Alachua County Pavement Management Program

Page 25

ROADWAY

LIMITS

MILES

ESTIMATED

TOTAL PROJECT COST

FUNDING SOURCE

STATUS

Sunningdale

Neighborhood

3

$529,000

$274,948

Gas Tax Bond

Completed 2006

PROJECT DESCRIPTION • Milling and resurfacing. This project was a milling and resurfacing of the Sunningdale subdivision, located just south of the 8200 block of W Newberry Rd. This project was designed in-house. In-house Road and Bridge crews removed the existing asphalt and reshaped the base. The annual asphalt surfacing contract (John C. Hipp Construction Equipment Co., Inc.) was used to place the new asphalt. Funding for this project came from Gas Tax Bond revenues that had been approved by the Board in April 2005.

ROADWAY

LIMITS

MILES

ESTIMATED

TOTAL PROJECT COST

FUNDING SOURCE

STATUS

Jacks/Pine Acres

Neighborhood

0.72

$126,000

$133,740

Gas Tax Bond

Completed 2006

PROJECT DESCRIPTION • Milling and resurfacing. This project was a milling and resurfacing of the Jacks/Pine Acres subdivision, located off of E University Ave., just east of SE 43rd St. This project was designed in-house. In-house Road and Bridge crews removed the existing asphalt and reshaped the base. The annual asphalt surfacing contract (John C. Hipp Construction Equipment Co., Inc.) was used to place the new asphalt. Funding for this project came from Gas Tax Bond revenues that had been approved by the Board in April 2005.

JUNE 24, 2010

ALACHUA COUNTY PAVEMENT MANAGEMENT PROGRAM UPDATE REPORT

17