High-Profile Monthly: August 2010

Page 1

August, 2010

Lerner Ladds + Bartels Relocates as Design Exchange Opens...page 18

1

Callahan Breaks Ground on Care Center...page 18

KBE Ventures Leads Design/Build Team for New Armed Forces Reserve Center...page24

Inside this issue:

Lee Kennedy Co. Tops Off JFK Library Addition...page 9 P. O. Box 7 Pembroke, MA 02359 Change Service Requested

IPI Partnering Awards Pro Con at Indian Woods CBC Awards Science Park Vision 3 to Design Big East HQ KBE Renews ‘50 Ways’ Initiative Carlson Orchards Solar Installation Erland Completes Avid Office Reno R.I. Special Olympics Selects Autiello Springfield Data Center Breaks Ground TMS Chosen for Country Club Renovation CBC Awards Science Park Parking Structure Watermark Cambridge Achieves LEED Gold Who Is Managing the Risk? by John S. Konopka PICP Best Management Practice by Larry Nicolai plus Healthcare and Educational Facilities Developments, Green News, People Calendar and more...

www.high-profile.com

August 2010


August, 2010

2

GOT

BIM ? WE DO . . .

and we can help you with your BIM too !

Proud Member of the U.S. Green Building Council.

A merican

Plumbing and Heating Corporation Fire Protection

1000 Cordwainer Drive Norwell, MA 02061 Phone: 781-347-9200 Fax: 781-347-9250 www.amerplumb.com

Biotech•Pharmaceutical•Medical•Educational•Sports & Entertainment•Hotels•Retail Mechanical Contractors Registration No. 8028 www.high-profile.com

PLEASE RECYCLE


August, 2010

3 PAV E R S B Y I D E A L

When it comes to fire protection, go with the largest in N.H.

The Solution to Stormwater Runoff is Right Under Your Feet Aqua-Bric® and Eco-Stone® Permeable Pavement ■ ■ ■ ■ ■ ■

FIRE PROTECTION ALL TYPES OF FIRE PROTECTION FIRE SPRINKLERS • FIRE EXTINGUISHERS SALES • DESIGN • INSTALLATION • INSPECTIONS COMMERCIAL • INDUSTRIAL SERVICE • REPAIR 8 No. Wentworth Ave. Londonderry, NH 03053 603.432.8221 603.434.3194 (f)

55 Harvey Road Londonderry, NH 03053 603.432.8221 603.434.8128 (f)

104 Etna Road Lebanon, NH 03766 603.448.5461 603.448.7334 (f)

277 Old Homestead Hwy Swanzey, NH 03446 (603) 358-6736 (603) 358-6832 (f)

PO Box 88 No. Conway, NH 03860 603.356.7607 603.356.7607 (f)

www.hampshirefire.com

High-strength 9000psi pavement ADA compliant - firm, stable, slip-resistant Freeze-thaw and snow-plow safe Easy to clean and maintain Cost competitive to conventional pavements Qualifies for LEED® credits Ideal Concrete Block Company, Inc. www.IdealConcreteBlock.com Serving New England Since 1923

CALL 1-800-24-IDEAL FOR A PERMEABLE LUNCH & LEARN

Breathe Easier... Trust the Environmental Expertise of RPF Associates • Air Quality Testing and Laboratory Analysis • Industrial Hygiene and OSHA Compliance • Asbestos and Mold Inspections • Environmental Site Assessments • Worker Health and Safety Training • Infrared Thermal Imaging Surveys

E N V I R O N M E N T A L T E S T I N G & C O N S U LT I N G

Offices in Northwood, NH and Amesbury, MA Call 1-888-SAFE-AIR or visit www.airpf.com www.high-profile.com


August, 2010

4

Subscribe to High-Profile Monthly all year

Sections:

Upfront:................................... 6 Facilities................................... 9 Healthcare.............................. 14 Education................................ 15 Awards................................... 23 Green News............................. 27 People.................................... 32 Calendar................................. 34

CBC Awards Science Park.......... 10 Who is Managing the Risk........... 11 Callahan Breaks Ground............ 18 PICP Best Management Practice... 22

Features: Springfield Data Center............... 21 Armed Forces Reserve Center........ 24

ADVERTISERS INDEX Allied Testing.....................................24

KBE Building Corp...........................25

American Plumbing.............................2

Kenneth Castellucci

B.L. Makepeace.................................17

& Associates, Inc..............................9

Boston Architectural College.............35

Lighthouse Electrical...........................7

Boston Plasterers’ Cement Masons......5

Marr....................................................16

Bowdoin Construction.......................13

Marr....................................................23

Callahan, Inc......................................36

Merritt Graphics.................................12

Capone Iron Corporation.....................9

N. B. Kenney, Inc.................................7

Century Drywall, Inc...........................6

Nexamp, Inc.......................................31

Cogswell Sprinkler Company, Inc.......6

Novel Iron..........................................28

Combined Energy Systems, Inc...........5

PCINE-Precast/Prestressed

Cosentini Associates, Inc...................21

Concrete Institute..........................10

www.high-profile.com

DiBlasi Associates, PC......................24

Porter Panels & Trusses.....................19

E-mail news releases, advertising queries, articles, calendar listings and announcements, to: editor@high-profile.com See ya at Publishers: Tia’s on the Michael Barnes and Kathy Barnes Waterfront for Advertising Manager: Mike Marvelli NAIOP at Night! Business Development: Anastasia Barnes www.naiopma.org. Subscriptions: Octavia Van Der Molen Lucy Consultants: RAB Associates High-Profile Monthly accepts no responsiArt Direction & Design: bility for typographical errors or omissions Sandra Guidetti of ads. We will reprint, without charge, that Proofing Editor: part in which the error occurs if it affects the Peggy Dostie value of the ad. Credit for errors made only for first insertion. The advertiser or agency seeking the services of High-Profile Monthly P.O. Box 7, Pembroke, MA 02359 Express Delivery: will indemnify and save harmless claims, 615 School St., Pembroke, MA 02359 lawsuits, damages or expenses, including Phone: (781) 294-4530 attorney’s fees and costs that may arise from Fax: (781) 293-5821 publication of the advertiser’s ads. E-Mail: editor@high-profile.com

E.M. Duggan Inc................................13

Precast Specialties Corp.....................12

EHK Adjorlolo & Associates, Inc......14

Quad-Lock Building Systems Ltd.....31

Fine Associates..................................14

Risk Managers LLC.............................5

Goldstein-Milano LLC.........................5

RPF Associates, Inc.............................3

Great In Counters...............................11

Steel Fabricators of New England.......4

Greenscape.........................................34

The Welch Corp.................................15

Greenwood Property Management....32

Topaz Engineering.............................20

Hampshire Fire Protection...................3

Triple G Scaffold Services Corp..........4

Harry R. Feldman, Inc.........................8

Valleycrest..........................................29

Harsco Infrastructure Americas.........11

Ventilation USA.................................27

Ideal Concrete......................................3

Wessling Architects..............................8

Infrared Diagnostics LLC..................28

workplaces.........................................14

JP Obelisk..........................................18

Join the

Services: • • • • • •

Erection/Dismantling Engineering Safety Coordination Crane Service Warehousing Trucking

Steel Fabricators of New England SFNE is the only organization that represents steel fabricators and allied companies that serve the building and bridge construction markets in New England.

Distributors of: • • • • • • • • • •

Sectional Scaffold System Scaffold Tube & Clamp Scaffold Rolling Towers Suspended Scaffold Shoring Ladders Enclosure Systems Debris Chutes OSHA Approved

The Benefits of SFNE Membership Include:

Products

Triple G Scaffold uses, sells and rents just about anything and everything that any contractor or company may need to complete their job safely, effectively and quickly.

29 Accord Park Drive, Norwell, MA 02061 162 Page Boulevard, Springfield, MA 01104

www.triplegscaffold.com

www.high-profile.com

• • • • • • •

Advertising promoting structural and miscellaneous steel; Education programs; FREE website listing; Legislative advocacy; Meeting and program discounts; Networking; and Quarterly newsletter.

Mark Your Calendar for September 14th! SFNE Annual Golf Classic Wedgewood Pines Country Club Stow, Massachusetts


August, 2010

5

Structural Engineers

Combined energy SyStemS, inC.

AA NO GGOOLLDDSS TT E E IINN––MMI LI L N OL LLCL C u sr a l E n g i n e e r s S t r u c t u r a l E nS gt r i nuec et r 125 Main Street Reading, MA 01867 7 8 1 - 6 7 01- 29 59 9M0a i (np S) t r e e t7 8 1 - 6 R 7 e0a- d9i9n3g 9, M( A f )0 1 8 6 7 S e r v i c e--------------------------------------------------------------------------------------------------------------------------------------------------------s I n c l u d e : - - - -7- 8- -1-- -6-7- 0- -- -9-9- 9- -0- -( -p-)- - - - - -7-8- 1- -- -6-7-0- -- 9- -9-3- 9- - (- f- -) - - - - - - - - - - - Providing Principal level service in a variety of building markets. S e r v -------- ices Include:---------------------------------------------------------* * * *

When Quality is Expected and Experience Counts

INDOOR POOL PROJECT? WE MAKE IT EASY

Our Services Include:--------------------------------------------------

Building Condition Review * Specialty structures design * Building * Building Condition Review Condition Review * Structural PeerPeer Review Façade Renovation * Structural Reviews * Façade and Garage Renovations * Structural Engineering Seismic evaluation renovations and additions * TenantValue Fit-outs *ofFaçade Renovation * Seismic evaluation for renovations and additions * Tenant Fit-out Value Engineering * Seismic * Specialty structures design Evaluation of Renovations and Additions

* Value Selected Curre n t R eEngineering n o v a t i o nReviews Projects:-------------------------------Selected Educational Projects:----------------------------------------------------* Specialty Structures Design * * * * * * *

LA Fitness, Stoneham, MA. New entrys and façade + 15,000 sq. ft addition. * Structural Peer Reviews * Inc., Bowdoin College Center, Brunswick, Maine. Girls Lynn, MA. Wellness Renovation of historic wood structure + New gymnasium building. Residence Inn, Yonkers, New York House of Blues, Boston, MA * Girls Inc., Lynn, MA. Renovation of historic school structure + New gymnasium * Tenant Fit-out Children’s Hospital Ambulatory Care Ctr., Peabody, MA. Renovation + newbuilding. building. * Princeton University, Jadwin Hall Renovation, Princeton, New Jersey Carpenters Union *Headquarters, Dorchester, MA. New overbuild and bldg. re-use. BIM Services * Milton Academy, ForbesMA. HallRemove addition, Milton, MA for new transmission control rooms. National Grid, Northboro, columns * Bentley University, Auditorium Renovation, Waltham, Wonderland Station, Revere, MA. Busway relocationMA * Carpenters Union Headquarters and Training Center, Dorchester, MA. Scotia St. Selected Station, Boston, MA. Concrete Repairs and restoration Housing Projects:-------------------------------------------

Visit www.gm-se.com * 87 New Contact us us at at www.gm-se.com

Street, Cambridge , MA * 277 Broadway, Cambridge, MA * Hilton Garden Inn, Northampton, MA * Christopher Heights, Marlborough, MA

Childrens Hospital, Peabody, MA

Portland Marriott, Portland, Maine

* Marriott Residence Inn, Portland, ME Selected Project Experience:--------------------------------------------------------------------------------------------------------------* South Shore Plaza Expansion, Braintree, MA. 350,000 sq. ft. expansion of existing mall * Residence Inn, Conway, NH * Lansdowne Street Music Hall (House of Blues), Boston, MA. 50,000 sq. ft. nightclub

* Residence Inn, Colchester, Vermont * Hilton Garden Inn, Northampton, MA

* Bowdoin College Wellness Center, Brunswick, Maine. 4-story, 32,000 sq. ft addition * 175 Wyman Street , Waltham, MA. 2 building office complex, 335,000 sq. ft. * Hampton University Proton Therapy Institute, Hampton, VA. 90,000 sq. ft. PTC * Marriott Residence Inn, Portland, Maine 5-story, 133,000 sq. ft. hotel * Cubist Pharmaceuticals, Lexington, MA. 3-story, 110,000 sq. ft. vertical addition * Wonderland Station Parking Facility, Revere, MA. 9-stories for 1,907 cars * Carpenters Union Headquarters, Boston, MA. 67,500 sq. ft. addition, 18,000 sq. ft. parking

Design Engineering Pool, Spa, Water Feature Construction Dehumidification Ventilation Heating Cooling Special Insulation & Vapor Barriers Electrical & Control Wiring Plumbing Client Turnover Instruction Maintenance & Emergency Service Over 30 Years Experience

We are natatorium specialists, so the cost is less! 37 Ayer Road - Unit 9, Littleton, Massachusetts 01460 Phone: 978.486.0070 | Fax: 978.486.4588 www.combinedenergysystems.com

* Residence Inn, Yonkers, New York

Contact us at www.gm-se.com

Visit us at www.gm-se.com

. y r r o s e im ’r

Boston & Cement Cement Masons Masons Local Local 534 534 serving: serving: MA, MA, NH, NH, ME ME & &VT, VT, Boston Plasterers’ Plasterers’& America’s Building and Construction International America’s OldestOldest Building and Construction TradesTrades International UnionUnion Since 1864 Our trained and skilled craftsmen are just a phone call away. Since 1864 We offer responsible, highly qualified competent personnel, Ourreliable, trained and skilled craftsmen are justand a phone call away. state certified apprenticeship andhighly training program. membership. We offer reliable, responsible, qualified andOSHAcertified competent personnel, state We are and committed quality and performance. certified apprenticeship trainingtoprogram. OSHA certified membership. We and performance. Sub Contractors are committed to qualityPlasterers:

LTR

Sub A1Contractors Concrete Cutting A1 Concrete Cutting Plastering LTR Angelini Angelini Plastering Inc. Austin Ornamental Austin Inc. Back Ornamental Bay Concrete Back Bay Concrete Bidgood Assoc. Bidgood Alloc. Cape Cod Plastering Cape Cod Plastering Cavalieri Const. Cavalieri Const. CenturyDrywall Drywall Century Components SprayFireproofing Fireproofing Components Spray Concrete DD&&MMConcrete EastCoast CoastFireproofing Fireproofing East F.C.F.Concrete ConcreteFloors Floors F.C.F. H. Carr & Son G & G Plaster & EIFS Lath H.Island Carr & Son& Plaster J.R.J.Lath Construction Island & Plaster JohnConstruction L. Ciman & Son J.R.J. John Ciman & Son J.L. L. Marshall J.L. Marshall M.L. McDonald Co. M.L. McDonald Mass AcousticsCo. Inc. Mailoux Bros. Construction Mecca Const. Corp. Mecca Const. Corp. New England Decks New NewEngland EnglandDecks Finish Systems Polcari Plasterworks, Inc. Ricmor Construction, Inc. Ricmor Construction, Inc. S & F Concrete S Stafford & F Concrete Construction Stafford Construction Summit Building Systems

Veneer Plaster Plasterers: Venetian Polished Plaster Veneer Plaster Three coat conventional Plaster Venetian Polished Plaster Ornamental Plaster Three coatRestoration conventional Plaster Historical & Preservation Ornamental Plaster E.I.F.S. HistoricalCement Restoration & Preservation Portland (Stucco) E.I.F.S. Fireproofing Portland Cement (Stucco) Cement Masons: Fireproofing Flatwork Cement Masons: Sidewalks Flatwork Pool Decks Sidewalks Decorative Concrete Overlays Pool Decks Stamped Concrete Decorative Concrete Overlays Concrete Repair & Restoration Stamped Concreteand Composition Epoxy, Seamless Concrete*and Repair & Restoration Flooring much more* Epoxy, Seamless and Composition Flooring *and much more*

More Information Please ForFor More Information Please CallCall Peter Stracuzzi, Jr. Industry Analyst Peter Stracuzzi, Jr. Industry Analyst Office: 617-825-5200 • Cell: 617-750-0896 Office: 617-825-5200 • Cell: 617-750-0896 Website: www.opcmialocal534.org Website: www.opcmialocal534.org

Wuer insuraniceedc,lbaecause... Yo een den you didn’t...because read or understand the “fine print” has b...because the policy wasn’t right for the type of work you do...because the insurance company didn’t notify you of cancellation...

O

h sure, you’ve got insurance. But does it cover the project you’re working on? Will it pay for unforeseen accidents or weather damage, or be cancelled because you didn’t live up to the terms spelled out on the 4th page of fine print? Risk Managers can help prevent all that, and more. We don’t sell insurance but, with over 3 decades in the industry, we can help you get exactly the plan your company needs. A plan that will protect you from costly payments or bankruptcy. Don’t leave yourself exposed to risks you may not even know about. Call Risk Managers today, and let us assess your needs and coverage. 781-269-4608 (cell 617-721-5091).

