ROADWAY
LIMITS
MILES
ESTIMATED
TOTAL PROJECT COST
FUNDING SOURCE
NW 51st St.
NW 23rd Ave. to NW 39th Ave.
1
$700,000
$1,114,974
Gas Tax Bond
STATUS Completed 2008
PROJECT DESCRIPTION • Milling and resurfacing. • Signal improvements (pedestrian head upgrades and video detection) at intersection of NW 23rd Ave. and NW 51st St. • Signal improvements (pedestrian head upgrades) at intersection of NW 27th Ave. and NW 51st St. • Handicap ramps and drainage repairs and reconstruction. Construction of sidewalk on west side of roadway (not in original estimated cost). The project was a milling and resurfacing of NW 51st St. was from NW 23rd Ave. to NW 39th Ave. with a number of improvements. This project included the addition of sidewalk on the west side of NW 51st St. and signal upgrades at the intersections of NW 23rd Ave. and NW 27th Ave. This project was designed by Causseaux and Ellington, Inc. (now Causseaux, Hewett, and Walpole, Inc.). On April 8, 2008, the Board awarded the construction contract to Anderson Columbia Co., Inc. This project was bid and awarded in conjunction with NW 39th Ave. to achieve economy of scale. The sidewalk was field-adjusted to preserve existing trees. The original contract included 180 calendar days for substantial completion and 30 days for final completion of both NW 39th Ave. and NW 51st St. projects. The projects actually took 174 days (completion date: December 9, 2008). Funding for this project came from Gas Tax Bond revenues that had been approved by the Board in April 2005.
JUNE 24, 2010
ALACHUA COUNTY PAVEMENT MANAGEMENT PROGRAM UPDATE REPORT
23