Taking BIM onto the Construction Site

Page 1

Taking BIM onto the Construction Site

Ian Hall Survey Sales Consultant – Eastern Area KOREC Group


Agenda  Introduction – What is BIM  Trimble approach to BIM  Trimble Field Link  Setting out with the BIM model  Reporting back to the BIM model  Beyond Trimble Field Link


Building Information Modelling  Increasingly complex designs  More demanding schedules

Contractors must find ways to:  Increase productivity  Reduce or eliminate rework


Building Information Modelling 2D Floor Plans


Building Information Modelling 2D elevations


Building Information Modelling  3D virtual visualisation


Building Information Modelling


BIM Collaboration

Architects

 BIM  Multiple Stakeholders  Working  Together


BIM Collaboration Structural Engineers

 BIM  Multiple Stakeholders  Working  Together Architects


BIM Collaboration Structural Engineers

MEP Consultants

 BIM  Multiple Stakeholders  Working  Together Architects


BIM Collaboration Structural Engineers

MEP Consultants

 BIM  Multiple Stakeholders  Working  Together Architects

Project Management


Collaboration of Information Spatial Information


Collaboration of Information Spatial Information + structural information


Collaboration of Information Schedule Information


Benefits of BIM 

Drives efficiency  Better collaboration on the design – less RFI’s  Better efficiency of offsite fabrication  Better coordination with GC


BIM A-E-C Workflow


Industry Challenges  Contractors are asking to:


Industry Challenges  Contractors are asking to:  Deepen their adoption of the BIM process


Industry Challenges  Contractors are asking to:  Deepen their adoption of the BIM process  Improve information flow between the office and field


Industry Challenges  Contractors are asking to:  Deepen their adoption of the BIM process  Improve information flow between the office and field  Improve field reporting and analysis tools


Industry Challenges  Contractors are asking to:    

Deepen their adoption of the BIM process Improve information flow between the office and field Improve field reporting and analysis tools Access more information in the field


Industry Challenges  Contractors are asking to:     

Deepen their adoption of the BIM process Improve information flow between the office and field Improve field reporting and analysis tools Access more information in the field Use more powerful field hardware


Solution – Trimble Field Link  How does Trimble Field Link do this


Solution – Trimble Field Link  How does Trimble Field Link do this  Enhanced information and reporting capability


Solution – Trimble Field Link  How does Trimble Field Link do this  Enhanced information and reporting capability  Daily Setting Out Summary – productivity and accuracy


Solution – Trimble Field Link  How does Trimble Field Link do this  Enhanced information and reporting capability  Daily Setting Out Summary – productivity and accuracy  Deviation Report – Setting Out status and accuracy


Solution – Trimble Field Link  How does Trimble Field Link do this  Enhanced information and reporting capability  Daily Setting Out Summary – productivity and accuracy  Deviation Report – Setting Out status and accuracy  Field Report provides immediate information on condition, location, time and severity of conflicts or issues to make timely decision and avoid costly reworks


Solution – Trimble Field Link  How does Trimble Field Link do this  Enhanced information and reporting capability  Daily Setting Out Summary – productivity and accuracy  Deviation Report – Setting Out status and accuracy  Field Report provides immediate information on condition, location, time and severity of conflicts or issues to make timely decision and avoid costly reworks  3D Model Viewer lets field crews visualize the finished product during the construction to improve chances for a successful result and identify conflicts before they happen


Solution – Trimble Field Link  How does Trimble Field Link do this  Enhanced information and reporting capability  Daily Setting Out Summary – productivity and accuracy  Deviation Report – Setting Out status and accuracy  Field Report provides immediate information on condition, location, time and severity of conflicts or issues to make timely decision and avoid costly reworks  3D Model Viewer lets field crews visualize the finished product during the construction to improve chances for a successful result and identify conflicts before they happen  Improved hardware performance gives contractors more opportunity to take advantage of other software programs on site


The Surveyor’s Role…


A Computer’s View of a Site


A Surveyor’s view of a site


Having spent thousands of pounds on a BIM Model . . . . The construction starts  The paper plans come out  Leaving the 3D Model in the office


Having spent thousands of pounds on a BIM Model . . . . The construction starts  Setting out from the paper plans  Traditional manual methods


Having spent thousands of pounds on a BIM Model . . . . The construction starts  Scaling dimensions-calculating angles from plans  Turning angles with theodolites and using tapes to measure distances


Keep the integrity of the clean design     

Use the digital data directly from the design Don’t re-introduce clashes Maximize the benefit of offsite fabrication Update the model with true as built positions Give the owner what was built not what was intended


Keep the integrity of the clean design     

Use the digital data directly from the design Don’t re-introduce clashes Maximize the benefit of offsite fabrication Update the model with true as built positions Give the owner what was built not what was intended

Put the paper plans away !