David Sullivan

Risk Managers, LLC LLC

Norwood, MA 02062-2263 781-269-4608 dave@riskmgrsllc.com

www.high-profile.com


August, 2010

6

Sean Brooke House Opens Developed by Caritas Communities New Bedford, MA - A ribbon cutting www.high-profi le.com ceremony was held to officially open the Sean Brooke House on June 22. The building was developed by Caritas Communities, a nonprofit organization committed to providing affordable housing to those in need, and will eventually be home to 19 US veterans. Amherst, MA - ARC/Architectural Participating in the project were Resources Cambridge announced the contractor: dedication ofBufftree four newBuilding residence Company, halls Inc. New Bedford; MEP engineers: Builddesigned by the firm for the University ing Engineering Resources, Inc., of Massachusetts in Amherst. Dimeo North Construction of Providence, engineers: R.I. was Easton; civil Co. & environmental the construction manager Inc., for theMarshfield; $93 SITEC Environmental, million project. solar consultant: New Ecology, Inc., BosUMasscontractor: officials held a dedication ton; solar Zapotec Energy ceremony in August for the opening of Inc., Cambridge, and architect: Durkee, the 864-bed project known as the North Brown, Viveiros & Werenfels Architects, Residential Area. Providence, ARC R.I. completed the design of the

Pr

EDUCATIONAL FACILITIES

Friedrichs Joins ZweigWhite as Chairman Wayland, MA – ZweigWhite, where he guides the developa national A/E Consultancy, anment of high performance ornounced the appointment of Ed ganizations, focusing on stratFriedrichs as chairman. egy, culture, organizational Friedrichs is the former issues, sales and marketing. CEO of Gensler, Architecture DeHe currently sits on the boards sign and Planning Worldwide. He of Glumac and Miyamoto Injoined Gensler when the firm had ternational. 20 employees and helped lead the Along with the addition transformation of the company of Ed Friedrichs to the ZweigFriedrichs to a firm with 2,400 professionals White team, Mark Zweig will worldwide. expand his role with the comIn 2003, he formed Friedrichs Group pany as partner and board member.

Innovation Pavilion at Build Boston New Area for Manufacturers of Emerging Products Boston - In its 26th year, Build Boston introduced the first Innovation Pavilion – an opportunity for new and innovative products and companies to join the established event. Build Boston is the Northeast’s largest tradeshow and convention for the design and construction industry, registering more than 15,000 attendees each year. Selected entries will be exhibited November 17-19, 2010 in the Innovation Pavilion at Build Boston. The area will be designated solely for these products and will be curated around the unique qualities of the

selected entries. The area will be staffed by representatives from the BSA, the GPA, and Building & Design Resources. It is anticipated that 40 entries will be selected. All accepted submissions will be included in the Build Boston on-site program guide and other print and digital marketing materials. The criteria for the Innovation Pavilion are: • Products that have been in the marketplace for three years or less. • Companies must be doing or planning to do business in the USA.

New UMass Student Apartme

Designed by ARC, Bui along with glass bay windows help to differentiate the new buildings from existing building s on campus. Each unit includes four bedrooms with cable and Ethernet connections, two full baths, a common living room/kitchen area, a pantry, floor-to-ceiling windows, and air-conditioning. “Seeing this building open is the realization of much hard work and creativWinkeller, executive director of ity Mark on behalf of a great project team that Caritas Communities (far left) with Sean’s included our staff, Dimeo Construction

parents, Lauri and Darren Brooke.

four new apartment-style residence halls in September of 2005 and construction started in June 2005. Totaling 325,000 sf, Providence, RI -were David the five-story buildings designed to R. Prengaman, AIA, LEED relate to the earlier residence halls that AP has been elected as the pitched new roofs incorporate brick exteriors, chairman of the State of Rhode and dormers. A brick banding pattern

Prengaman Chair of R.I. Architects Board cial, residential, and institutional projects. Prengaman previously served as the vice chairman of the R.I. Board of Examination and RegUMass Amherst Student Lounge istration of Architects, has alsosaid served as and UMassand personnel,” Mark Dolny presidenttogether, of thewe Ameriof ARC. “Working exceeded the University’s goal of of providing a comcan Institute Architects’ David Prengaman munity forRhode students who want the conIsland chapter.

Island Board of Examination and Registration of Architects. Prengaman is a principal at Vision 3 Architects in Providence. During his 24 years in practice, Prengaman has designed, planned, and managed large-scale office, healthcare, commerUMass Amherst Lobby

venience of on-campus housing with the advantages of a more autonomous living situation. These residences represent a new

Fire Protection Specialists INDUSTRIAL • INSTITUTIONAL • RESIDENTIAL • COMMERCIAL

������� ������������� ����������������������� ����������������� �����������������������������

24 Hour Emergency Service 1-800-422-4971

We Install Peace of Mind (508) 753-0015 • 22 Canterbury Street • Worcester, MA 01610

www.cogswellsprinkler.com www.high-profile.com

Manch archite `Wood Woodl planne of 487 which neighb W MAis t which of 75 Cottag consist Woodl town h will tot Reside consist underg will be in a m housing Woodlth allow Th with ot Pond the coun develo S to aare6 ings gi tothe enco Manch collegia benefit The com ac toeasy encou dining mural te Th T serve on-cama

����������������������� ���������������������� ����������������� ��ILL WOODSIDE �������������������������������������������� ��������bwoodside����������������������


August, 2010

7

Duffy and Jean Recognized Bedford, N.H. - The New Hampshire Commercial Investment Board of Realtors (NH CIBOR) held its annual Barbeque recently in Bedford. An important part of this annual gathering is the announcement of the CIBOR Realtor of the Year and the CIBOR Affiliate of the Year. Tom Duffy of Prudential Verani Realty was named Commercial Realtor of the Year, 2010 and Bill Jean of Fulcrum Associates was named Affiliate of the Year, 2010. Duffy will represent CIBOR at the N.H. Association of Realtors Awards Banquet in the fall. Bill Jean, the 2010 Affiliate of the Year, Jean is an active member of the N.H. shown with Tom Duffy, the 2010 ComCIBOR Board of Directors. mercial Realtor of the Year.

Mentors and students from the Bridgeport/Stratford team show Senator Christopher Dodd their winning project.

Poinelli Elected CEFPI VP

Students Place Third in Competition

Boston - Phil Poinelli, AIA, REFP, LEED AP, principal at Symmes Maini & McKee Associates, Inc., has been elected Vice President of the Northeast Region of the Council of Educational Facility Planners International (CEFPI). The position is the start of a four year commitment which includes a year serving in each of the following roles: vice president; president elect; president; past president. Poinelli is also currently serving as co-chair for CEFPI’s Northeast Conference to be held in Boston in April 2011.

Bridgeport, CT - In 2002, Antinozzi Associates, an architecture and interior design firm based in Bridgeport, was asked to lead one of two teams from the Greater Bridgeport Chapter of the ACE (Architecture, Construction, and Engineering) Mentor Program of Connecticut. Since then, numerous employees have volunteered their time with other industry professionals as mentors to Bridgeport and Stratford high school students through hands-on participation in a mock design project. Several of the senior year students formed a team and entered a national design competition sponsored by the Construction Industry Round Table and ACE Mentor Program of America. Led by team members Erik Wengenroth, Anthony Rizzitelli, Aaron Ho, and Michael Lindsey from

France New AGC Treasurer Shirley, MA - Robert France of Senate Construction Corp. in Shirley, has been appointed as treasurer of the Associated General Contractors Massachusetts Chapter (AGC) for the 2010 – 2011 year. France has over 30 years in the construction industry from sales and estimating to project management. He founded Senate Construction in 1990 to offer his clients more complete real estate development needs.

Robert France

When evaluating a mechanical contractor, don’t overlook a critical spec:

E X P E R I E N C E. All mechanical contractors say they can do the job. But at NB Kenney we’ve proven ourselves for more than thirty years. From hospitals, laboratories and schools, to government buildings, municipal buildings and housing projects we can handle the most challenging and complex systems. We invite you to review our success stories and see that we know how to get a project done on time and on budget.

Photo courtesy of Zapotec Energy Inc.

Phil Poinelli

Stratford High, and Ryan DeSilva from Fairfield Prep, the team’s entry for an arts center/theater building’ won third place in the competition. A second team of Connecticut high school students, from the ACE Greater New Haven Chapter, won second place in the competition for their design of a green housing row’ in East Haven. ACE is a nationally based, group mentoring program whose mission is to enlighten and increase the awareness of high school students, especially women and minority students, to career opportunities in the design and construction industry. Currently, 10 teams of approximately 150 high school students make up the five ACE chapters operating in Connecticut, located in Bridgeport, New Haven, Waterbury, Hartford, and Stamford.

You’ll find that our work meets the most rigorous standards of excellence. If you want uncompromising quality, meticulous attention to detail, and the know-how to get it done right, depend on our experience for your next project.

Holyoke Center, Harvard University, Cambridge–small-scale wind installation

MIT Building 57 – Alumni Pool, Cambridge

NB KENNEY Mechanical Contractors

Bartlett Farm Wind Turbine, Nantucket, MA

Tufts University Solar System, Medford, MA

NEW ENGLAND’S LEADING RESOURCE FOR RENEWABLE ENERGY PROJECTS When it comes to wind and solar energy projects in New

Experience the power of a bright, clean, energy efficient

England, one company is leading the way, Lighthouse Electrical

future. Call Lighthouse principal Herb Aikens or Newell

Contracting, Inc. Since our incorporation in 2002, Lighthouse

Thomas, Director of Renewable Energy Services, at

has successfully completed more than 200 photovoltaic and

Lighthouse Electrical today at 781.261.9711.

15 wind turbine projects throughout the region. Lighthouse provides comprehensive support services,

NB KENNEY COMPANY INC. Mechanical Contractors 68 Barnum Rd. Devens, MA 01434-3508 P. 978.849.5200 - F. 978.849.5299 email: skenney@nbkenney.com

working with clients from project planning through installation. � Site evaluation � Project design

� Procurement of project funding

� Installation through online connection to power grid

NEW ENGLAND’S GUIDING LIGHT IN RENEWABLE ENERGY PROJECTS 59 North Avenue, Rockland, MA 02370 Telephone: 781.261.9711 www.lighthouse-electrical.com

www.high-profile.com


August, 2010

8

High-Profile: Facilities Development News

Photo: Frank Monkiewicz Photography

First Place under the catagory of special events was presented to the 2009/3020 SMPS/ Boston Awards Committee for the Boston ROC Awards Gala. (L to R) Kristi Sprinkel, Jesse Lockwood, Kate Shoss, David Easterbrook, Tara Graves (Director), Beth Dudeck (Committee Chair), Mark Guarino, and Bethany Barker. Also on the committee but not shown in the photo are Danielle Jackson, Sola Agunbaiade, Christine Oltheroff, Emily Bartlett, Bethany Barker, and Andrea Lalinde .

Boston Hosts SMPS National Event Winners Elated, Larry Deflated

FELDMAN Professional Land Surveyors F

O C U S I N G

O

N

E

X C E L L E N C E

S

I N C E

1 9 4 6

OUR SERVICES:

OUR CLIENTS:

• Boundary Surveys • ALTA/ACSM Land Title Surveys • Topographic Site Surveys • Photogrammetric Mapping • Land Court Surveys • Construction Layout • As-Built Surveys • 3D Laser Scanning

• Developers • Engineering Firms • Architectural Firms • Law Firms • General Contractors • Educational Institutions • Health Care Institutions • Government

Harry R. Feldman, Inc. • 112 Shawmut Avenue • Boston, MA 02118 • 617-357-9740 • www.harryrfeldman.com

www.high-profile.com

Special Event: by Michael Barnes, Publisher 2nd - Nitsch Engineering, Inc., Boston High-Profile Monthly Target Marketing: The mascot of Build Business 2010, Larry the Lobster, escaped from his tank 1st - CBT Architects, Boston at the SMPS Conference in July 2009. A Web Site: photo montage of his 1st Small - Silverscape, Boston travels was craftily edThe Recognizing Outstanding Comited into an entertaining munications (ROC) Awards Gala received video that documented recognition for Chapter Excellence. The his wild encounters with SMPS Boston chapter was recognized for each of the SMPS chap- breathing new life into their already wellters throughout the US established awards program. The SMPS and was shown before Boston Awards Committee, comprised Michael Barnes an enthusiastic audience of 13 dedicated members, rebranded the during the final net- event giving it the new name “SMPS Bosworking luncheon of the ton Recognizing Outstanding CommunicaSMPS National Conference hosted by the tions Awards” fondly known as the ROC SMPS Boston Chapter at the Boston Mar- Awards. In keeping with the newly-minted riott in July. However after his subsequent feel of the event, the gala utilized a black recapture, Larry was rumored to have been and white theme that was woven into the completely deflated. event décor, dress, and promotional mateThis was in sharp contrast to the elat- rials. Amidst the worst recession in recent ed winners of the 33rd Annual SMPS Na- history, the gala turned a profit for SMPS tional Marketing Communications Awards, Boston and was met with rave reviews honoring excellence in marketing commu- from attendees. nications for professional services firms. With attendees from all over the Our New England chapters were well United States, the Build Business 2010 represented as you can see in this list of was crammed with substance and executed winners, by category and place, from the with an expertise and finesse that could 2010 National MCA competition. only be rivaled by the best of the best. The Corporate Identity: bar has been set high for the next SMPS 1st - BOND, Everett, Mass. National Conference, August 24–27, 2011 2nd - Carol R Johnson Associates Inc, in Chicago. Boston A complete list of winners and a link to Direct-Mail Campaign: the video with Larry the Lobster can be found 3rd - Standard Builders, Newton, Conn. at www.buildbuisiness.org. Internal Communications: 1st – EYP Architecture & Engineering, Boston Media Relations Campaign: 3rd - GEI Consultants, Inc., Woburn, Mass. Promotional Campaign: 1st - EYP Architecture & Engineering, Boston Recruitment & Retention Communications: 3rd Simpson Gumpertz & Heger Larry the Lobster presented at the Networking Luncheon by Build Inc, Waltham, Mass. Business Co-Chairs Michael J. Reilly, FSMPS, Reilly Communications, and Rolf Fuessler, FSMPS, Fuessler Group Inc.


August, 2010

9

High-Profile: Facilities Development News

LKCo Tops Off JFK Library Addition Part of $16.5 million expansion Dorchester, MA - Lee Kennedy Co. recently topped off a two-story addition to the John F. Kennedy Presidential Library and Museum. The addition is part of a $16.5 million expansion and renovation of the facility that Lee Kennedy Co. is completing for the National Archives & Record Administration. The new 30,000sf addition will house artifacts and documents previously stored off-site. In addition to the new construction, Lee Kennedy Co.’s team is performing 20,000sf of renovation within the library and museum. Renovations include archive and artifact storage areas, support space, offices, security areas, exhibit space, the main lobby and gift shop, and some deferred maintenance.

Rendering of the new facility for Special Olympics of Rhode Island

RI Special Olympics Selects Autiello Saccoccio Architects

Topping off the John F. Kennedy Presidential Library and Museum addition

Rendering of the new two-story addition to the JFK Presidential Library and Museum.

Smithfield, RI - Special Olympics in storage, a family information center, a of Rhode Island has selected A. Autiello pre-function display and gathering area, Construction Company, Inc. of Cranston boardroom, and multi-function and trainto construct its new $1.7 million facility ing room. in Smithfield. The project, which began in The building is expected to be commid-June, was developed using the design pleted before the end of the year. build guaranteed price method of construction. The 9,700sf single-story building will be built using concrete foundations, structural steel, exterior metal stud framing with a fiber cement pane skin, and TPO membrane roof system. Autiello teamed with Saccoccio & Associates architects, C.A. Pretzer Associates structural engineers, and Creative Environment Corporation mechanical and electrical engineers, to design within a limited construction The new facility for Special Olympics of RI budget. recently began construction. Design was a collaboration between Thomas Imondi, project architect, and Anthony Autiello, construction project manager. The design includes offices, workrooms, presentation storage areas, storage for athletic equipment, drive-

STRUCTURAL STEEL I BAR JOIST l METAL DECK MISCELLANEOUS, ORNAMENTAL & ARCHITECTURAL METALS

The rare, single-source contractor of natural stone. Kenneth Castellucci & Assoc., Inc.

