ROADWAY
LIMITS
MILES
ESTIMATED
TOTAL PROJECT COST
FUNDING SOURCE
STATUS
Arredondo Estates
Neighborhood
3.7
$652,000
$442,686
Gas Tax Bond
Completed 2006
PROJECT DESCRIPTION • Milling and resurfacing. This project was a milling and resurfacing of the Arredondo Estates subdivision, located just north of the 6300 block of SW Archer Rd. This project was designed in-house. In-house Road and Bridge crews removed the existing asphalt and reshaped the base. The annual asphalt surfacing contract (John C. Hipp Construction Equipment Co., Inc.) was used to place the new asphalt. Funding for this project came from Gas Tax Bond revenues that had been approved by the Board in April 2005.
18
ALACHUA COUNTY PAVEMENT MANAGEMENT PROGRAM UPDATE REPORT
JUNE 24, 2010