1 minute read

Water Tower Yarram Heesco

Mural Location

7 Nightingale Street, Yarram

Advertisement

About The Mural

In 2018 South Gippsland Water’s management gave in-principal support for the Tarra Tourism Association to investigate painting a mural on the tower. Five years down the track, and with the success of Yarram’s ‘Heesco Town’ murals, the Tarra Tourism Association passed over the water tower project to the ‘The Friends of Heesco Town’.

The Story

South Gippsland Water was keen that it should be Heesco Khosnaran who would paint the Tower, on the proviso that they, as the structure/building owner, would have final sign off on the design to be executed. This model has been used for all previous 24 Heesco Town murals and was seen as integral to the success of the Heesco Town project.

The tower was painted over a 4 week period starting April 7th 2023 and concluded with a public gathering at the Tower complete with local GUNAIKURNAI dancing, smoking and welcome ceremonies.

The Preparation

In preparation, South Gippsland Water engaged contractors to undertake repairs and maintenance of the tower. The tower repairs involved pressure washing the tower and removal of any loose or degraded concrete, concrete repair and then painting the tower with an acrylic weather protectant coating. These works are integral for the on-going safe operation and structural integrity of the tower.

The Cost

Eric Greenaway, the main driver behind the Heesco Town Murals, offered to underwrite the total cost of the project but was keen to see the community come on the journey with him and contribute to it. Kevin Mackin, from The Friends of Heesco Town took up the challenge and the community and local businesses and organisations came to the party.

The Mural Design

Eric Greenaway wanted the top of the tower to reflect the tourism hotspots around Yarram being very keen to see the many visitors to the area get out and see the breathtaking beauty this part of Gippsland offers. “Eric asked me to design the top so people could see everything from the 90-mile beach to the north through to Wilsons Promontory National Park to the south. Of course, the design had to include Eric’s beloved Yarram Golf Course, Australia’s number one volunteer-maintained golf course.” Wayne