9 New England Way, Lincoln, RI 02865 P: 401.333.5400 F: 401.333.5420

www.castellucci.com 20 Turcotte Memorial Drive I P.O. Box 706 Rowley, MA 01969 T: 978-948-8000 I F: 978-948-8650 www.caponeiron.com

INTERNATIONAL MASONRY INSTITUTE

www.high-profile.com 480905_Kenneth.indd 1

5/31/10 11:05:34 PM


August, 2010

10

High-Profile: Facilities Development News

CBC Awards Science Park New Haven, CT - The 2010, 14th Annual Connecticut Building Congress recently presented the Science Park parking structure with an award of merit. More than a parking structure, it is the shining light in the redevelopment of a tough neighborhood. The area had once held 18,000 jobs in and around the Winchester Repeating Arms Company. Now, mostly abandoned, the area is beginning to see the twinkle of new development as Science Park is taking shape. This project is instrumental to the development of this area now and well into the future. Located on the border between existing residential and new business development, this parking structure had to incorporate an urban feeling that would increase pedestrian activity and nurture a safe and secure feeling. “Positioning the footprint of the garage on the site was a big challenge,” said Ken Russo, director of preconstruction at KBE Building Corporation. It needed to accommodate green space as well as sidewalk requirements set by the community. The final design gracefully bridges the visual gap between residential and business

Muhlbauer, AIA, LEED AP, and principal architect replied, “Precast concrete is a natural choice for parking garages due to its modular nature, corrosion resistance, and efficiency of erection.” Other advantages include unequaled structural capabilities and design flexibility. Exterior panels on the storefronts have the look and feel of brick, providing a durable solution effectively camouflaging the first two of the five levels of parking, making the entire building less imposing and more inviting. Russo believes that bringing Blakeslee Prestress, the precast concrete producer, to the project early on aided in the design process, and their cost impact analysis as the plans came together kept the The five level structure has 1,199 parking spaces and 25,000sf of retail space. project within budget. Erection started December 25, without being overwhelming. Russo attrib- motto was “Let’s just do it once.” 2008 and was completed May 8, 2009. In uted the design and meeting the deadline This 431,453sf, five-level parking less then four and a half months (mostly to the careful planning of the team, whose structure not only addresses the parking winter), 1,149 precast concrete members need with 1,199 spaces, but the first level were produced, delivered, and erected, on includes 25,000sf of retail space, while on Project Team Science Park Parking Garage, New Haven time, within budget, and with no surprises. the south end is a beautiful park adding to Design flexibility, cost control, and schedthe friendly atmosphere. This multi-use Owner: Winstanly Enterprises, New Haven uling are just some of the reasons Russo project is designed to engage and encourArchitect: BL Companies, Meriden believes precast concrete was the best soluage consumers and businesses alike. tion for this project. BL Companies of Meriden is both arPrecast Producer: Blakeslee Prestress, Inc., Branford Muhlbauer also adds that precast chitect and engineer on the project. When General Contractor: KBE Building Company, Farmington asked “Why precast concrete”? Rainer Continued on next page

A Chapter of the Precast/Prestressed Concrete Institute Photos courtesy of M+W Group

NORTHEAST

A Chapter of the Precast/Prestressed Concrete Institute

The use of precast concrete in manufacturing facilities allows architects and designers to go beyond simple design expectations. Precast panels, columns and beams have always provided a strong infrastructure, durability and life-cycle savings. Yet in the case of the GLOBALFOUNDRIES Fab 2 manufacturing facility, located in Malta, New York, the unique project requirement of an additional 924 waffle flooring precast panels were added to the existing 919 precast components. These particular panels are quite literally full of holes, allowing for pipe and wire chases, but more importantly essential to air flow for down draft air system used in the ultra clean environment. See for yourself how precasters can help your bottom line by: • Developing firm pricing and schedules early in the design process • Assisting your design team in the completion of drawings • Suggesting value-engineering ideas • Providing design solutions that satisfy structural and aesthetic requirements • Providing an accelerated construction schedule and occupancy timeline For more information on the benefits of precast concrete or to find a precaster in your area call 888-700-5670, or visit www.pcine.org.

To read the complete story on the GLOBALFOUNDRIES Fab 2 manufacturing facility, visit www.pcine.org/index.cfm/projects/high.

A Holey Requirement Shaped with Precast www.high-profile.com 11905_GlobalFoundries_Unistress_ad_2.indd

1

5/17/10 9:54:05 AM


August, 2010

11

High-Profile: Expert Advice Science Park Continued from previous page concrete addresses parking structure security concerns by “allowing for long spans, which create open visibility.” Long lines of sight with fewer obstructions means better visibility for people. The addition of glass stair towers dissipates the feeling of being closed in or isolated when using stairs or waiting for an elevator. Being able to see out as well as be seen makes occupants feel less isolated. Sustainable building design is not a new concept, but an evolving one that engages concern for the environment with a focus on use now and years from now. With that in mind, parking structures usually don’t have roofs, but this one does, creating a sunny, two-acre platform for future installment of photovoltaics and includes a separate electrical room. There are even parking spaces with junction boxes ready for the future installation of charging stations for electric cars. To top it off, if you have bike paths, you expect bikers, and this parking structure has two indoor bike parking areas. “The building will survive 100+ years of use and serve this neighborhood proudly,” said Russo. Times change and needs change... parking structure design must change. Precast concrete offers the design flexibility to embrace aesthetics, and enhance function while incorporating sustainability right now as well as for the future.

Who Is Managing the Risk?

by John S. Konopka with the contractor, and what risks are asRisk in the design and construction sociated with the various agreements? process can be daunting but manageable • Is the contractor or architectural/ if performed in the pre-development and engineering fee too low? Is there a reason pre-construction stages of the project. Con- why? It may not necessarily be a reflection structability, coordination of documents, of the economy. pricing, project leadership and scheduling • Can the contractor and architect/enissues can best be resolved during the de- gineers become participating partners? sign phase and prior to the first turn of the • Did the design and construction shovel. schedule provide enough time for a quality These topics, among others, can be review of design, pricing, comments, alterproblematic if left unresolved and allowed The cornerstone of any successful project to run their course. begins with an understanding that all particiMore often than not, pants, from owners and their management teams it will lead to discord to the architects, engineers, consultants, subamong project particiconsultants, and contractors, have responsibilpants and possibly a dispute at the concluity and ownership in the planning, design, and sion of the project. construction process to ensure the most compreA sampling of hensive and cost-effective approach to the project questions that warrant with the least amount of disruption. consideration from an owner’s perspective encompass the following and are embodied while in the prepa- native solutions, and approvals? ration/assessment stages of a request for • Is the project financially viable, and qualifications (RFQ) and request for pro- do you have the ability to accept the risks? posal (RFP). • Is there an experienced manage• Should an owner, facility manager, ment team assigned to the project to proproperty manager, tenant, or a CFO be en- vide leadership throughout the duration of titled to an open and thorough design and the project? Today’s highly volatile financial construction process? • What is the best form of agreement market, with lenders facing $1.2 trillion

of maturing debt within the next several years, combined with a limited resource of financially stable tenants and clients, will cause owners to face tough sledding in the foreseeable future to launch projects of any magnitude. Substantive loan-to-value ratios, completion guarantees, and personal guarantees will not be going away anytime soon. However, as the real estate industry inches toward recovery, lenders, owners, and CFOs will increase their focus on project risk mitigation to protect their investment and pre-project risk assessment will be an important element at the forefront of the process. The cornerstone of any successful project begins with an understanding that all participants, from owners and their management teams to the architects, engineers, consultants, sub-consultants, and contractors, have responsibility and ownership in the planning, design, and construction process to ensure the most comprehensive and cost-effective approach to the project with the least amount of disruption. As George Slye of Spauling & Slye put it, “The process is a symphony of details.” This risk perspective was prepared by John S. Konopka, president of the Construction Advisory Group, Inc. of Wakefield, Mass. and a former principal at Spaulding & Slye.

“Your Stone Solution Choice”

Great In Counters

5 Enterprise Lane • Smithfield, RI 02917 Phone: 401 233 0666 • Fax: 401 233 0669 www.high-profile.com


August, 2010

12

High-Profile: News

MMA Recognizes Judith Nitsch

Current rendering of the plan for the Big East Headquarters

Vision 3 to Design Big East HQ Providence, RI - The Big East Conference has selected Vision 3 Architects of Providence to design its new headquarters in the Gateway Center building, previously known as the American Express Building, situated between the Amtrak train station and the Blue Cross building in Providence. Construction of the new facility is expected to begin this summer. The new design will provide a grand reception area and private offices encompassing each of

the seven departments. Vision 3 Architects will provide architectural and interior design services for the project that involves renovations to the third floor of the Gateway Center. Founded in Providence in 1979, the Big East Conference is comprised of 16 colleges and universities. It is the largest and most diverse Division I conference in the country.

PHCC Scholarships Boston - The Plumbing Heating Cooling Contractors Association of Greater Boston (PHCC) presented 20 students with scholarships for a combined total of more than $26,000. PHCC awards the scholarships to children and families who work for

union plumbing and heating companies in the Greater Boston area. “We are very proud that this year we were able to give over $26,000 to deserving students from our employees’ families,” said Hugh Kelleher, the executive director of PHCC.

Boston - Judith Nitsch, PE, LEED AP BD+C, the president of Nitsch Engineering, was awarded a Doctor of Science, Honoris Causa degree by the Massachusetts Maritime Academy (MMA) at its 167th commencement on June 19, 2010. The honor recognizes Nitsch for her contributions to the engineering field and her efforts to encourage others to pursue engineering careers. A graduate of Worcester Polytechnic Institute, Nitsch has worked for 35 years in the field of civil engineering. She quickly advanced her career, becoming a vice president and branch manager at Freeman Engineering Company (a division of Schofield Brothers) within three years of beginning work. She became a member of the board of directors and shareholder of Allen & Demurjian. Within one year the company was renamed Allen, Demurjian, Major & Nitsch. In 1989, the company was purchased, and Nitsch decided to take the opportunity to found her own consulting engineering firm. Nitsch Engineering quickly grew un-

l-r: MMA board of trustees chair Paul Kelly, Nitsch Engineering president Judith Nitsch, and past MMA board of trustees chair General Jimmy Dishner der Nitsch’s leadership. As president of the civil engineering, land surveying, transportation engineering, sustainable site consulting, planning, and GIS firm, she oversees the firm’s strategic planning and marketing aspects and serves as principal-in‑charge on a select few of the firm’s design projects. A pioneer in the civil engineering profession, Nitsch has received many prestigious awards.

Risk Managers Expand System Norwood, MA - Risk Managers LLC announced that it has expanded its unique certificate of insurance management system to include not only contractors, lenders, property owners, and state government, but also to manufacturing entities and real estate holdings. Risk Managers LLC will now track, control, and manage the certificate process for a wide variety of industries.

efficient Choose precast concrete from Precast Specialties Corp. when you need to decrease the amount of time required for installation and increase the energy efficiency of your building. You can cut heating and cooling costs by up to 25% with precast concrete. Build smart when you choose easyto-install and energy efficient precast concrete for your next project because now, more than ever, it is of the utmost importance to design, plan and build with an eye toward the future. Call us today at 781-878-7220 x216 to schedule an appointment.

digimerritt.com/canon precastspecialtiescorp.com

www.high-profile.com

PrecastSpecialties SpecialtiesCorp. Corp. Precast


August, 2010

13

High-Profile: Facilities Development News

Suffolk Begins BMAC Overhaul

l-r: Manager Bud Breault, Barnstable Municipal Airport ; Amy Lind Corbett, NE Regional Administrator FAA; Thomas Bernardo, Community Relations Director for State Representative Demetrius Atsalis; Frederick Chirigotis, Barnstable Town Council President; Joseph P. Kennedy, III; Congressman William Delahunt; Jeff Gouveia, COO Northeast Region, Suffolk Construction; State Representative Tim Madden Boston - Suffolk Construction Company and officials of Barnstable Municipal Airport (BMAC) recently broke ground on a new air traffic control tower at the Hyannis airport. The five-story, 4,073sf air traffic tower will replace the existing tower and is Phase 1 of the 2010 Airport Improvement Program. Suffolk will also build a new 35,000sf passenger terminal, pending final state approval. Once the new tower and terminal are completed, the existing structures will be demolished. The airport, which is the third busiest in the state, will remain operational throughout construction. This will require a comprehensive safety planning and construction schedule that will minimize impact on airport operations. Suffolk was selected by BMAC to provide preconstruction and construction management services for the project.

The new tower will include Energy Star-rated heating, ventilation, and air conditioning and an energy-efficient elevator. The design elements are expected to earn LEED-Silver certification. It will be the Town of Barnstable’s first LEED-certified municipal structure. The $6.7 million tower is expected to be in service in 2011, and construction is scheduled to start immediately. The $17.6 million new terminal will replace the existing 50-year-old facility, following final state approval of a $13.1 million capital grant. The balance of the cost will be paid from airport reserves. Construction of the terminal is expected to begin after Labor Day. The final piece of the improvement program is the new $3.8 million vehicle access road, which will relieve traffic congestion at the airport rotary.

KBE Renews ‘50 Ways’ Initiative Farmington, CT - KBE Building Corporation (KBE) will continue its successful community outreach initiative “50 Ways to Make a Difference,” which lends a helping hand to people and organizations in the communities where the firm works and lives. KBE began the program last year in celebration of its 50th year in business. Like last year’s program, “50 Ways” will focus on community outreach projects l-r - South Windsor American Legion general manager Craig Zimmerman is joined by Jill Paradis of KBE that KBE will support either through monetary donations Building Corp. and South Windsor Mayor John Pelkey at Rotary Field in South Windsor. The donated funds will and/or volunteer efforts. help offset the costs at the facility. “Last year’s ‘50 Ways to Make A Difference’ program land, and donating a wheelchair accessible was exceptionally successful and we heard from our associates how swing for a group home in Middletown that much they value working at a company serves those with handicaps. KBE finished that embraces a philanthropic spirit,” said the year with a massive holiday toy and gift Simon Etzel, KBE senior vice president drive that brought smiles to more hundreds and “50 Ways” chairman. “Many said they of families. “We are continuing our program unwere proud to be a part of an organization der the ‘50 Ways to Make A Difference’ that regularly provides charitable support name, though we don’t consider ourselves to community agencies. Their enthusiasm is one of the reasons we decided to con- limited to 50 projects this year,” said Etzel. “We want to make a meaningful impact in tinue the ‘50 Ways’ program.” KBE, its employees and friends the community and will not be bound by contributed more than $100,000 in con- any predetermined number of projects. The tributions last year and in-kind services in goal is to be a difference maker for the projsupport of the “50 Ways to Make A Differ- ects and organizations we choose.” Etzel ence” program. Projects included painting says interest in the program from the coma senior center in Plainville, donating more munity has been high and that the firm has than 150 Thanksgiving dinner food bas- no shortage of projects to choose from. kets to families in Connecticut and Mary-

www.high-profile.com


August, 2010

14

High-Profile: Healthcare Facilities Development News

Translational Medicine The Penn State Cancer Institute at the Milton S. Hershey Medical Center by Kevin Sullivan A unique experiment in translational medicine, the new Penn State Cancer Institute, is the synthesis of a traditional bench science research facility with comprehensive outpatient treatment clinics in a single building. Dedicated to finding and delivering a cure for cancer, traditional boundaries of science are ignored as various modes of inquiry – similarly implemented in laboratories and exam rooms – form a dynamic investigative community. The building is the spatial embodiment of this translational model: Laboratory and clinical functions are strategically intermixed to encourage collaboration. Here, research activities are performed in the clinic and at the bench with little differentiation. It is hoped that this combination in a single facility will leverage synergistic exchanges, contracting the time between scientific discovery and practical implementation. This does not imply direct experimentation on patients but an increase in the contact between the two ends of the treatment-discovery system. The visual contact between patient and staff is a constant reminder that the building’s diverse occupants are continually at work to find a cure, promoting multiple modes of research and multiple types of treatment that inform and influence one another in unexpected cooperation. The project is the first phase of an

entry canopies, gardens, and roadways. The team, in collaboration with the owner, strove to provide dignified and hospitable spaces for healthcare that elevate equally the daily experience for caregivers, patients, and their families. Similarly, the efficient environment of the research laboratory is intertwined with a network of private and semiprivate collaboration spaces to build community. A linked series of lobbies, Copyright Rob Brewster public spaces, and green spaces deKevin Sullivan (r) working with model of the new fine the public realm where an exPenn State Cancer Institute. ploration of light, color, and texture ambitious large-scale construction project give a more human scale to the face at the Milton S. Hershey Medical Center, of the institution. While conveying a sense the main academic medical campus for of transparency and warmth, the scale of the university system. Payette has also the spaces varies to accommodate different designed the adjacent Children’s Hospital levels of privacy and activity. Curvilinear now under construction, a renovated and forms animate the public areas, highlightexpanded emergency department, and a ing prominent features such as reception new parking garage. These components counters, planters, waiting and conference create a critical mass that shifts the center areas. Throughout the day, dramatic skyof gravity of the entire hospital complex lights offer a changing array of light and through the redefinition of identity, access, shadow, transforming surfaces to benefit and the campus circulation systems. patients and staff alike. Rooted in nature, the primary organi“The new building shifts a paradigm zation element is the arc a concept gesture by housing researchers and clinicians tothat unifies buildings and landscape in a gether – facilitating the interactions that sweeping form. This establishes a structure will contract the time between research that binds together in a common language innovation and clinical implementation,” the discrete elements of building façades, said Dr. Henry Wagner, chair, department

architect

FINE ASSOCIATES Architecture and Interiors

of Radiation Oncology. The project unifies patient care services and research communities. Access to treatments, social services and outreach programs, once widely scattered, is now clustered around a single lobby. Previously isolated research enclaves, formerly in separate buildings, are now also gathered into a cohesive unit. To offer treatment on an intimate scale, cancer clinics and infusion therapy are duplicated on two floors, thereby connecting all patients to the healing garden through the building’s many transparencies. This configuration groups clinicians into small teams to improve communication and access to proven treatments and to experimental protocols. In response to the challenging program, a social experiment is also at work. Researcher investigators’ and medical clinicians’ offices are commingled on the top two floors around the beehive atrium to encourage spontaneous exchanges in hallways, breakout alcoves, cafés, consult rooms, and open lounges. In this activity hub, visual connections between patients and staff are a constant event: instilling confidence in patients in the quality of their care and inspiring researchers in their daily pursuit of knowledge and innovation. Kevin B. Sullivan, AIA is a principal and studio director at Payette in Boston.

