NATURAL DEAD FLAT LACQUER FINISH, FOR DESIGNER'S APPROVAL
20
25
730
325 380
900 1100
350
20
870
315
900
20
350
230
615
3/4" THK PLYWOOD IN NATURAL DEAD FLAT LACQUER FINISH, FOR DESIGNER'S APPROVAL 645
1310
50 20
25
180 0
25
5 112 900
25
380
20
900
250
25 185 25
20
995
900
645
185 25
325 20 140 25 900
380
120
20
900
185 25
167 0
380
20
1670
COUNTERTOP: 3/4" THK PLYWOOD W/ 20 IN NATURAL 20 1/2" 25 THK205 EDGING DEAD FLAT LACQUER FINISH, 415 FOR DESIGNER'S APPROVAL
185 25
3/4" THK PLYWOOD IN NATURAL DEAD FLAT LACQUER FINISH, FOR DESIGNER'S APPROVAL
250
250
1100
1110
COUNTERTOP: 3/4" THK PLYWOOD W/ 1/2" THK EDGING IN NATURAL DEAD FLAT LACQUER FINISH, 3/4" THK PLYWOOD IN NATURAL FOR DESIGNER'S APPROVAL 820 DEAD FLAT LACQUER FINISH, FOR DESIGNER'S APPROVAL
3/4" THK PLYWOOD IN NATURAL DEAD FLAT LACQUER FINISH, FOR DESIGNER'S APPROVAL
3
20
1:20 MM 580
ID-8.0
SHEET CONTENT: SHEET NO: CASHIER COUNTER ELEVATION & SECTIONS
ID-7.0
CASHIER COUNTER SHELF 1
ELEVATION & SECTION SCALE:
1:20 MM
SHEET NO:
PREPARED BY: AGAB DATE: 2019-01-25
ID-8.0
NOTES:
EXISTING CHB WALL 20MM GRANITE COUNTERTOP ON 1/2" THK BIRCH PLYWOOD, W/ 100MM BACKSPLASH
20MM GRANITE COUNTERTOP ON 1/2" THK BIRCH PLYWOOD, W/ 100MM BACKSPLASH
1/2" THK BIRCH PLYWOOD, NATURAL DEAD FLAT LACQUER FINISH * 265
OPENING FOR SINK & FAUCET 2460
365 *
365*
800
265*
EQ
VERIFY ON SITE
800
EQ
EQ
400
500
1/2" THK BIRCH PLYWOOD, NATURAL DEAD FLAT LACQUER FINISH
10MM WELDED STEEL SQUARE BAR SHELF FRAME, WHITE AUTOMOTIVE LACQUER FINISH,
ID-15.0 SCALE:
PANTRY TABLE
TOP VIEW
ID-15.0 SCALE:
1:20 MM
1/2" GRANITE COUNTERTOP ON 1/2" THK BIRCH PLYWOOD, W/ 100MM BACKSPLASH
VERIFY ON SITE
1000
2600*
NTS
2600*
OPENING FOR SINK & FAUCET
1"x2" WELDED TUBULAR STEEL TABLE FRAME, WHITE AUTOMOTIVE LACQUER FINISH, ATTACH TO CHB WALL 1"x1" WELDED TUBULAR STEEL TABLE LEGS, WHITE AUTOMOTIVE LACQUER FINISH EXISTING RC COLUMN
2420
340 NTS
LOCATION: 40 MALINGAP STREET, BARANGAY TEACHERS VILLAGE EAST, QUEZON CITY 1100
38
FRONT VIEW
ID-16.0 SCALE:
SHEET CONTENT:
1:20MM
2
DIVIDER SHELF
LOCATION:
DIVIDER SHELF
SIDE VIEW
ID-16.0 SCALE:
1:20MM
SHEET NO:
BY: GILBERT BERCERO PANTRY TABLE -PREPARED FRAME DATE:VIEW 2019-06-06 ISOMETRIC
ID-15.0 SCALE:
PROJECT: MAKESPACE
3
500
175
DIVIDER SHELF
175
ID-16.0 SCALE:
PROJECT: MAKESPACE
2
410
ISOMETRIC VIEW
760
DIVIDER SHELF
175
1
605
EQ
605
220
220
EQ
340
EQ EQ
525 400
NTS NOTES: ALL MATERIALS FOR FINISHES ARE TO BE SPECIFIED AND APPROVED BY INTERIOR DESIGNER, 525 *VERIFY ACTUAL MEASUREMENTS ON SITE
CHECKED BY: ANAIS SILVESTRE Interior Designer
100
400
100
650
242 0
EQ
175