The Surveyor’s Role today • Trimble Field Link • Modern User Interface • Task based setting out workflow

• User customizable views • Improved field reporting • Integrated 3D model viewer

• Tablet application


The Site Solution


Copy The Model onto The Controller  Export only the element of the BIM model required for setting out  DWG or DXF  2D or 3D


Using Trimble’s Setting Out Solution to take the BIM Model onto site Digital Model

Trimble Tablet & Trimble Field Link

Can be used directly for setting out in the Field by most trades


Using Trimble’s Setting Out Solution to take the BIM Model onto site • •

Automatically collecting as-built data Enabling existing conditions to be measured


BIM to Field Integration – Trimble Field Link

Manage Import Export


BIM to Field Integration – Trimble Field Link

Create from CAD Offsets Point Manager Layer Manager


BIM to Field Integration – Trimble Field Link

Setup Instrument Points


BIM to Field Integration – Trimble Field Link

Setup Instrument Points Linework


BIM to Field Integration – Trimble Field Link

3D Model Viewer


BIM to Field Integration – Trimble Field Link

Calculator Compute From Map


BIM to Field Integration – Trimble Field Link

Daily Setout Summary Setout Deviations Field Report


BIM to Field Integration – Trimble Field Link

Units & Format Layout Contact


Manage Jobs


Create From CAD


Point Manager


Lay Out Settings  H & V Tolerance selections  Vertical Tolerance exception

 In-Tolerance notification  Point Selection


Lay out Points – Point Details  Expandable Point Details  Layer ,co-ordinates, attributes  In/Out of Tolerance  H&V deltas  Point list with Name & Description


Setting-out map Standard map


Setting-Out Map Expanded Map


Setting-out – Bulls-eye Guide


Setting-out – Bulls-eye Guide Auto Screen change as point is located within 1 metre As set out position is recorded within the job report. Very clear in-tolerance notification.


3D Model View


3D Model Viewer


Setting-Out Summary


Field Report


Now with Trimble VISION


Trimble Field Link in real time


Trimble Field Link in real time


The Evolving Role of the Surveyor 1 man setting out operation Advanced Control Unit Simple layered CAD interface

Bim model onto site The Future Now‌


The Next Step in 3D data acquisition  The Laser Scanner for the construction world

 Portable  Easy to use  Fast


Benefits of 3D Laser Scanning 

Gather vast amounts of data very quickly, bringing the object back to the office to avoid return visits

Easily share data with clients over the web (FARO Scene Webshare)

Perform Virtual Surveying

Create true to life visual recreations

Analyse line of sight and environmental factors from various vantage points

Compare scan data with BIM CAD design for analysis

Improve safety by remotely measuring difficult or dangerous areas

Save time and produce superior deliverables


More Data Acquisition by scanning Laser Scan (Acquisition)

Point Cloud Data


Scan to BIM

Point Cloud Data

Digital Image


Scan to BIM Point Cloud Data

Virtual Design Model


Floor/Surface Analysis


Floor/Surface Fixes as a Result of Scan Analysis


Corrective Ceiling Height adjustments  Ceiling height adjustments based on scan analysis  Green= No change  Red= Raised  Blue= Lowered


As built Scan to BIM comparison  CO2 Removal Project

 Merge Design model and Point Cloud data in Trimble RealWorks


As built Status Scan: Pre-Pour  Scan of Steelwork cages  True as built record


As built Status Scan: Post Pour Scan of Concrete True as built record


As built Status Scan of Pile Caps 250 pile caps


Scan As built Status of pile cap  Actual scan data of pile cap  Not a photograph  Data exported into Trimble Realworks


Scan imported into Trimble Realworks  Trimble Realworks Software  Scan data manipulation  Modelling


Scan data comparison


Thank You.

Any Questions? Ian Hall Survey Sales Consultant – Eastern Area Ian.hall@korecgroup.com Tel: +44 (0) 777 151 7493