REal EstatE JouRNal Proof NE/NY Tel: 781-878-4540 Fax: 781-871-1853

192 South Street Boston, MA 02111 Tel: 617-695-9171 Fax: 617-695-9360 fine-associates.com

Multi-Family Religion Corporate Education Private

Changes

New Proof

Proof Approved

To: Section/Size: Mass pom To: From: Patty Fax Number: Design, HR, IT: an integrated approach for mobile work success Pub. Date: 7-11 Approved by:

5 Lowell Avenue Winchester MA 01890 www.workplacesinc.com

t 781 218 2800

info@workplacesinc.com

HVAC Duct Design Fabrication Drawings Mechanical Piping Design & Coordination Plumbing Piping Design & Coordination Asbuilt Drawings www.EHKA.com 1502 Providence Hwy. Suite 12 Norwood, MA 02062 781-551-8111

www.high-profile.com


August, 2010

15

High-Profile: Educational Facilities Development News

Green Alumni Center Completed

Hampshire Fire Begins Keene Project

Eckman GC - Designed by Weller & Michal

Designed by Marinace Architects Keene, NH - Hampshire Fire Protection Co. Inc. of Londonderry will soon begin installing the automatic fire protection system at the Keene Middle School and SAU #29 building. According to Hampshire Fire Protection, the new building is equipped with 1,714 fire sprinkler heads. The Keene School project includes an eight-lane track,

two soccer fields, and a softball field. In addition to the school and its amenities, the project includes a new 10,000sf home for SAU #29. The project is contracted by MacMillin Company and designed by Marinace Architects, P.A. The projected completion date is July 2011.

Keene State College’s new Alumni Center Keene, NH - Keene State College’s new Alumni Center, the newest addition to campus, is a high-performance green, building. According to the Keene State Web site, it will be “an anchor, meeting place, and focal point for alumni activities and gatherings.” It sits on a small downtown site on Main Street in Keene, and was officially dedicated on June 4. The facility, comprised of more than 20,000sf of new and renovated space, contains offices, meeting rooms, a library, call center, and a large function hall. Eckman Construction served as general contractor for the project, which was designed by Weller & Michal Architects of

Keene. The building consists of a renovated historic wood-frame house, connected to a newly constructed main building with brick façade. Its unique features include many cast stone details, including cornices, architectural panels, and columns. As construction was completed, the building’s performance was tested and certified by Zero by Degrees, LLC of Fairlee, Vt. Testing showed the building to be more than three times as airtight as the average US commercial building. This excellent performance will save energy and result in operational cost savings for the college. Rendering of the new Keene Middle School

Your Single-Source for...Excavation • Site Work Landfill Closures • Soil Remediation • Utility Construction

Harvard First Science, Boston

Museum of Fine Arts - Boston

Astra Zeneca - Waltham

Harvard Allston First Science Center

35 Electric Ave., Brighton, MA 02135 • P.O.Box 35215 • Brighton, MA 02135 E-mail: Estimating@ajwelch.com Phone: 617-254-7550 • Fax: 617-254-0238 • Estimating Fax: 617-783-2072

Current Projects Include: Bovis Lend Lease – AstraZeneca, Waltham City of Attleboro – Pond Street Landfill, Attleboro Columbia Construction Co. – 16 Miner Street, Boston John Moriarty & Associates – Museum of Fine Arts, Boston LNR/Tishman Construction – Shea Memorial Drive, South Weymouth Naval Air Station Shawmut Construction – Apple Computer Shawmut Construction – Malkin Center, Cam bridge Skanska USA Building – Harvard Law School Enabling, Cambridge Suffolk Construction – Cambridge Residence, Cambridge

Suffolk Construction – Long Island Day Camp, Boston Turner Construction – Harborview, Boston Turner Construction – Harvard Life Science, Boston Turner Construction – Mass General Hospital, Boston Turner Construction – RISD Memorial Hall, Providence RI Walsh Brothers – Johnson and Wales, Providence RI Walsh Brothers – Lahey Clinic, Peabody Walsh Brothers – Newport Grand Casino, Newport, RI Walsh Brothers – North Shore Medical Center, Danvers Walsh Brothers – St. Elizabeth’s Hospital, Brighton Walsh Brothers – Woman & Infant Hospital, Providence, RI

Find out how you can start laying the groundwork for the future success of your next project - call The Welch Corp. at 617-254-7550 www.high-profile.com


August, 2010

16

High-Profile: Educational Facilities Development News

Four Summer Projects for Cutler

Contact Chris Hadorn: 774.259.2390

Worcester, MA -- Cutler Associates, a design and construction firm headquartered in Worcester, will build four projects this summer for local colleges and universities: Clark University in Worcester, Mount Holyoke College in South Hadley, Mount Ida College in Newton, and the University of New Hampshire in Durham, N.H. At Clark University, two residence halls will be renovated and a new admissions annex constructed. The work in the 1958-built freshman residences, Wright and Bullock halls, will create a contemporary identity for the facilities, both inside and out, updating the lighting and finishes to fashion a modern environment that will be comfortable and welcoming for today’s students. Additional common spaces will be added to improve community interaction. Accessibility will be improved by the addition of elevators. The 67,600sf renovation is designed by Cutler Design. Constructed adjacent to the existing Admissions Building, the new annex will serve as a meeting and conference space for prospective students. The 7,200sf, steelframed building has a brick veneer with a Trombe wall and is designed by Lamoureux Pagano Architects. At Mount Holyoke College, Porter Hall will be renovated. This is the sixth in a series fast-tracked summer residence hall updates that Cutler completed on the campus. Designed by Cutler Design, the proj-

ect will update the mechanical, electrical, plumbing, and fire protection infrastructure of the 1897-built building, increasing energy efficiency, providing life-safety updates, and adding comfort for students. At the University of New Hampshire, Cutler is designing and building a new Turbulence Research Facility. This is Cutler’s fourth major project on the Durham, New Hampshire campus. The 12,400sf facility will include a 300-foot wind tunnel that will support research by faculty and students. The $2 million project is designed by Cutler Design and will be completed in the fall of 2010. At Mount Ida College, Cutler’s team will update the 350-bed Malloy Hall, the college’s largest residence hall on campus. The project will update the courtyard, entry lobby, and reception area and a variety of common areas including lounges, bathrooms, kitchen, and laundry. HVAC upgrades will add efficiency to the heating and cooling system of the buildings. This project will be completed on a 12-week summer construction schedule and is the third major project Cutler has delivered on campus.

Rendering by Cutler Design

Clark Wright Hall

State University of New York Maritime College rendering

EYP Designs Academic Building Albany, NY - EYP Architecture & Engineering was selected to provide design services for a new world-class academic building for the State University of New York Maritime College (SUNY Maritime), located on its historic Fort Schuyler campus in Throggs Neck, N.Y. In addition to serving SUNY Maritime’s nationally recognized academic programs, the building will also be used as a conference center, providing a signature location for large groups to con- Rendering of interior view of the academic vene throughout the year. building for the State University of New York Currently in the design phase, Maritime College. EYP’s multidisciplinary team will provide architectural design, programpedagogical styles; a large, reconfigurable, ming, academic space planning, MEP, and multi-purpose room with a pre-function structural, engineering, and other related area; formal and informal student interacdesign services for geotechnical, civil, tion areas; departmental and faculty officsite, and utility infrastructure. Flexible and es; conference rooms; an outdoor terrace; technologically advanced, the building is and an accessible roof. extremely adaptable. EYP’s contemporary design will EYP is planning for facilities capa- be clad with technologically advanced ble of supporting undergraduate teaching glass and metal panels able to respond to during the day, graduate and professional the sometimes harsh marine environment. programs in the evenings, regimental as- EYP will also use rusticated stone panels in semblies, and conferences throughout the order to visually connect the new building year. These facilities will include class- with historic stonework of Fort Schuyler, rooms capable of supporting a variety of the oldest structure on campus. seating configurations to match different

MARR CONTRACTOR’S SUPPLY WAREHOUSE 617.268.4592 Experienced Staff / Competitive Pricing / Extensive Inventory / Convenient Location

Heavy Duty Forming Accessories Form Ties and Form Release General and High Performance Grouts Horizontal, Vertical and Overhead Patching Material Curing Compounds and Floor Hardeners Waterstop and Hydraulic Cement

RENTALS: Temporary Fencing / Temporary Heating Ground Thaw & Concrete Cure Equipment

Winter Condition Items: Tarps / Blankets DOT Approved Materials Safety and Fall Protection Items Epoxy and Mechanical Anchoring Systems

C H E C K U S O U T @ 3 4 5 D O R C H E S T E R AV E S O U T H B O S T O N M A Marr Scaffolding Company One D Street South Boston, MA 02127 Boston: 617.269.7200

www.high-profile.com

web: marrscaffolding.com

web: marrcontractorstore.com

Branch Offices: Springfield MA 413.739.2121 / Providence RI 401.467.3110


August, 2010

17

High-Profile: Educational Facilities Development News

SCUP - Call for Proposals Now Open! What are you doing right now to help your institution navigate through the complex challenges facing higher education? How are you integrating these planning efforts across your campus and with your institution’s vision, mission, and academic priorities? A focus on strategic transformation, improving student success, and managing economic pressures must lead us to fresh collaborations, dynamic insights, and new approaches to teaching and learning. The continued success of higher education as an engine of civic engagement and economic prosperity requires each of us to share what works. What can you of-

fer to colleagues that they can take back to their campus and implement? What will help them strengthen their campus’ ability to accomplish the critical missions of postsecondary education? We invite you to submit a concurrent session proposal. Your presentation could be part of our robust education program that will present practical solutions and applications, fresh approaches, and best planning practices. Learn more and submit your proposal. Deadline: October 1, 2010 For further information: www.scup. org

Pinkerton Academy Bldg Under Way Eckman CM - Designed by Marinace

TMS at The Music Hall Loft Portsmouth, NH - TMS Architects will continue its longtime association with The Music Hall in Portsmouth by providing architectural services required for The Music Hall’s latest venture, The Music Hall Loft. The Loft, located at 131 Congress Street in Portsmouth, will offer the community a variety of flexible interactive spaces, including studio and classroom space and a 100-pluss seat multipurpose café theatre. Large windows fronting Congress Street will allow passersby the opportunity to see the action inside, increasing the excitement and interest in The Music Hall’s programming.

Freshman Academy building at Pinkerton Academy

Patricia Lynch, The Music Hall’s executive director, promised that the space will offer “a unique experience – a world-class, modern, downtown space that is simultaneously an intimate theatre (with food/drink availability) and a high-traffic space for educational programming.” John Merkle, AIA, principal at TMS and Nicole Martineau, AIA, TMS project architect, have been involved with The Music Hall’s renewal from the start, working on the restoration of the proscenium arch, the theatre’s dome and the creation of dramatic new first floor lobby space.

Derry, NH - Construction of a new Freshman Academy Building at Pinkerton Academy in Derry is well under way. Eckman Construction is the construction manager for the 135,000sf building, which marks Eckman’s 50th, or “golden,” school construction project. Foundations are in place, and work is proceeding on schedule for a July, 2011 completion. The project site on Pinkerton’s busy campus is adjacent to the vocational and social studies buildings. The new building was designed by Marinace Architects of New Hampton. The brick structure will have a soaring three-story lobby. It will contain 29 classrooms, science labs, computer labs, a lecture hall/ auditorium, as well as a cafeteria and kitchen. A

dedicated building for freshmen will allow students to have most or all of their classes within one building for their first year.

Foundations are in place, and work is proceeding on schedule.

B.L.www.makepeace.com MAKEPEACE • (800)835-0194 Oce sets a NEW standard with the PlotWave 300 with impressive GREEN Credentials

PRINT 24” x 36” drawings for as little as $.06 per sq. ft. • 24” x 36” prints in 30 seconds • 1 or two roll models

$15,500* Oce Plotwave 300

Dual roll, plot/copy/ and Adobe Postscript

scanning

Flexible Leasing Available

* With trade-in of an eligible wide format printer or copier. Pricing excludes tax shipping and installation.

Canon imagePROGRAF Wide Format Inkjet Printers

www.high-profile.com


August, 2010

18

High-Profile: Facilities Development News

Callahan Breaks Ground on Care Ctr The Architectural Team Architect

Design Exchange interior

Design Exchange to Open Lerner Ladds + Bartels Relocates Pawtucket, RI - The creative buzz in Pawtucket will be getting louder when architecture firm Lerner Ladds + Bartels moves to a historic mill building at 161 Exchange Street. The office will be relocating from its roots in Providence early next year just in time to celebrate its 75th anniversary. Partners Chris Ladds and Kathy Bartels recently purchased the building and are planning a complete renovation, creating 15,000sf of available office and retail space. The west wing building is the last piece of the puzzle in rehabilitating this important

area of Pawtucket. Once the renovation is complete, the complex will collectively be known as the Design Exchange. Morris Nathanson, principal of Morris Nathanson Design, envisioned the Design Exchange as a consortium of designers, craftspeople, and artisans. The name of the complex was crafted for its dual meaning as a collaborative exchange of design ideas at an arts-centered location on Exchange Street. The proposed renovation project will realize Nathanson’s vision and enhance the adjacent buildings that are already bustling with creative pursuits.

Needham, MA - Callahan, Inc. and Northbridge companies recently held a groundbreaking ceremony for the new Avita Memory Care Center being built in Needham. In attendance were: Northbridge Cos., owner; Waypoint, owner’s rep; Callahan, Inc. executives and staff, construction manager; and Needham Bank executives. This project will be a 36,000sf, twostory wood frame structure consisting of 62 units intended for the constant care of patients with memory issues. The building is on a four-acre parcel in Needham. It includes a commercial kitchen, a “brain gym,” a beauty salon and an assembly room. Callahan, Inc. is self performing all sitework on the project. The development l-r Jack W. McGeorge, president of has been under way since March of 2010 and Needham Bank; James C. Coughlin, CEO will be completed in March of 2011. of Northbridge Cos.; Wendy A. NowokunThe architect on this project is The Ar- ski, president of Northbridge and Stephen chitectural Team. DeCesare, Needham Bank Through its relocation, LLB is emphasizing its commitment to building restoration, adaptive reuse, and design collaboration. The award-winning firm will be occupying the top floor of the four-story building. The office will immediately bring with it 20 professional employees and support staff with an active involvement in the design and arts scene. With floor plates at 5,000sf, the size of the building is a perfect fit forLLB; they hope to find like-minded creative profes-

sionals to fill the second andthird floors. Their current location in Providence has served them well. “It’s been an asset to have a space where we could expand or contract as needed. It’s also been great being in this location, but for some years now, we’ve been bursting at the seams,” says Bartels. “The goal is to attract creative professionals to the Design Exchange to forge opportunities in collaboration under one roof. continued on page 31

Roof Anchor Installations

Roof Safety Is Our Business Nationwide Based on ANSI/IWCA I-14.1 Specializing in: Manufacturing, Installation and Testing / Certifying of

ROOF ANCHORS DAVIT ARMS OUTRIGGER BEAMS

110 Forge River Parkway, Raynham, MA 02767 T: 508-942-6248 F:508-697-4390

www.jpobelisk.com

www.high-profile.com 437281_JPObelisk.indd 1

7/13/09 10:45:36 AM


August, 2010

19

High-Profile: Facilities Development News

Foundations Under Way for TownePlace Pro Con Architect and CM

3D laser scan for offices at Legacy Place.

Harry R. Feldman Completes Scan Dedham, MA - Harry R. Feldman, Inc. has completed the 3D laser scanning and plan drafting for 40,000sf of office space built out by Citizen’s Bank. The offices were located at Legacy Place in Dedham, the new Lifestyle Center developed by W/S Development. The client needed highly accurate core and shell floor plans, a detailed contour plan of the concrete slab, as well as a

reflected ceiling plan showing all structural elements and utilities. Since the design called for skylights and dropped-ceilings, there was a need for all horizontal locations and vertical clearances to be accurately shown. All field work and plan production was completed in two weeks and the client was able to have bid documents out to construction immediately.