6MM DIA. SCREW W/TOX ON WELDED FLATBAR
1/2" THK BIRCH PLYWOOD, NATURAL DEAD FLAT LACQUER FINISH
2460
800
EQ
410
1000
FINISHED WOOD BASE FIT TO FRAME
3
ATTACH TO RC COLUMN BY SCREW ON WELDED FLAT BAR @ CORNERS
ISOMETRIC VIEW
800
PANTRY TABLE - FRAME
650
1
ID-16.0 SHEET CONTENT: PANTRY TABLE DETAILS
4
PANTRY TABLE
FRONT VIEW
ID-15.0 SCALE:
1:20 MM
5
PANTRY TABLE
SIDE VIEW
ID-15.0 SCALE:
PREPARED BY: GILBERT BERCERO DATE: 2019-06-03 NOTES: ALL MATERIALS FOR FINISHES ARE TO BE SPECIFIED AND APPROVED BY INTERIOR DESIGNER, * VERIFY ACTUAL MEASUREMENTS ON SITE
1:20 MM
SHEET NO:
ID-15.0
4000* 2400
8x8FT COMMERCIALLY METALAVAILABLE PEGBOARD 8x8FTAVAILABLE COMMERCIALLY METAL PEGBOARD 400
TOOL ROOM TABLE 1 ROOM TABLE 1 TOOL SEE SHEET ID-19.0SEE SHEET ID-19.0 350
700
700*
350 350
2600*
1550
350
350
400 0*
1550
1550 350 700
400 0*
600
SWING DOOR
1550
700
0* 285
2600*
SWING DOOR
SWING DOOR
400 0*
600
TOOL ROOM COUNTER TOOL 2ROOM COUNTER 2 SEE SHEET ID-21.0SEE SHEET ID-21.0
500*
0* 285
2850*
500*
0* 285
700*
700*
TOOL ROOM COUNTER 2 SEE SHEET ID-21.0
500*
TOOL ROOM COUNTER TOOL 1ROOM COUNTER 1 SEE SHEET ID-20.0SEE SHEET ID-20.0
600
600 VERIFY ON SITE
2850*
600 2850*
VERIFY ON SITE
TOOL ROOM SHELF 2 ROOM SHELF 2 TOOL SEE SHEET ID-22.0SEE SHEET ID-22.0
2850*
700*
700*
TOOL ROOM SHELF 1 ROOM SHELF 1 TOOL SEE SHEET ID-22.0SEE SHEET ID-22.0
TOOL ROOM COUNTER 1 SEE SHEET ID-20.0
1550
400
TOOL ROOM SHELF 2 SEE SHEET ID-22.0
2600*
2400
700
TOOL ROOM SHELF 1 SEE SHEET ID-22.0
VERIFY ON SITE
4000*
2400
2850*
4000*
VERIFY ON SITE
700
400
VERIFY ON SITE
700
350
TOOL ROOM TABLE 2 ROOM TABLE 2 TOOL SEE SHEET ID-19.0 350 SEE SHEET ID-19.0 350
2250*
TOOL ROOM TABLE 1 SEE SHEET ID-19.0
1
TOOL ROOM TABLE 2 SEE SHEET ID-19.0
2250*
TOOLS ROOM
TOOLS ROOM
SPOT PLAN 1 SPOT PLAN
1:20 MM ID-18.0 SCALE: ID-18.0 SCALE:
TOOL ROOM
2
TOOL ROOM
ISOMETRIC VIEW 2 ISOMETRIC VIEW
NTS ID-18.0 SCALE: ID-18.0 SCALE:
1:20 MM
NTS
2250* TOOLS ROOM
1
PROJECT: PROJECT: MAKESPACE MAKESPACE
CHECKED BY: SHEET CONTENT: SHEET CONTENT: SPOT PLAN
CHECKED BY:
TOOL ROOM
NO: SHEET NO: 2 SHEET ISOMETRIC VIEW
PREPARED BY: GILBERT BERCERO PREPARED BY: GILBERT BERCERO DATE: 2019-06-06 DATE: 2019-06-06
NTS ID-18.0ID-18.0
1:20 MM ID-18.0 SCALE: ID-18.0 SCALE: TOOL ROOM SPOT ISOMETRIC VIEW TOOLPLAN, ROOM SPOT PLAN, ISOMETRIC VIEW NOTES: ALL MATERIALS ARE TOFINISHES BE SPECIFIED AND NOTES:FOR ALLFINISHES MATERIALS FOR ARE TO BEAPPROVED SPECIFIEDBY AND APPROVED BY ANAIS SILVESTREANAIS SILVESTRE LOCATION: LOCATION: INTERIOR DESIGNER, * VERIFY ACTUAL *MEASUREMENTS ON SITE INTERIOR DESIGNER, VERIFY ACTUAL MEASUREMENTS ON SITE Interior Designer Interior Designer 40 MALINGAP STREET, QUEZON CITY 1100 40 MALINGAP STREET, QUEZON CITY 1100 0