GZA Gets Bridge Contract Portland, ME - GZA GeoEnvironmental Inc., a leading environmental and geotechnical consulting firm, has been named as the geotechnical subconsultant of the Reed & Reed – T.Y. Lin International Design Build team for the Maine Department of Transportation Veteran’s Memorial Bridge project in South Portland and Portland. The bids were opened in January of this year and the team received the highest technical score and the lowest, price, best

value of the three short listed firms that submitted bids for the job. The winning bid was $63,122,000. The project includes replacing an existing 2,000-foot long bridge with a new bridge carrying four automobile lanes and a bicycle lane along Route 1A over the Fore River from South Portland to Portland. Chris Snow, PE of GZA is the project manager and Russ Morgan, PE and Walt Jaworski, PE, ScD of GZA are the principal in charge and consultant/reviewer.

Kingstown, RI – The foundations are being placed for the new TownePlace Suites by Marriott in the Quonset Business Park. The hotel is being built on a 4.6 acre site conveniently located across from The Shops at Quonset Point. Pro Con, Inc of Manchester, N.H. is the architect and construction manager for the $7.5 Rendering of the new TownePlace Suites by Marriott million design-build in the Quonset Business Park project, which is being developed as part of the Island. Pro Con, Inc plans to use regional Gateway Parcel Master Development by and recycled materials in construction and New Boston Fund Inc of Boston and Wa- incorporate environmentally beneficial terford Development of Needham, Mass. strategies in the hotel’s development and The developer has registered the daily operations. The hotel will utilize a four-story, 103-key hotel with the US Green geothermal system for heating and cooling Building Council (USGBC) and intends to the 55,453sf building. pursue the USGBC program making it one “The foundations will be completed by of the first LEED certified hotels in Rhode the end of July and framing will begin in midAugust,” stated Pro Con, Inc’s project manager. “ The hotel exterior will feature a brick veneer base with clapboard and smooth panel siding. We are on target for March 2011 completion date for the hotel.” Foundations are being placed for the new design-build project.

Experience the Porter Difference Design • Fabricate • Supply • Install • Steel Truss Systems • Panelized Wall Systems • Steel Framed Residences

The Porter Difference Porter Panel & Truss is unique in the building components industry. Only our founding partners have invested a combined 50 years of practical experience working with existing products before manufacturing their own. This is why they insist on methods and systems that absolutely perform on the job. These modern building systems incorporate the advantages of building in a controlled environment with increased efficiency in the field, resulting in superior quality and accelerated on-site construction. Give us a call and see how we can make your next project easier.

Strength and Performance Through Innovation

207-699-2339 Info@porterpanels.com • www.porterpanels.com www.high-profile.com

High Profile Ad 01-10 1

12/18/09 1:31:05 PM


August, 2010

20

High-Profile: Facilities Development News

TMS Chosen for Country Club Reno Hampshire Fire Protection Projects Portsmouth, NH TMS Architects was selected by the membership of the Salem Country Club, established in 1895, to renovate and expand its existing clubhouse. The project will include renovating and expanding the historic Donald Ross Dining and Grill Rooms. The new design will improve the current Rendering of the renovated and expanded floor plan and add an addiSalem Country Club tional 1,500sf to the memSalem CC has hosted four nationbers’ dining area. The new layout will enal championships, including the USGA hance the membership’s dining experience Women’s Open and the 2001 Men’s Seand provide seating flexibility, including a nior Open. The Club has consistently been new bar, casual lounge, and several small selected as one of Golf Digest’s “Top 100 dining spaces for smaller group functions. Golf Courses.”

Durham, NH - Hampshire Fire Protection Co., Inc. will be a part of the renovations at the University of New Hampshire in Durham by installing the fire sprinkler system in the chemistry department. The outdated Parson’s Hall has been under renovation, consisting of interior transformations, since May 2009. The renovated facility will house wet teaching laboratories, multiple research labs, the University Instrumentation Center, and general classroom space. All four of the three-story wings will be under construction to include office space for faculty, researchers, technicians, and students as well as conference and break rooms. Hampshire Fire Protection also is installing the fire protection system during the renovation of the Library and Miller

Humanities Building at Kimball Union Academy in Meriden. Contracted under Pizzagalli Construction Co., Inc., the renovations will include 18 new classrooms and department offices. Hanover, NH - Hampshire Fire Protection Co., Inc. will be working on installing a fire protection system in the new fourstory 6 South Street Hotel in Hanover. Equipped with approximately 70 rooms, a small restaurant, lounge, underground parking garage, conference room, and art fitness center, this boutique-like hotel is located right around the corner from Dartmouth College. The general contractor of this project is Opechee Construction and is projected to be completed in 2011.

First Works Program Graduates Springfield, MA - Twenty-seven Springfield residents graduated from the Springfield Works building trades preapprenticeship program recently during a ceremony at the Sheet Metal Workers Local 63 in Springfield. While unemployment is high in the current economic downturn, the construction industry will be facing a shortage of qualified new workers. Springfield Works was created to help address this shortage and to educate disadvantaged

youth, womenn and people of color about the wide range of career opportunities available in the construction industry and to enhance their job readiness skills. According to Springfield Works Program Director Mike Florio, “Springfield Works provides participants with an inside look at building trade careers and entrepreneurial opportunities in the green economy.” Florio also serves as the executive director of Western MassCOSH. 6 South Street Hotel in Hanover

*Purchase price is contingent on any listed lease option or additional purchase of one year Ricoh maintenance agreement for $890.00 or two year premium onsite maintenance agreement for $940.00. Leases are 60 mo FMV. All taxes excluded. Ricoh maintenance and service plans cover up to 15k sq’ per year. Pricing includes standard dock delivery. HP pricing expires 8/31/10. Ricoh pricing expires 8/31/10.

www.high-profile.com


August, 2010

21

High-Profile Feature: Springfield Data Center

Springfield Data Center Groundbreaking

Designed by TRO Jung|Brannen, MEP Cosentini Assoc., CM Skanska USA Building pringfield, MA - Recently, Governor Deval Patrick and local officials broke ground on the new state-ofthe-art Springfield Data Center (SDC). The SDC will serve as a secure housing facility for the state’s electronic records and data systems while also providing critical backup for the Commonwealth’s existing primary data center. According to Steve Eustis, SVP of Skanska USA Building, the idea is to boost efficiency, lower costs, and have a more sustainable operation. A new data center for the Massachusetts Information Technology Division, this mission-critical facility has been designed to a Tier 3 data center standard.

S

Renderings courtesy of TRO Jung|Brannen

View west along Elliot Street the environmental footprint of the project. The building infrastructure includes a complete system of electrical distribution and associated cooling infrastructure designed to an N+1 redundancy level. The equipment, distribution, controls, etc. for these critical systems is designed such that failure of a single piece of equipment will not compromise the operation Rendering of interior Springfield Data Center of the facility. This applies to each aspect of the infrastructure, from the main electrical service to the The facility will house critical data systems individual distribution routings throughout for major departments for the state, such as the facility. the Department of Revenue, the Treasury The 148,000sf building is designed Department, and the Criminal History to drastically minimize energy use through Systems Bureau, which supports the State efficiency measures and other design feaPolice Department. This facility has been tures. It will be constructed with the latest designed to provide the highest level of op- technologies in energy efficient data center erational efficiency and redundancy to sup- infrastructure, sustainable building design, port these operations. and consolidated computer technology. The facility will include 24,000sf of “The Springfield Data Center is a computer floor space for critical data sys- project with a multitude of benefits,” said tems equipment. This area was designed Governor Deval Patrick. “In addition to with power and air conditioning to serve securing critical data used by thousands of an average equipment load density of 200 state workers, this facility will be a nationwatts psf throughout computer areas, with al model for environmentally friendly data supplemental cooling for high-density ar- storage and an economic boost for the City eas within the space. In order to provide of Springfield.” this level of electrical and air conditioning The new data center is being designed infrastructure, significant planning for the with a host of efficient technologies, inconfiguration of the equipment space was cluding fresh air cooling, EnergyStar servrequired to support this density. The de- ers and an advanced energy management sign of the systems includes CFD analysis system, which will make the new facility of the air conditioning systems to model among the most energy efficient data centhe environmental systems and their ability ters in the country. to properly address these significant equipThe state’s Division of Capital Asment loads. set Management and Information TechnolThe building, designed to meet ogy Division have also been working with LEED Gold certification, includes several Western Mass Electric Co. to maximize innovative green building features. The potential rebates available through the utilcooling system utilizes a heat wheel air ity to lower front end costs while enhancside economizer and electric centrifugal ing energy efficiency at the new facility. chillers to minimize the energy required “This is a remarkable project that to cool the computers. Within the equip- blends many aspects of our Adminisment spaces hot aisle, containment will op- tration’s focus for long-term economic timize the flow of cooling air through the growth,” said Lieutenant Governor Timoequipment racks. The UPS systems utilize thy Murray. “Thanks to the support of the flywheel energy storage rather than large state and congressional delegation, as well quantities of lead acid batteries which must as the City of Springfield, this facility will be replaced on a regular basis to minimize

mix innovative principles to deliver immediate jobs and services for the region and the state.” The facility will use cost-competitive energy sources and a number of sustainability features, including capture and reuse of rainwater, natural sunlight for staff areas, and recycling of existing building materials in construction. Facility equipment will also be Energy Star certified. The new data center will provide an economic boost to Springfield, building on the Administration’s continued long-standing partnership with the City. In addition, the facility is expected to create an estimated 70 full-time jobs, with as many as 200 construction jobs supported by the project

over the course of the two-year construction phase. It will also be accessible by public transportation. The SDC will be built at the site of the former Technical High School, which closed in 1986 after more than 80 years. A substantial portion of the Elliot Street entry façade and three bays of the east and west façades of the Technical High School will be preserved under the project, including “The Technical High School” inscription above the front doors. The SDC is a key part of the Administration’s strategy to manage the Commonwealth’s technology more effectively by consolidating the Executive Department’s 183 widely-dispersed data centers into two efficiently managed facilities. The data systems and electronic records stored in the Commonwealth’s data facilities are used by thousands of state workers – including police officers, social workers and health professionals – needing immediate access to sensitive information. This highly-secure facility will also provide backup for the Commonwealth’s primary data center, the Massachusetts Information Technology Center. “This new facility will be state of the art for energy efficiency in data centers,” Energy and Environmental Affairs Secretary Ian Bowles said. “Not only will the facility save about $3 million per year in energy costs once fully operational, but it will also stand as a significant symbol of Continued on page 22

www.high-profile.com


August, 2010

22

High-Profile: News

PICP Best Management Practice

by Larry Nicolai Although winter seems a long way off, especially considering the unprecedented heat so far this summer, it is a frequent topic among those seeking information from Pavers by Ideal about its Eco-Stone and Aqua-Brick permeable pavers. Permeable Interlocking Concrete Pavement (PICP) is an acknowledged Best Management Larry Nicolai Practice (BMP) and gaining a great deal of attention for managing stormwater runoff, yet the myth persists that they do not work in cold climates. Let’s take a look at this myth and provide the facts to put it to rest. If a picture is worth a thousand words, then the parking lot at Drake Hill Commons (formerly Lafayette Road Office Park) in North Hampton, N.H. provides the information of a thousand words. Covering 15,000sf, the Eco-Stone Permeable Paver parking lot continues to be attractive, structurally sound, and high performing despite enduring over 10 years of harsh New England winters since its installation by The Griffen Group in 1999. It has withstood countless freeze-thaw cycles, regular snow plowing and sanding, and, with just routine maintenance by conventional street sweepers, it continues to drain water effectively. On a recent trip to the area, we stopped by to take a look and perform the

quick and telling “water bottle test.” We poured the contents of a couple of 20 ounce water bottles on the surface, and the water immediately drained down through the pavement. And let’s not forget to mention durability of the pavers themselves, as this is another question we frequently field. Unlike other types of porous pavements, permeable pavers are not porous. The pavers are made using the same mix design and, hence, have the same strength and durability as our regular paving stones. How Drake Hill Commons demonstrates how to meet strinstrong? We routinely manufac- gent stormwater regulations with permeable pavers. ture our pavers to be 10,000 psi – that’s twice as strong as concrete and three times that of asphalt. They ning. For safety, sanding becomes necescan support the heaviest of loads, are du- sary. In the case of permeable pavers such rable to withstand the toughest freeze-thaw as Eco-Stone and Aqua-Bric, the melt-off conditions and properly installed, are snow drains into the openings down through the plow safe. Permeable pavers provide rapid pavement. Minimal sand is required to infiltration through indentations molded provide a slip-free surface, and whatever along the edge of units. When assembled sand remains when spring arrives can be together they form a series of openings easily cleaned from the joints and openacross the pavement. The openings and ings using conventional street sweeping joints in the pavement surface funnel water equipment. Drake Hill Commons is one of the into the base where it is filtered as it drains many projects that demonstrate our perslowly into the soil. Now that we meable pavers are a practical solution for have addressed one myth, let’s look at an owners and developers to meet to the inoften over looked benefit of permeable creasingly stringent stormwater regulapavers, one that improves safety as well tions being implemented by federal, state, as lowers maintenance expenses. During and local governments. the winter, snow and ice thaw during the Larry Nicolai is sr. vice president of day, forming puddles that freeze as temPavers by Ideal in Westford, Mass. peratures drop later in the day and eve-

Rhino Receives SMPS MCA South Hamilton, MA - Rhino Public Relations, a specialty public relations agency, has been honored with a Marketing Communications Award (MCA) from the Society of Marketing Professional Services (SMPS), recognizing the successful national media relations campaign for its client, GEI Consultants, Inc. This is the second year in a row that Rhino PR has been recognized by SMPS for its implementation of GEI’s public relations program. GEI Consultants is a national geotechnical, environmental, water resources, and ecological science and engineering firm comprised of a multi-disciplined team of engineers and scientists who deliver engineering and environmental solutions to its diverse clientele nationwide. The focus of the award is the national public relations program and strategy that Rhino PR helped GEI Consultants create and implement. The results of this program included 71 media- related initiatives throughout 2010. This increased media visibility far exceeded the goal set at the beginning of the campaign. “Rhino PR’s expertise and dedication has helped make GEI one of the most visible brands in our target markets across the country,” said Kelly Cohane, corporate marketing manager for GEI. “Their work has helped GEI achieve recognition across

www.high-profile.com

Frank Monkiewicz Photography |

Chris Stockwell, chief marketing officer, GEI; Susan Shelby, CPSM, principal, Rhino PR; Kelly Cohane, corporate marketing manager, GEI; Jennifer Shelby, CPSM, account manager, Rhino.

discipline areas, and has helped maintain the culture within GEI that encourages the healthy communication of company news. Rhino PR continues to help us communicate expertise in our chosen fields, and interacts with industry players and internal staff seamlessly.” Rhino PR was recognized with a third-place award in the category “External Corporate Communications Program: Media Relations Campaign” at the SMPS awards gala held in July at the SMPS National Conference: Build Business in Boston.

SMPS Awards Standard Builders Boston, MA - Standard Builders received the 2010 national Society of Marketing Professional Services (SMPS) Marketing Communications Award in the Direct Mail Campaign category at the organization’s annual conference in Boston on July 15, 2010. The Direct Mail Campaign was comprised of a series of six postcards, used to increase brand recognition within the firm’s target audience: healthcare, institutional and commercial market sectors. The goal was to provide the recipient with current, relevant information supported by client testimonials. MCA winners receive national publicity via: national press releases sent to industry media, SMPS publications including Marketer, the SMPS Web site (www. smps.org), and listing in the DesignIntelligence Almanac of Architecture & Design.

Reilly Honored SMPS Award Boston - The Society for ment Award, nominees must Marketing Professional Servichave demonstrated measurees (SMPS) awarded Michael J. able achievement across several Reilly of Reilly Communications areas of professional practice, the organization’s highest indiincluding marketing research, vidual honor, the 2010 Marketing teaching, professional leaderAchievement Award. The award ship, marketing communicawas presented during the SMPS tions, and program innovation. national conference in Boston. He Reilly is a past SMPS nais the 20th recipient of the Martional and Boston chapter presMichael Reilly keting Achievement Award in the ident, a contributing editor for 37-year history of the Society. the professional services marAccording to SMPS, the award “rec- keting journal Marketer, an adjunct faculty ognizes an individual marketing profes- member at Boston University’s College of sional whose achievements and lasting Professional Education, and an SMPS Felcontributions to the professional services low. He is also a director and past president field are exemplary.” To qualify for jury of the Massachusetts Building Congress. consideration for the Marketing Achieve-

SDC Groundbreaking Continued from page 21 the Commonwealth’s commitment to leading by example for all other such facilities around the region, nation and world.” Funding for the data center was included in the General Government Bond Bill, approved by the Legislature and signed by the Governor in 2008. Team members include Cosentini Associates as the mechanical, electrical, and plumbing engineer, D.G. Jones as

the cost estimator, Lim Consultants as the structural engineer, Nitsch Engineering as the civil engineer, Preservation Technology as the historic preservation consultant, Epsilon Associates as the enabling consultant,Strategic Building Consultants, as the commissioning agent, TRO|Jung Brannen as the Architect, and Skanska as the general contractor. Construction on the data center is expected to be complete by May 2012. When complete, the $110 million facility will be a national model for green technology.


August, 2010

23

High-Profile: Awards

Photo by www.paulburkphotography.com

Connecticut College

IPI Partnering Awards New London, CT - The International Partnering Institute (IPI) has awarded two partnering awards to Connecticut College, KBE Building Corporation, the design teams, and trade contractors for the College’s new Fitness Center and its 2008 Asset Reinvestment Program. Partnering is a project management philosophy that fosters a collaborative team relationship between owners, contractors, design teams, and trade contractors, resulting in significant benefits to process, cost, and schedule. The partnering concept has been the foundation of more than 250 Asset Reinvestment projects at the College and has resulted in the completion of nearly $30 million in construction work since 2005 – all without a single claim. The new Fitness Center project was recognized with a 2010 Ruby Partnering Award, recognizing the team’s commitment to partnering on the design and construction of this $4.5 million, 14,000sf timberand-glass addition and renovation. The project team included EYP Architects and Veridian Consulting.

The College’s 2008 Asset Reinvestment Project received a 2010 Ruby Legacy Partnering Award, recognizing “projects that have stood the test of time as outstanding examples of partnering.” The project encompassed 64 separate renovation, upgrade and other construction projects – nearly $7 million in construction that was executed over the 12-week summer session. In addition to no claims, the project achieved a 5% reduction in project costs and no reportable OSHA injuries. The Asset Reinvestment Program is the College’s seven-year, $53 million campus improvement program, launched in 2005. As the College’s Construction Management partner, KBE has worked each year with the College, its design teams, trade contractors, and vendors to plan and complete an extensive range of projects each summer. The 2008 Asset Reinvestment project team included Noyes Vogt Architects, Ellenzweig Architecture and Planning, General Design and Drafting, Rusty Sergeant AIA, EYP Architects, and CLA Engineers.

Scaffold Erection & Dismantling Services a t M a r r engineering . design erection and dismantling sectional frame . systems scaffold t u b e a n d c l a m p . scaffold enclosures rolling towers . debris chutes mast climbing work platforms

617.269.7200 w w w. m a r r s c a ff o l d i n g . c o m

Marketing is a must! e-blast weekly

Senate Construction Commended Shirley, MA - Senate Construction Corp., located in Shirley, received a Certificate of Commendation for an excellent safety record for 2009 from the Associated General Contractors of America. The award was presented at the annual AGC meeting.

Print publication monthly

l-r: Brian Driscoll, Bob France, Senate Construction president; Bill Hamel, sr. project manager; and Mike Cusack

Johnson Receives AIA Medal Boston - Cannon Design, an internationally ranked architectural, engineering, and planning firm, announced that Stephen Johnson, FAIA, a principal and leader of the firm’s Boston office, has been awarded the College of Fellows Medal by the American Institute of Architects. Johnson joins a distinguished group of professionals

Stephen Johnson

whose architectural accomplishments and dedication to the field are second to none. His body of work is recognized by its fresh design approach and connection to context. Johnson’s work has won four national AIA Honor Awards for Design and two Honor Awards from the National Trust for Historic Preservation.

Get the word out about your company and your services to facilities owners, managers, developers, architects, engineers and contractors in New England using proven traditional and new media methods of High-Profile Monthly. Contact Michael or Anastasia 781-294-4530 or e-mail editor@high-proflie.com.

News feed daily Place your banner ad on FastFacts Fridays and receive free color for your next ad in print. Call Today!

www.high-profile.com


August, 2010

24

High-Profile Feature: Armed Forces Reserve Center

Teamwork Essential When Serving Those Who Serve Our Nation KBE Ventures Leads Design/Build Team for New Armed Forces Reserve Center water infiltration • The Training Center building will include a green roof to reduce heat island effect – the first in the nationwide Reserve program.

M

iddletown, CT - How do you design and build a facility to meet the demands of our modern military? You take a page from their playbook: work hard, work together, and keep your eyes focused on the mission. For the project’s design-build team – KBE Ventures (KBE Building Corporation and DeRita Construction), S E A Consultants, DiBlasi Associates, Architectural Engineers, Art Engineering, and the many local, union, and non-union trade contractors – teamwork is precisely the prescription they are using to build the Armed Forces Reserve Center in Middletown. “The KBE Ventures design-build team has thus far demonstrated true teamwork in moving this project forward on our behalf,” said Diane E. McCartin, project manager, US Army Corps of EngineersLousiville District’s Chief - East Section Reserve Support Team. The fast-tracked project calls for a 164,000sf Training Facility with administrative, educational, assembly, library, learning center, vault, weapons simulator, and physical fitness areas for four Army Reserve units and six Connecticut Army National Guard units. The center will also include a 36,000sf vehicle maintenance shop, and a 4,000sf unheated storage facility. Set on a 42-acre park, the facility will also include parking areas, walkways, and access roads. Approximately 100 personnel are expected to use the campus. The

Continued on page 30

Rendering courtesy of S E A Consultants.

The new Training Center at the Middletown Armed Forces Reserve Center will feature a green roof to help reduce the heat island effect - part of the project’s overall focus on sustainable design and construction. facility is able to serve more than 850 Army Reservists and National Guardsmen, if needed. KBE Ventures, a joint venture of KBE Building Corporation and DeRita Construction Company, is the designbuilder and prime contractor for the center. Headquartered in Farmington, KBE Building Corporation is drawing on its numerous design-build successes over the last decade to manage this 19-month design and construction project. Field construction began in April 2010 with extensive excavation of the hilly site, including some cuts as deep as 40 feet. The expertise of joint venture partner DeRita Construction, a Middletown-based site contractor, has been instrumental in managing this timecritical portion of the work. Led by S E A Consultants, the

design team has translated the myriad needs of the Army Reserve and the CT National Guard into this striking new facility set on a steeply sloping site adjacent to Interstate9l. Under the management of the US Army Corps of Engineers- Louisville District, the design incorporates the following unique features: • US Green Building Council LEED Silver standards reduce energy use by 30% and water consumption by 50% - and the project has the potential to achieve LEED Gold. • Renewable energy design includes photovoltaic panels and solar hot-water panels to reduce the facility’s carbon footprint • Water conserving, low-impact design (LID) features including grass swales and disconnected paved areas to increase

Soils, Concrete and Steel Construction

We’re proud to be part of the KBEV/SEA Team for the Connecticut Armed Forces Reserve Center project

Developing creative and cost-effective solutions to complex structural engineering challenges for over 25 years • Structural Engineering • Peer Review • Building Information • Modeling (BIM) • Failure Investigations • Special Inspections • Expert Witness Services www.high-profile.com

The Design-Build Team for the Armed Forces Reserve Center

• KBE Ventures, a joint venture of KBE Building Corporation and DeRita Construction Corporation: design-builder, prime contractor, and site contractor: • S E A Consultants: design team leader, architect: interior designer, and civil engineer • DiBlasi Associates: structural engineer • Architectural Engineers Inc.: mechanical engineer • ART Engineering: electrical engineer • Brierly Associates: geotechnical engineer The on-site construction team, led by KBE Ventures, currently includes more than two dozen local, union, and non-union trade contractors. Additional trade contractors will join the team as work progresses.

Testing & Inspection

Allied Testing Laboratories Inc. Serving the Western Mass Construction Industry for over 40 years! Full service laboratory staffed by engineering and technical personnel qualified to perform testing & inspections to various state and commercial building codes, military specifications, or client requirements.

A full service laboratory staffed by engineering and Specialized Testingqualified and Inspection technical personnel to performof Soils,&Concrete, Steel testing inspectionsMasonry to various&state and Member: Building Trades Association, Mass Dept.specifications, of Public Safety commercial building codes, military American Concrete Inst. or client requirements. Accredited By: CCRL & Corp of Engineers 115 ST. George Rd. Springfield, MA 01104 (413) 736-1846 Specialized Testing and Inspection of www.alliedtestinglaboratories.com

Soils • Concrete • Masonry • Steel Member: Building Trades Association, Mass Dept. of Public Safety American Concrete Inst. Accredited by: CCRL & Corps of Engineers

115 ST. George Rd., Springfield, MA 01104 (413) 736-1846 www.alliedtestinglaboratories.com


August, 2010

25

High-Profile Feature: Armed Forces Reserve Center

“Teamwork is the ability to work together toward a common vision.” – Andrew Carnegie

Thank you to our clients - the US Army Corps of Engineers, the 99th Army Reserve and the Connecticut Army National Guard - the City of Middletown, Connecticut, and our design and construction partners for their visionary thinking and commitment to teamwork in making the Middletown Armed Forces Reserve Center a project of distinction! US Army Corps of Engineers 99th Army Reserve Connecticut Army National Guard City of Middletown , Connecticut S E A Consultants, Inc. DiBlasi Associates, P.C. Acranom Masonry Architectural Engineerings Art Engineering Corp. AECOM Technical Services, Inc. Allied Testing Laboratories, Inc. BG Mechanical Contractors, Inc. Builders Hardware Cherry Hill Glass Daniel’s Caulking, LLC HHS Mechanical Contractors, Inc. J. Devoe Trucking Mega Mechanical Systems Corp. Nano Construction Services, LLC New Haven Partitions Northeastern Clearing, Inc. O’Brien Associates, Inc. Patriot Steel / Manafort Project Controls, Inc. Semac Electric Co., Inc. Shepard Steel Co., Inc. Vermont Lumber and Stone Works Schindler Elevator Corp. Zinter Handling, Inc.

KBE Building Corporation www.kbebuilding.com 860.284.7110

DeRita Construction Company Inc. 860.347.8072

Building Excellence TOGETHER www.high-profile.com


weekly activiress to for month-

August, 2010

26

High-Profile: Facilities Development News

Framing Complete for New Apartments

RPF Classes

Pro Con Architect and GC Stoughton, MA – The framing is complete on the three buildings that comprise Alta at Indian Woods, a new Energy Star residential apartment community being built in Stoughton. Wood Partners, a national apartment real estate firm with local offices in Concord, is the developer, and Pro Con, Inc is the architect and general contractor for the $13.5 million design build project. “The framing is complete, the rough mechanicals are under way and we plan to begin dry walling by mid-July,” stated the project manager for Pro Con, Inc. “All the buildings will be weather tight by the midAugust and ready for final finishes.” Alta at Indian Woods is participating in the Massachusetts New Homes with Energy Star program. The Energy Star New Homes is a program developed and administered by the United States Department of Energy that focuses on a high efficiency building envelope and optimal HVAC distribution performance. The project design calls for an inch of rigid insulation on the exterior, slab edge and under-slab insulation, and high-performance cavity insulation; window U-values of .3; and ducts that surpass the standard for tightness. Conservation Services Group of Westborough is collaborating with Wood Partners as HERS rater on the project. The Energy Star standard, when implemented and tested by approved rating firms, is designed to reduce energy consumption to a

Framing is complete on the three buildings. level that is 15% lower than a comparable project built to the 1994 International Residential Code. The 154-apartment community will offer one- and two-bedroom units and onebedroom units with dens. The apartments, ranging from 710 to 1,041sf with various design configurations, will be located in three four-story garden-style buildings. The apartments will feature ample kitchens, full-size washers and dryers, walk-in closets, upgraded flooring, and high-speed Internet and cable-ready access. The community’s common areas will be professionally landscaped and will offer outdoor amenities, including seating and gas grill.

Join us in September’s Annual focus:

Educational Facilities Developments Deadline August 20, 2010

The community’s club house will feature a great room with a kitchen for entertaining and a fitness room with high end exercise equipment and machines. The community’s administrative and leasing offices will be located on-site. The sitework, which includes utility infrastructure, roadways, parking lots, drainage, and landscaping is on-going. Pro Con has scheduled a phased completion of the project; the first building will be ready for occupancy in November 2010, and the second and third buildings will be completed in January 2011.

Northwood, NH - RPF Associates, Inc., an EPA accredited training provider for the Renovation, Repair, and Painting Program (RRP) Rule is offering RRP classes at its corporate training centers and will provide the classes at customer sites throughout New England. Recently the EPA pushed back its deadline for firms to be accredited until October 1 and training of renovators from April 2010 to December 1. Contractors can register for classes and see an online video by visiting www.airpf.com. The EPA RRP Rule requires all contractors, maintenance staff, property managers and other firms that disturb lead paint in homes and childcare facilities built before 1978 to follow specific work practices to prevent lead contamination and to obtain necessary training and certification. The EPA has determined that renovation, repair, and painting activities that disturb lead-based paint in pre-1978 housing and child-occupied facilities create lead-based paint hazards. The training educates renovators and maintenance staff on the proper ways to handle work involving lead paint to avoid accidental poisonings and environmental damage.

High-Profile Monthly ‘s annual focus on Educational Facilities Developments informs institutional, private and public facilities planners, and managers with news on the people and companies that are designing and building educational facilities. Join us for the September 2010 issue as we report on current construction activities in New England. Send your news release or editorial query to editor@high-profile.com. Reserve your advertisement space today! Call 781-294-4530, or e-mail: ads@high-profile.com

September also includes popular monthly sections: • Green News • Healthcare Facility Developments • Renovations and Restorations • Multi-Residential Developments • Association Award Winners plus People, Calendar and more...

Would you like to receive weekly news on facility construction activities? Send your e-mail address to previews@high-profile. com for weekly FastFacts Friday and monthly e-previews.

Featured in our next issue, Payette recently announced that the firm’s design of the 182,000sf Pennsylvania State University (Penn State) Hershey Medical Center Cancer Institute was named the sole recipient of the inaugural Generative Space Health Improvement Award by the CARITAS Project.

www.high-profile.com


August, 2010

27

High-Profile: Green Facilities Development News

Carlson Orchards Solar Installation Lighthouse Electrical Teams with Kelleher Architects and kWind

The SMMA/CRB design team for the Shire Human Genetic Therapies center includes l-r: Brian Lawlor, executive vice president; David Ekstrom; Martine Dion; Murat Alkim; Eric Peterson; Richard Croswell.

HGT Gains LEED Silver Designed by SMMA/CRB Lexington, MA - The SMMA/CRB design team for the Shire Human Genetic Therapies (HGT) Warehouse and Distribution Center reached its project goal of LEED Silver certification. They adapted an existing warehouse and distribution facility to accommodate the more sophisticated GMP requirements for Shire HGT as a storage and distribution center to support its new drug manufacturing facility in Lexington. The project involved the interior renovation of an existing 92,000sf warehouse to create cold room and ambient spaces required for GMP storage. The primary spaces are approximately 15,000sf of cold storage and 45,000sf of ambient storage. The building includes a number of

secondary uses, including office support, packaging and labeling, quality control sampling, material handling, support spaces, and circulation space. From the outset, the design team’s goal was to design the building to meet Shire’s sustainable goals. Early design phase decisions included the reuse of the existing structure to the greatest possible extent in order to minimize construction demolition. Other green initiatives include a cool roof, support of alternative transportation, construction waste management, HVAC efficiency upgrade, water use reduction, enhanced commissioning, recycled and regional materials, and a green cleaning program.

Is your firm a leader in green or sustainable building?

Massachusetts’s largest solar installation at an agricultural site or farm. Harvard, MA -- Lighthouse Elec- The solar project is being funded in large trical Contracting, Inc., of Rockland, a part by grants from the Massachusetts member of NECA’s Boston Chapter, is Technology Collaborative (MTC)/Massaon schedule with the design/build 220kW chusetts Clean Energy Center (CEC). It is ground-mount photovoltaic (PV) system at among the first solar projects in the state Carlson Orchards in Harvard. The project to incorporate virtual netmetering and an is Massachusetts’s largest solar installation MTC/CEC grant. at an agricultural site or farm. The PV system is expected to generLighthouse teamed with Stephen ate approximately 70% to 80% of the anKelleher Architects of Fairhaven and nual energy usage of the orchard, largely kWind, Inc. of Mattapoisett. Project Man- for the operation of refrigeration units used ager Newell Thomas and President Herb to chill and preserve harvested apples. A Aikens supervised a field crew ranging special ribbon-cutting celebrating the Carlfrom eight to 10 IBEW electricians during son Orchard’s solar system’s interconnecthe three-month project. tion to the power grid will kick off the The system is comprised of 1,050 orchard’s annual Peach Festival, which Evergreen 210W solar panels, a DPW So- will be held in August. Carlson Orchards lar Corp. ground-mount mounting system is New England’s largest producer of apat 30 degrees pitch, and solar inverters and ple cider, producing more than 500,000 data acquisition by Solectria Renewables. gallons annually.

Air Rotation-De-Stratification Systems Less heat loss out the roof

Then you should appear in

High-Profile Green News

Here’s how:

Fabric Ducting

Share your knowledge and experience with our readers: We’re looking for regular monthly articles and expert advice pieces on Green Building and Sustainable Design issues in the North East.