3/4" THK BIRCH PLYWOOD NATURAL DEAD FLAT LACQUER FINISH @ EXTERIOR & VISIBLE SIDES, 3/4" PANEL MARINE PLYWOOD 6MM THK GLASS NATURAL DEAD FLAT LACQUER FINISH @ INTERIOR
60
175 0
3/4" THKTABLE BIRCHLEGS, PLYWOOD NATURAL DEAD FLAT LACQUER FINISH 1"x1" WELDED TUBULAR STEEL @ EXTERIOR WHITE AUTOMOTIVE LACQUER FINISH& VISIBLE SIDES, 3/4" MARINE PLYWOOD NATURAL DEAD FLAT LACQUER FINISH @ INTERIOR
1"x1" WELDED TUBULAR STEEL TABLE LEGS, WHITE AUTOMOTIVE LACQUER FINISH
3
PROJECT: MAKESPACE LOCATION: 40 MALINGAP STREET, QUEZON CITY 1100
4 SIDEVIEW ISOMETRIC VIEW
CHECKED BY: ANAIS SILVESTRE Interior Designer
PROJECT:
NTS 1:20 MM
2
TOOL ROOM SHELF 1
SIDE VIEW
ID-22.0 SCALE:
TOOL ROOM 2 SHELF 1 TOOL ROOM TABLECOUNTER 2 TOOL ROOM
ISOMETRIC VIEWVIEW 3VIEW 7 2FRONT FRONT
SCALE ID-21.0 SCALE: 1:20 MM 1:20 MM ID-19.0 SCALE: NTS1:20 MM ID-22.0
SHEET CONTENT:
600
555
555
VERIFY ON SITE
2600*
555
385
555 TOOL ROOM SHELF 2 2 TOOL ROOM TABLE
1:20 MMNTS
PREPARED BY: GILBERT BERCERO
900
1:20 MM
5
5
TOOL ROOM COUNTER 2
FRONT VIEW
ID-21.0 SCALE:
TOOL ROOM SHELF 2
SIDE VIEW
ID-22.0 SCALE:
385
400 900 400
400
SIDE VIEW
ID-19.0
CHECKED BY:
100
TOOL ROOM COUNTER 2
4 8 ISOMETRIC VIEW FRONT VIEW
SCALE: ID-22.0 ID-19.0SCALE
900
385
4
ID-21.0 SCALE:
PREPARED BY: GILBERT BERCERO SHEET NO: CHECKED BY: SHEET CONTENT: DATE: 2019-06-06 MAKESPACE TOOL ROOM TABLE DETAILS NOTES: ALL MATERIALS FOR FINISHES ARE TO BE SPECIFIED ANDTOOL APPROVED BY ROOM COUNTER 2 DETAILS SILVESTRE LOCATION: INTERIOR DESIGNER, * VERIFYANAIS ACTUAL MEASUREMENTS ON SITE Interior Designer 40 MALINGAP STREET, QUEZON CITY 1100
SHEET CONTENT: PROJECT:
400
900
500
400
1020
770
80
350
385
700
1:20 MM
700
100
EQ
100100
EQ
TOP VIEW
LEAVE OPEN FOR EXISTING PANELBOX
NTS
900
50 400 120
900900
900 400
900
EQ
100
TOOL ROOM SHELF TOOL1ROOM TABLE 1
ID-22.0 SCALE ID-19.0 SCALE:
1:20 MM
750
570
1
FRONT VIEW
400
50 120
TOOL ROOM TABLE 1
ID-19.0 SCALE:
EQ
100
230
720
900
50 120 EQ
570
EQ
750
EQ
100
EQ
ID-19.0 SCALE
350
765
80
TOOL ROOM COUNTER 2
1750
750
1550
765
3
ISOMETRIC VIEW 600
50 120
700
350
700
1750
330
TOOL ROOM TABLE 2
570
1050 765
175 1:20 MM 0
6
720
ID-19.0 SCALE:
NTS
400
1550
TOP VIEW
100
ID-19.0 SCALE
TOOL ROOM TABLE 2
5
370
ISOMETRIC VIEW
2600*
600
TOOL ROOM TABLE 1
50
ID-21.0 SCALE:
2600*
NTS
700
1020
350
VERIFY ON SITE
ISOMETRIC VIEW
350
VERIFY ON SITE
EQ
VERIFY ON SITE
EQ
TOOL ROOM COUNTER 2
370
1:20 MM
2
370
2600*
TOP VIEW
765
1
370
TOOL ROOM TABLE 1