Heat

TURN YOUR BUILDING UPSIDE DOWN Heat

Submit News Releases: Announcements of LEED Accreditation, Sustainability related Awards, or news of construction with green goals in the planning are welcome Advertise Monthly: Now at significantly discounted rates you will reach the people who are looking to build green. Submission of industry articles, news releases and/or advertisments can be e-mailed attn:

Anastasia Barnes anastasia@high-profile.com Why Keep a low Profile?

Call Anastasia to learn more at 781-294-4530.

CUT YOUR HEATING COSTS BRING THE HEAT TO THE FLOOR LEVEL

SA

VE

EN

ER

GY

at air d he iling floor e e t r c s e l wa the Coo your ed to vier t h a t a i l e u w H ix circ to m

All the heat must circulate to the fan unit on the floor Simply works with no annoying drafts CALL TODAY and be warmer @ the floor 800 622 8078 www.high-profile.com


August, 2010

28

High-Profile: Green Facilities Development News

Green Communities Receive Grants

Watermark Cambridge Achieves LEED Gold Cambridge, MA - Watermark Cambridge announced that it is the first residential rental apartment building in Massachusetts to achieve a LEED Gold rating. The project earned certification in the Existing Buildings: Operations and Maintenance category, one of very few multifamily properties in the country to achieve this distinction, and the first to achieve it under the most recent version of LEED 2009. Watermark Cambridge is a 23-story, 321-unit apartment building in the heart of

Residents of Watermark enjoy better air quality in their environmentally friendly apartments. Kendall Square, Cambridge, developed by Twining Properties and designed by CBT Architects. The high standard set by the LEED program ensures that the residents of the Watermark community enjoy superior energy savings and efficiency and better air quality in their environmentally friendly apartment homes.

Green features such as low-e glass and energy-efficient lighting were already integrated into CBT’s design. All materials now used at the Watermark, like flooring and paint, meet the latest LEED standards. Selective plumbing fixture upgrades were added, and a solar sensor was added to the drip irrigation system on Watermark’s outdoor Zen terrace garden to reduce water use. New guides to the programmable thermostats and all-in-one washer-dryers were created.

Boston - Governor Deval Patrick announced that 35 cities and towns that earned official Green Community status last month began reaping the benefits of that designation recently –receiving grants for municipal renewable energy and energy efficiency projects worth $8.1 million statewide. “These 35 cities and towns have already demonstrated outstanding leadership by qualifying to be Green Communities,” said Governor Deval Patrick. “With the grants they are receiving, these communities can take critical next steps as our partners on the road toward a clean energy future.” “With these grant awards, our administration is supporting a range of investments from state-of-the art energy efficiency buildings to local renewable energy installations, which will help communities create a stronger, more sustainable future for Massachusetts,” said Lieutenant Governor Timothy Murray. “These 35 cities and towns are the pacesetters in a growing moveContinued on page 30

Watermark Cambridge exterior view

Infrared Diagnostic LLC Certified Infrared Building Science Analyst

Industrial and Commercial Infrared Surveys Moisture – Electrical – Energy – Draft

• Infrared Building Diagnostic for Heat Loss, Draft, Moisture • Infrared Electrical System Inspection • Blower Door Leak Testing of Residential and Commercial Buildings • HVAC Duct Leak Testing • Ventilation Requirement Testing • Infrared Flat Roof Moisture Inspections

• Energy Star Rater • Certified Infrared Thermographer • RESNET HERS Rater • BPI Building Analyst

Commercial & Residential Infrared Diagnostic LLC Sudbury MA 978-440-9900 www.IREaudit.com • info@IREaudit.com

www.high-profile.com


August, 2010

29

High-Profile: Green Facilities Development News

Net Zero Energy Home Awarded

ARC Project Earns Silver

Killingworth, CT - The Connecticut Green Building Council presented awards to home and facility owners recognizing their exceptional devotion to energy savings and excellence in design. George Keithan, president and CEO of Consulting Engineering Services (CES), and his wife were presented with the award for the Most Intriguing Award winning Net Zero Energy Home Residential Project for their Net Zero Energy home in Killingworth. LLC and numerous contractors, the home About two years ago George and was completed in November. Mary Keithan decided to commit to fosThis home is a certified LEED Platitering a carbon free new life-style and de- num home, has a -7 HERS rating, was signed the first Net Zero Energy Home in featured in the CT Department of EnvironConnecticut. With the hard work of CES mental Protections Earth Day 40 Video, employees James Senatro, PE and Nick and is entered in Northeast Utilities Zero Fair who designed the MEP systems, J. W. Energy Challenge. Huber Architect LLC and Essex Squared

Shawmut GC

Green Roof at BLS Featured on TV Boston - The Green Roof at Boston Latin School (BLS), designed by Studio G Architects, garnered national attention with a recent NBC Today Show segment. The Today Show filmed Studio G Architects and students from BLS Youth Climate Action Network in a design charrette for The Green Roof at Boston Latin School, an initiative of BLS Youth Climate Action Network. The Green Roof Sustainable Roofscape Learning Center provides multiple areas to instigate student learning about the big ideas of sustainability and provide the venue and material for a newly devised STEM (Science, Technology, Engineering, Math) curriculum.

The Green Roof provides opportunities for students to engage in inquiry-based learning about storm runoff, heat effects, rain acidity, and CO2 exchange, and to monitor the energy generated by the wind turbines, photovoltaic and solar thermal collectors. The roof also includes a contemplative garden and a cafeteria farm and rooftop greenhouse. This layered design reflects an integrated approach to sustainable education: The Green Roof demonstrates sustainability by lowering carbon emissions through planted microclimates and generating energy to offset the school’s needs. To view the video: http://www.nbc. com/news-sports/msnbc-video/nations-oldest-school-sets-green-example/.

Boston - ARC/ Architectural Resources Cambridge, a nationally recognized architectural, planning, and interior design firm, announced that the ARC-designed Tufts University School of Dental Medicine’s vertical expansion has received LEED Silver certification from the US Green Building Council (USGBC). The building, located at One Kneeland Street, officially opened late last year after an ambitious $68 million, 22-month vertical exPhoto: Warren Patterson pansion development Tufts University School of Dental Medicine in one of Boston’s most densely populated neighbuilding this project has been designed to borhoods. The five-story, 95,000sf vertical achieve a 20% to 30% energy cost savings addition was added on top of the existing and a 30% to 45% reduction in water use. 10-story Tufts University School of Dental The original building, built in 1972, Medicine building in Boston’s Chinatown. was designed to be a 16-story structure; The vertical expansion project incor- however, the building plan was revised porates cost-effective sustainable strategies and only 10 floors were constructed at that such as a high-performance building enve- time. The top five floors recently added inlope with aggressive daylighting design to clude two new clinical patient floors, an exmaximize lighting efficiency and reduce panded simulation laboratory, teaching fasolar heat gain. Coupled with state-of-the- cilities, a continuing education conference art mechanical and plumbing systems that center, and administrative offices. are finely tuned and integrated into the

Commercial • Institutional • Fine Residential • Irrigation • Stonewalls, Walkways, Terraces

Current Landscaping Projects Include:

175 Wyman Street

The Natick Collection

40 Sylvan Road - John Moriarty and Associates 175 Wyman Street - Columbia Construction 225 Franklin St - Shawmut Design and Construction St. Elizabeths Hospital - Walsh Brothers Construction One Broadway Renovations - Walsh Brothers Construction One Boston Place Plaza Renovations - Trinity Builders MIT Media Lab Expansion - Bond Brothers McCormack Building Greenroof - Suffolk Construction Franklin Hill Housing - CWC Builders Museum of Fine Arts - John Moriarty and Associates Harvard Law School - Skanska Lahey Clinic North - Walsh Brothers Construction Mass Biologic Expansion - William A. Berry & Son, Inc. Eaton Vance Roof Garden - Shawmut Design + Construction Gillette Integration - Walsh Brothers Construction Arnold Arboretum Weld Hill - Lee Kennedy Construction Fan Pier Building F - Turner Construction New England Aquarium - Turner Construction 303 Third Street - Bovis Lend Lease Internap - Richard White and Sons Two Financial Center - Suffolk Construction

Large Caliper Tree Transplanting

Trinity College Longwalk Pavers

Telephone: 617-254-1700 • Fax: 617-254-0234 • 17 Electric Avenue, Boston, MA 02135 • www.valleycrest.com www.high-profile.com


August, 2010

30

High-Profile: Facilities Development News

Queen’s Univ Library Opens Designed by Shepley Bulfinch

Belfast, Northern Ireland - One of Northern Ireland’s newest landmark buildings — the McClay Library at Queen’s University, Belfast — was officially opened on July 6 by one of the University’s most famous alumni, Nobel prize-winning poet Seamus Heaney. The library was designed by the Boston architecture firm of Shepley Bulfinch. Speaking at the event, Dr. Heaney lauded the new library, saying, “The effect of light in McClay Library at Queen’s University the building — it’s like a lightship for scholarship…” He went The upper floors house Special Colon to comment on the library’s transforma- lections, subject-related help desks, and a tional impact on the student experience at range of printed works. A central feature, Queen’s. located in the tower above the entrance, is Shepley Bulfinch designed the li- the C.S. Lewis Room, which honors the acbrary in association with Robinson Pat- claimed Belfast native. terson Partnership of Northern Ireland and The Library is a model of sustainBuro Happold Engineers of Scotland. able design, with natural ventilation and Illuminated by a multi-story open operable windows; a chilled beam system; atrium, the 196,000sf building accommo- and heat recovery systems. The thermal dates 2,000 reader places and 1.2 million mass of the building is utilized as a heat volumes. Ground floor facilities include IT sink, while a rainwater harvesting system training rooms, a language center, library, conserves water with utilizing recycled and computer support areas and a cafe. rainwater.

Erland Completes Avid Office Reno Avid Lobby at 75 Network Drive Maugel Architects

Burlington, MA - Erland Construction, Inc. recently completed a multiphased, fast track, turn-key renovation project for Nordblom Company and Avid, moving Avid from its former worldwide headquarters in Tewksbury to Burlington. Avid leased three buildings from Nordblom Company — two in the Network Drive campus and one in Northwest Park, totaling 203,000sf. After an intense construction period, Erland completed the project in less than six months. Erland committed multiple construction crews to simultaneously manage the various components of the project. Avid has taken over the entire building at 75 Net-

Green Communities Receive Grants Continued from page 28 ment to make municipal operations cleaner and greener,” said Secretary of Energy and Environmental Affairs Ian Bowles, whose office includes DOER. “These grants will enable communities from Cape Cod to the Berkshires to cut waste, save energy dollars, create local jobs, and increase their energy independence.” The signature program of the landmark Green Communities Act of 2008, the Department of Energy Resource’s Green Communities Grant Program, uses funding from auctions of carbon emissions permits under the Regional Greenhouse Gas Initiative to reward communities that earn Green Communities designation by meeting five clean energy benchmarks: • Adopting a local zoning bylaw

or ordinance that allows “as-of-rightsiting” of renewable energy projects; • Adopting an expedited permitting process related to the as-of-right facilities; • Establishing a municipal energy use baseline and establishing a program designed to reduce use by 20% within five years; • Purchasing only fuel-efficient vehicles for municipal use, whenever such vehicles are commercially available and practicable; and • Requiring all new residential construction over 3,000sf and all new commercial and industrial real estate construction to reduce lifecycle energy costs (i.e., adoption of an energy-saving building “stretch code”).

Essex Completing Auto Dealership John R. Perry Architect Westwood, MA - Essex Builders Corp. is finishing up exterior façade renovations for Central Chrysler Jeep and Dodge located on the Auto-Mile in Norwood. Design documents prepared by John R. Perry Architect, Ltd. of Norwood reflect Chrysler’s new brand theme for its North American dealerships.

www.high-profile.com

Renovated exterior façade of auto dealership

Avid Lobby at 75 Network Drive

multi Avid, Burlin Netw After mont

Erlan vario Netw their with as th 143-f 65 an bridg

The fi North cons necti BridgeConnecting connecting 75 Network Bridge 65 65 andand 75 Network Drive Dr.

Erlan Maug and c

work Drive, as well as two floors of 65 Network Drive, which will serve as its corpoAvid rate headquarters. These renovated spaces tened feature a high-tech lobby with holographic displays; conference, demonstration, and tigiou training areas; as well as its executive ofconc fices and technical lab space. Erland also of Av has constructed a 143-foot-long enclosed Pro T pedestrian bridge to provide all-weather access between 65 and 75 Network Drive. Erlan The bridge mimics the design of current sor, C connecting bridges in the park. progr The final portion of this project inhas t cluded renovations to 10 North Avenue in majo Northwest Park to house Avid’s stockroom For m and distribution functions, including construction of a new loading dock addition. Erland also constructed a new connecting road between North Avenue and the Network Drive ring road. Erland teamed with Gensler, RDK Engineers, Spagnolo Gisness & Associates, Maugel Architects, Vanasse Hangen Building Solutions Through Commitment Brustlin, and Fox Relocation on this excitErland Construction, ing and challenging endeavor. Inc. | 83 Second Ave

New Armed Forces Reserve Center Continued from page 22 • Low-impact, state-ofthe-art stormwater management system that exceeds federal requirements for water quality and quantity control • Adherence to DoD’s stringent security criteria • All design documents have been prepared with 3D Building Information Modeling (BIM) software, including clash detection to enhance coordinaPhoto Credit: Bluebird Aerial Photography Cheshire CT tion and accuracy Sitework has been a core component of the new • Utilization of USACE’s Armed Forces Reserve Center in Middletown, “Dr Checks” quality assurance Connecticut. Structural steel is under way on the system throughout the fast-track 164,000sf Training Center (foreground), with foundadesign process and ProjNet de- tion work starting on two additional structures. KBE sign and construction informa- Ventures, a joint venture of KBE Building Corp.and tion software. DeRita Construction, is the design-builder, prime conThe design-build team tractor, and site contractor for the project. faced several challenges during ule, the structural design includes a numthe design phase, not the least of which was the fast-track schedule. For ex- ber of special features that respond to Antiample, DiBlasi Associates, structural engi- Terrorism / Force-Protection measures and neers, began structural design work in De- Progressive Collapse resistance. Construction is forging ahead at a cember 2009 and completed the documents rapid pace, with completion planned for the in time for the bid issuance in early 2010. In second quarter of 2011. addition to the extremely ambitious sched-


August, 2010

31

High-Profile: Facilities Development News

congratulates Wire Belt Company of America on its new 99-kilowatt solar photovoltaic array. Contact Nexamp, New England’s leading turnkey clean energy solutions provider, for a clean energy assessment of your new or existing facility. Let us help you reduce your energy costs: Nexamp makes clean energy simple and profitable for you. Copyright 2010 Damianos Photography.com

A conference room located in the 494,000sf IBM facility.

RDK Part of Data Ctr. Opening main data center was designed on a 25,000sf

Littleton, MA - RDK Engineers recently participated in the official opening of IBM’s new Littleton data center. RDK played an integral role in the building systems design of the 494,000sf building, IBM’s largest software development facility in North America. RDK incorporated a number of energy efficient features into the design of the high-tech facility, which includes nearly 60,000sf of data center and lab space. The

floor that allows for faster delivery of air at a lower temperature, and additional energy efficient design features include HVAC systems that respond to solar heat gains and automated lighting controls that dim lights based on the levels of natural lighting. RDK also designed a back-up power system for all critical processing equipment so that IBM can keep information safe and equipment running if power is lost.

www.nexamp.com 978-688-2700 Wire Belt’s 99-kW solar PV array is offsetting approximately 20% of the company’s total electricity use.

Design Exchange to Open Continued from page 18 Graphic designers, engineers, marketing strategists, these are all design disciplines that could really thrive within a creative neighborhood. Despite the complication in financing and renovating the building, the partners steered away from purchasing a plot of land and constructing a new building. “The firm is really committed to the redevelopment of urban land and we saw this as the perfect opportunity to practice what we preach –sustainability and environmental responsibility,” Ladds said.

energy advisory services · geothermal · solar · wind high-efficiency lighting · micro-combined heat & power

Design Exchange exterior Proximity to the highway, access to public transit, and a walkable community add to the appeal of the location.

Concrete Building Solutions

Quad-Deck Insulated Concrete Form System for Floors, Roofs, and Tilt-Up

The park serves as an entrance to the Leonard Florence Center.

Erland Donates Park Chelsea, MA - Erland Construction, Inc. recently donated the time, labor, and materials to build a small park for the Chelsea Jewish Foundation. The park, with its granite sign and

rock garden plantings, serves as a ceremonial entrance to the Admiral’s Hill complex in Chelsea that houses the new Erland-built Leonard Florence Center for Living – a 91,000sf, 100-unit skilled nursing facility.

R-ETRO High Performance Insulation System

QUAD-LOCK - The most versatile Insulating Concrete Forms for walls

Quad-Lock Building Systems Ltd. Marty Baron, Regional Sales Manager / 888-596-2399 / 413-335-9924 www.quadlock.com / marty.baron@quadlock.com

www.high-profile.com


August, 2010

32

High-Profile: People

Lee Kennedy Hires Fiddes Quincy, MA - Lee Kennedy Co. has hired Allan Fiddes as chief estimator. He is a 20-year construction industry veteran with preconstruction and estimating experience across every major building sector. He will oversee estimating functions for the academic, healthcare/life sciences and commercial sectors at Lee Kennedy Co. Fiddes, a LEED accredited professional, brings a strong background of similar work for clients including Harvard University, MIT, New England Medical

Center, and Baystate Medical to his work at the firm. Prior to joining Lee Kennedy Co., he spent 10 years with construction manager Barr & Barr. Fiddes

Additions at Lavallee Brensinger Manchester, NH - Lavallee Brensinger Architects of Manchester announced the recent addition of five design professionals to its 50-person practice. William Gatchell, AIA, joins the firm with a wide range of project experience for education, civic, and corporate clients. His experience encompasses all phases of architectural services from master planning and programming through design and construction closeout. Past work includes building projects at Tilton Academy, North Yarmouth Academy, and Foxcroft Academy.. Jeffrey Brussel, AIA, LEED AP, brings extensive experience in higher education, science/technology, and K-12 facilities. Recent notable work includes the Harvard Allston Science Complex,

the Comer Geochemistry Building at Columbia University, and the University of Rhode Island Center for Biotechnology and Life Sciences. Luis Riobueno, LEED AP, joins the firm’s thriving healthcare practice. With significant healthcare planning and design experience, recent work includes projects at Dartmouth-Hitchcock Medical Center, Boston Children’s Hospital, Beth Israel Deaconness Medical Center, Brigham & Women’s Hospital, and Lahey Clinic. In addition, Lavallee Brensinger welcomes two recent graduates, Sean Landry and Joe Britton III. These talented and energetic young professionals will apply their skills in Building Information Modeling and 3D design to support project teams.

Carr New Dean at Wentworth Boston - Wentworth Instiservice organizations, technoltute of Technology named Larry ogy development companies, Carr as the new dean of The Ariand leading professional seroch Center @ Wentworth, the Invice organizations stitute’s division of professional Carr’s professional and continuing education. background includes the posiCarr brings extensive leadtion of CEO at Linkage, Inc., ership experience, holds a passion a provider of organizational/ for lifelong learning, and underleadership development and stands the importance of strategic corporate education programs. Larry Carr partnerships between institutions During his tenure, Linkage was of higher education and private named to the INC 500 list of industry. He has more than 30 years of ex- fastest growing privately held companies perience in working with technology-based in America for two successive years.

Fully Insured

Free Estimates

Care and maintenance for your lawn, shrubs and grounds.

We are on the Cape! Ph: 508-775-3614 www.high-profile.com

Cel 781-277-1913

Scapicchio Joins OLD&D Manchester-by-the-Sea, MA - Olson Lewis Dioli & Doktor Architects (OLD&D) announced that Steven Scapicchio, AIA, LEEDAP, has joined the firm’s architectural staff. Principal Architect Chris Doktor said, “He brings to OLD&D over 20 years of experience and a great wealth of skill, talent, and architectural expertise in the residential, educational, and institutional market sectors.” Prior to joining the OLD&D Scapicchio was senior design architect at Alexander Coogan Architect, Inc. His architectural tenure includes working at other firms such as Architectural

Resources Cambridge, Inc. in Cambridge and IN/EX Design Group in Melrose. Scapicchio is a LEED Accredited Professional and joins Scapicchio OLD&D’s sustainable design team providing creative and conscientious sustainable design solutions. Photo courtesy of AM Anderson

SMMA Appoints Fitzgerald and Pitkin Cambridge, MA, – Symmes Maini & McKee Associates/SMMA recently appointed Principals Alex C. Pitkin, AIA and Marie E. Fitzgerald, IIDA to the board of directors. Pitkin joined SMMA in 1992. He is a senior vice president and director of institutional Practice. His affiliations include the Boston Society of Architects, the American Institute of Architects, the Council of Educational Facility Planners International, and the Society for College and University Planning. Fitzgerald, who joined the Cambridge-based firm in 1998, is a senior vice president and director of SMMA’s Corpo-

Pitkin

Fitzgerald

rate + Technology Practice. She is a member of the International Interior Design Association, the International Facilities Management Association, and CoreNet Global.

Flynn Joins Lincoln Property

Boston - The Boston office of Lincoln Property Company announced that Jesse Flynn has joined the firm as a senior associate. At Lincoln Property Company Flynn will focus on the Cambridge office and lab markets. Prior to joining Lincoln Property Company, he worked as a broker with Newmark Knight Frank’s Cambridge real estate team and Townsend Commercial Real Estate in San Francisco, California.

“Jesse is an excellent addition to our growing brokerage services group,” said Michael S. Edward, senior vice president and head of brokerage for the Boston office of Lincoln Property Company. “He has been actively involved in tenant and landlord representation assignments in the Cambridge market.” Flynn is currently an active member of NAIOP, the Greater Boston Real Estate Board (GBREB), and the Massachusetts Biotech Council.

Goody Clancy Names Howe Boston - Goody Clancy, a Bostonbased interdisciplinary design and planning firm, announced that Lisa Howe, currently the director of preservation, has been named a principal in the firm. Howe has a diversity of experience, which includes more than 20 years directing the adaptive reuse and preservation of signature buildings in a broad range of market sectors, including education, civic and cultural projects for clients such as Harvard University and the US General Services Administration (GSA). Her career began as a bricklayer and demonstrates a continuous commitment to design excellence, technical knowledge, research, and innovation.

Her current work includes two National Historic Landmarks. The first is the renovation of over 50 historic buildings at St. Elizabeth’s West Campus in Washington, D. C., which is part of a Howe GSA project creating the new headquarters for the Dept. of Homeland Security. The second is the façade restoration of the Ayer Mansion in Boston.


August, 2010

33

High-Profile: People

Three Receive Certification

Environments at Work Hires Two

Boston - EnviWork with a backronments at Work, an ground as a senior office furniture dealer, financial analyst, announced it has hired most recently for two new staff members. the East Coast Division of Sun MiServing as the new crosystems. She customer satisfaction and also previously quality control manager, Paula Warner will proserved as a finanvide support and quality cial analyst for Warner Marsh control for the compaCommonwealth ny’s existing clients. Energy Systems. Abby Marsh will serve as sales coMarsh most recently served as a sales ordinator, managing new customer orders associate for Webster & Company in Bosfrom proposal through project completion. ton, and previously was a sales associate Farmington, CT - HRP toring, and remedial actions at They will be located in the company’s Bos- and office manager for Johnson & AssociAssociates, Inc. announced that contaminated sites. ton office. ates in Concord. Robin C. Fox, LEP and Jason A. Beach is a project manWarner comes to Environments at Photos by Environments at Work. Beach, CPG, LEP have become ager in HRP’s Stratford office. Licensed Environmental ProfesHis areas of expertise include sionals (LEPs). due diligence and subsurface Boston - GEI Consultants, Inc., a Fox is a senior project geolinvestigations as well as remeogist in HRP’s Farmington office. dial action design and supervi- national geotechnical, environmental, waShe specializes in environmental sion. He is also a certified pro- ter resources, and ecological science and engineering firm headquartered in Mass., site assessments, subsurface infessional geologist. Beach announced that its board of directors has vestigations, groundwater monielected six new vice presidents. Roger Hathaway, P.E., vice president and Manufactured Gas Plant (MGP) pracQuincy, MA - J. Calnan subcontractor buy-out, contract tice leader in the Hartford, Conn. office, & Associates, Inc. announced negotiation, requisition review has spent more than 20 years in the field of that Chris Modica has joined and approval, financial status Hathaway King environmental remediation, with a primary the Quincy-based company as a reports, budget reports, quality Giovanni Bofocus on compliance management proproject manager. control, and client satisfaction. Modica will be responModica has over 10 years grams. He specializes in the management nita, Ph.D., P.E., sible for the overall manof project management experi- of MGP site remediation programs, urban P.G., vice president, agement and coordination of ence in the construction industry. property remediation, urban waterways, geo-structural pracprojects from preliminary planPrior to joining J. Calnan & Asso- regulatory negotiations, and stakeholder tice leader and office manager in GEI’s ning throughout construction ciates, Inc., he held project man- communications. Modica and final occupancy. His reagement positions at Cutler AssoPatrick P. King, P.E., LSP, vice presi- Washington, D.C. sponsibilities include superviciates, Inc.; Shawmut Design and dent and environmental division manager office, has more sion of staff and subcontractors, trade co- Construction and Bond Brothers. in the Boston office, has more than 17 than 17 years of exordination, logistics and safety planning, Leuschner years of experience developing subsurface perience with cominvestigations, evaluating remediation al- plex underground ternatives, implementing response actions, structures, retaining systems, geological Boston - AKF gineering consulting and managing contaminated media during and geophysical investigations, and deep construction projects and brownfield rede- foundations. Group, headquarfield. Timothy B. (Tim) Anenson, vice tered in New York Dyer, AKF velopment. president and Pacific region manager loAlfred P. Leuschner, vice president City, has named Boston, leads the cated in the Sacramento office, has more and MGP practice leader in the Boston Brian M. Mulkerrin, firm’s National Marthan 25 years of engineering and business office is a recognized leader in the MGP/ PE and Dennis M. keting Initiative in experience. utility market with more than 30 years of Dyer, PE, LEED-AP the healthcare and William J. Bennett, P.E., vice presias full partners of science and technol- experience. His specialties include remedident and planning division manager in al technology development, remedy selecthe firm. ogy sectors. He has the Sacramento office, has more than 35 tion, design and implementation, liability Mulkerrin, more than 30 years Dyer Mulkerrin years of professional experience in water cost estimating and Brownfield redevelopwho oversees the of experience in the resources and geotechnical engineering. ment of MGP sites. day-to-day operation design of heating, of the Boston office, has spent the major- ventilating, air conditioning (HVAC) sysity of his career in the building engineering tems, energy conservation analysis, and and construction markets, with more than master plan/feasibility studies. 17 years specifically in the electrical encomplete this form and fax it to Shirley, MA - In June three Senate Construction employees received certification. Bill Hamel, senior project manager of Senate Construction, became LEED Green Associate certified which is the first step in becoming LEED AP. Jon Karp, director of Senate Construction’s small projects division, and Joel Delorey, project superintendent

with Senate, became EPA certified renovators. The RRP Rule (Renovation, Repair and Paint Rule) requires contractors to obtain certification for both their business and for employees who will be supervising work and use lead-safe work practices when performing work on pre1978 residential housing or space rented by child-care facilities.

HRP New LEPs

GEI New VPs

JC&A Adds Modica

AKF Names New Partners

Subscribe Now!

MacDougall Joins United Solutions Marlborough, MA - United Solutions Inc. has hired seasoned industry leader Walter MacDougall to help New England’s construction businesses use software to run at peak efficiency. MacDougall will focus his efforts on two industry-leading products – Sage Timberline Estimating Software and Viewpoint Construction Software. MacDougall brings a 10-year record of helping construction firms identify and implement software solutions that provide sustainable competitive advantage. Among

his career highlights, MacDougall helped build the Quest Solutions estimating program into a leader in the New England market. Earlier, he helped Management and Associated Services, Inc., become the nation’s leading Master Builder partner for several years running. Now MacDougall joins New England’s leading provider of Sage Timberline Estimating Software and the region’s only business partner of Viewpoint Construction Software.

Subscriptions, 781-293-5821 Name_______________________________________ Company ____________________________________ Address_____________________________________ ___________________________________________ City,State & zip_______________________________

$58 $58 individual subscription for one year $116 corporate subscription (three individuals) for one year $125 To order your subscription using Visa, Master Card, Discover or American Express call 781-294-4530, 8 am - 5 pm.

www.high-profile.com


August, 2010

34

High-Profile: Calendar CFMA NAIOP Mass. 9th annual bus tour. - October 6. The tour will offer a fast-paced look at the latest sales, lease, and development activity in Boston’s Seaport area, as well as Cambridge, the North Inner Suburbs, and Waltham. Designed to provide comprehensive information on a variety of markets and product types, including office, retail, residential and institutional, the tour will include the latest on what’s being built, who’s going green, where infrastructure improvements are, and other vital news. F o r more info http://www. naiopma.org/

Construction Financial Management Association 2010 Mid-Atlantic Regional Construction Financial Conference Sunday, Sept. 19 – Monday, Sept. 20 Sheraton Inner Harbor Baltimore, MD Contact: Rick Huber (215-283-6473; richard.huber@libertymutual.com)

Save the date! NESEA 2011 Northeast Sustainable Energy Association (NESEA) BuildingEnergy Conference and Trade Show March 8 - 10, 2011, Seaport World Trade Center, Boston For more information: www.nesea. org/buildingenergy

SFNE - AISC Breakfast The American Institute of Steel Construction (AISC), along with Steel Fabricators of New England (SFNE), will be hosting a special SteelDay breakfast presentation and networking event in downtown Boston. The event is free of charge. The morning will begin with a full breakfast followed by the presentation, Building an Award Winning Structure. There will be plenty of time for ques-

tions, discussions and networkingSteel industry professionals will also be on hand to answer any specific topics or questions. September 24, 7:30 a.m. Radisson Hotel 200 Stuart Street, Boston w w w. S t e e l D a y. org/SteelDayRegistration Or email: cflaherty@ssfne.org

Mass. Building Congress On Wednesday, October 13, 2010, the Fourth Annual Hall of Fame Awards will be presented. The MBC Hall of Fame provides a forum for the building industry to recognize, celebrate, and publicize the work of exemplary companies whose longstanding contributions have lasting impact on the industry, the community, and the clients they serve. http://buildingcongress.org/ hall-of-fame-nomination-form.html

DBIA

30th Annual Jewett Golf Classic

2010 Design-Build Conference October 18-20, Las Vegas Support today’s youth through the At the 2010 General Sessions of the Design-Build Conference & Expo, DBIA is scouting program. save the date! Daniel webster Council, BSA creating a platform for diverse perspectives September 10, 2010 and ideas. We are opening the conference Breakfast hill Golf Club, Greenby starting a conversation among all project team members and we will close by seek- land, N.H. Special Contests & Awards! ing the views, opinions, and expectations of For more information: www. project owners. nhscouting.org/golf dbiaconferences@dbia.org

15th Annual Golf Outing The Connecticut Building Congress (CBC) and Habitat for Humanity of Greater New Haven will be hosting the 15th Annual Robert J. LeFloch Memorial Golf Outing at Race Brook Country Club in Orange, Conn., on Tuesday, September 21, 2010. Once again, this year’s event will be an 18-hole shotgun and will include various contests, a barbecue lunch, door prizes, beer and wine, and a buffet dinner followed by awards and raffle prizes. The outing benefits Habitat for Hu-

manity of Greater New Haven and the Connecticut Building Congress Scholarship Fund. Registration information for this event can be downloaded from the Habitat for Humanity Web site at: http://habitatgnh.org/2010/06/27/15th-annual-robertj-lefloch-memorial-golf-outing Any questions can be referred to Jennifer Rook at Habitat for Humanity via phone at (203) 785-0794 or email at jrook@habitatgnh.org.

SPECIALIZING IN: Exterior and Interior Landscape, Planning, Development, Transitional and Long-Term Management Throughout New England

FOCUSING ON: • Planning, Budgeting and Pre-construction cooperation • Strategic and Creative value engineering

Intercontinental Hotel, Boston, MA

• Vigilant Budget Management • Critical Paths and Turn-over dates • Project close-out details • Ongoing transitional client support. Avalon Rooftop Terrace

100 Revolutionary Drive East Taunton, MA 02718

www.high-profile.com

Jon Ciffolillo, VP Business Development ph. (508) 977-9100 fax (508) 884-2431 http://www.greenscapemass.com

Private Estate, Wellesley, MA

P.O. Box 260 Worcester, MA 01613


August, 2010

35

SUSTAINABLE the-bac.edu/green DESIGN ONLINE COURSES & CERTIFICATION Study online at your convenience Interact with expert faculty in small, graduate-level classes

FALL COURSES INCLUDE Getting the Green Building You Want: Construction Management Sustainable Design of Healthcare Facilities Materials, Resources and Indoor Environmental Quality

with our partner

320 Newbury St. Boston, MA 02115 USA ce@the-bac.edu +1(617)585-0101

www.high-profile.com


August, 2010

36

CALLAHAN PRECONSTRUCTION CONSTRUCTION MANAGEMENT GENERAL CONTRACTING

EXTENSIVE EXPERIENCE IN

COMMERCIAL OFFICE RESIDENTIAL EDUCATIONAL RETAIL INDUSTRIAL & SPECIALTY CONSTRUCTION PROJECTS CALLAHAN, INC. 80 FIRST STREET BRIDGEWATER, MA 02324 P: 508-279-0012 F: 508-279-0032 WWW.CALLAHAN-INC.COM

Proud to be a member of the Avita Memory Care Team OWNER: NORTHBRDGE COMPANIES ARCHITECT: THE ARCHITECTURAL TEAM CONSTRUCTION MANAGER: CALLAHAN, INC.

www.high-profile.com


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.