ID-19.0 SCALE:
EQ
ID-21.0 SCALE
VERIFY ON SITE
1
EQ
900
50
350
630
700
0 105
350
370350
700
370
EQ
2600*
EQ
350
EQ
1050
700
YO NS ITE
700
1:20 MM
6
1:20 MM
100
765
400 570
YO RIF VE
EQ
400
500
900
155 0
765
750
* 700 SITE N
ID-18.0
80
TOOL ROOM SPOT PLAN, ISOMETRIC VIEW
ANAIS SILVESTRE Interior Designer
765
CABINET DOORS WITH LOCK 3/4" THK BIRCH PLYWOOD NATURAL DEAD FLAT LACQUER FINISH 3/4" THK BIRCH PLYWOOD NATURAL DEAD FLAT LACQUER FINISH DATE: 2019-06-06 @ EXTERIOR & VISIBLE SIDES, 3/4" MARINE PLYWOOD NATURAL @ EXTERIOR & VISIBLE SIDES, 3/4" MARINE PLYWOOD NATURAL DEAD FLAT LACQUER FINISH @ INTERIOR DEAD FLAT LACQUER NOTES: ALL MATERIALS FOR FINISHES ARE TO BE SPECIFIED AND APPROVED BYFINISH @ INTERIOR 102 0 INTERIOR DESIGNER, * VERIFY ACTUAL MEASUREMENTS ON SITE 155 765 700* 700* 0 400 700 VERIFY ON SITE VERIFY ON SITE 1550 0 40 VE765 700* RIF 765 765
VERIFY ON SITE
1550 N: GAP STREET, QUEZON765CITY 1100
SHEET NO:
PREPARED BY: GILBERT BERCERO
SHEET CONTENT:
CABINET DOORS WITH LOCK
2600*
CHECKED BY:
770
: ACE
100
3/4" THK BIRCH PLYWOOD NATURAL DEAD FLAT LACQUER FINISH @ EXTERIOR & VISIBLE SIDES, 3/4" THK MARINE PLYWOOD NATURAL DEAD FLAT LACQUER @ INTERIOR
TOOL ROOM SHELF 2
FRONT VIEW
ID-23.0 SCALE:
1:20 MM
PREPARED BY: GILBERT BERCERO
SHEET NO:
DATE: 2019-06-06
39
NOTES: ALL MATERIALS FOR FINISHES ARE TO BE SPECIFIED AND APPROVED BY INTERIOR DESIGNER, * VERIFY ACTUAL MEASUREMENTS ON SITE
SHEET NO:
ID-2
APARTMENT C Studio Unit Interiors
Apartment C is a 20sqm studio unit featuring a convertible furniture layout to maximize the limited floor area. The main space-saving feature of the apartment is the custom wall built-in. The built-in features a queen-size Murphy bed that turns into a sofa when stowed away. It also incorporates a closet, bed-side table, shelves, and storage cabinets. The butterfly table and folding chairs seat 4-6 people, perfect for hosting dinners with close friends. The addition of mirrors for the kitchen backsplash and sliding closet doors serves to amplify the sense of space within the modest unit.
40
day rende r
ni ght rende r
41
day rende r
ni ght rend e r
42
day rende r
ni ght rend e r
43
MISC. WORK
Architectural Visualization
Public space redevelopment studies for national government agency
44
Esplanade hotel studies for city government
45
urban development studies for city government
46
master plan concept for national government agency
47
park concept for international competition
monument restoration presentation render for city government
48
condominium presentation renders for private client
49