Portfolio

Page 1

ASHLEY D. KROB

559.301.6835

MASTER of Architecture BFA Historic Preservation Minor Art History DNR Naturalist

krob.ashley@gmail.com www.issuu.com/AshleyKrob


RESUME 1

Drawing, Painting and other life necessities Historic Preservation

ARCHITECTURAL DESIGN

3

Economical Assessment

5

Adaptive Rehabilitation

9

Electronic Design and other mad skills

11

Vietnamese Restaurant, Charleston South Carolina

13

Electronic Sports Car Museum, Savannah Georgia

15

American Comedy Hall of Fame, Los Angeles California

17

A City by the Park, South Florida.

URBAN/ARCHITECTURE

21

A New Urban Development

College Dormitory

Hunters Point South, NYC New York

www.issuu.com/AshleyKrob krob.ashley@gmail.com 559.301.6835


ASHLEY D. KROB Objective

Education Degrees Obtained

MASTER of Architecture BFA Historic Preservation Minor Art History DNR Naturalist

To obtain a position within an architectural setting that will utilize and strengthen my passion for design. Working well with others, my hope is to maximize the creative process at the same time implementing softwares that will streamline the process. Savannah College of Art and Design Master of Architecture 2012

BFA Historic Preservation 2007 Minor: Architecture, Art History 2007

Skills Acquired

Painting: Oil, Acrylic, Watercolor Drawing: Graphite, Ink, Charcoal, Pastel Photoshop InDesign CAD REVIT Rhino Grasshopper Phoenix GIS

Work History Contact

Green Building Studio Power Point Ecotect Showcase 3-d Model Making Parametrics

DNR. Skidaway Island State Park. NATURALIST. Since 2009. DNR Manager Holly Holdsworth. 912.598.2300


K R O B 0 1

Eve series # 2 Acrylic 11” x 17

Individual Lamb? Acrylic 11” x 17

Another Still Acrylic 36” x 18”


My Hands Charcoal & Pastel 24” x 34”

Mixed Media

The diversity of my education allows me draw inspiration from a variety of disciplines, from the fine arts to historic preservation; I have been able to use the principles form each to further my design process. The fine arts taught the principles of a balanced composition, how to use color appropriately, and the drawing techniques that allow designs to be rendered using a variety of mediums.

London Colored Pencil 10” x 10”

F I N E A R T S

Highlander Charcoal 24” x 34”


HISTORIC PRESERVATION

Economical Assessment

Built 1900, Bands Corner Store is a two story building, the first floor commer-

Acquisition and Rehabilitation Cost Bland’s Corner Store

cial while the second floor contains a two bedroom living space. During the 18th

1402 Barnard Street Savannah, GA

to 19th century, the corner store became an extremely popular design throughout downtown areas across the United States. Today, however, buildings such as Bland’s have fallen into disarray. With gas stations taking over the convenience store titles, these small shops that are part of the fabric of urban life, are at risk of becoming obsolete and taking their history with them. This particular corner store is located in the historic district of Savannah Georgia. It stands as a ruin of the Victorian age in a city that prides itself upon Historic Preservation. When presented with the opportunity to provide an economical assessment of a potential investment for a client who wished to do an adaptive rehabilitation of a historic building that was eligible for receiving historic tax credits, I selected Bland’s as my building of choice.


K R O B 0 4

FINANCING

PROJECT COST Land Cost 28,000 Building Cost 25,500 Acquisition Cost 53,500

Loan to Value Ratio Maximum Loan Amount Maximum Investment Needed

70% 332,262 142,398

Total Square Feet 2080 Per Square Foot Cost 200 Rehabilitation Cost 41,600

Actual Loan Amount Loan Term (# of Years)

332,363 30

Soft Cost 10% 4,160 Rent Up Cost 1,000 Total Project Cost 421,160 OPERATING COST Total Square Feet Net to Gross Ratio Rentable Square Feet Rental Rate Per Square Foot Vacancy Rate Total Rental Income Vacancy Deduction Total Rent/Operating Income

2,080 90% 1,872 27 50,544 10% 5,5054 45,490

Annual Mortgage Payment

26,52

Before Tax Cash Flow

7,591

TAX EFFECT Taxable Income/Net Rent Tax Rate Tax Computation Less: Tax Credit Tax Due

-29,575 34% -10,055 4,516 0

Annual Cash Flow Less: Tax Due

7,591 0

Amount for Investors

7,591

Operating Expense Ratio 25% Anticipated Operating Expenses 11,372 Net Rent/Operating Income 34,118

Economical Assessment Professional Interpretation

This building would make a successful adaptive rehabilitation investment.

Although the profits

are minimal the first year, the finances are in the green, meaning that the profitable income has paid for the rehabilitation and the building will continue to profit in the years to come.


K R O B 0 5

Adaptive Rehabilitation

208 East 34th Street was constructed sometime between 1900 and 1917 as a

208 East 34th Street

residence for a Mr. and Mrs. John Morris. The site is located in the Cumming

Savannah, Georgia

Ward and occupies the East 45 feet of Lot 35 and the West 45 feet of Lot 36. It served as a residence to the Morris family until 1926. The site changed hands several times until 1972, when it became a law office for Fletcher Farrington and Partners. In 1999, the site was purchased by a Mr. Richard Wofford, who still occupies the bottom floor of the main house. The top floor and carriage house were rented out as apartments and remain so today.


K R O B 0 6

ADAREQUIREMENTS 4.1.6 4.2.1 4.3.2

4.3.3

Doors with existing thresholds of 3/4 in. high or less, and have (or are modified to have) a beveled edge of each side, may remain. The minimum clear width for single wheelchair passage shall be 32 in. at a point and 36 in. continuously. At least one accessible route within the boundary of the site shall be provided from public transportation stops, accessible parking, and accessible passenger loading zones, and public streets or sidewalks to the accessible building entrance they serve. The accessible route shall, to the maximum extent feasible, coincide with the route for the general public. The minimum clear width of an accessible route shall be 36 in. except at doors (see 4.13.5 and 4.13.6). An accessible route with a running slope greater than 1:20 is a ramp and shall comply with 4.8. Nowhere shall the cross slope of an accessible route exceed 1:50. Changes in level along an accessible route shall comply with If an accessible route has changes in level greater than ½ in.,

4.3.7

4.3.8

not include stairs, steps, or escalators. Changes in level up to 1/4 in. may be vertical and without edge treatment. Changes in level between 1/4 in. and 1/2 in. shall be beveled with a slope no greater than 1:2. Changes in lever greater than 1/2 in. shall be accomplished by means of a ramp that complies with 4.7 or 4.8. Any part of an accessible route with a slope greater than 1:20 shall be considered a ramp and shall comply with 4.8. The least possible slope shall be used for any ramp. The maximum slope of a ramp in new construction shall be 1:12. The maximum rise for any run shall be 30 in. Curb ramps and ramps to be constructed on existing sites or in existing buildings or facilities may have slopes and rises as allowed in 4.1.6(3)(a) if space limitations prohibit the use of a 1:12 slope or less. The minimum clear width of a ramp shall be 36 in. Ramps shall have level landings at bottom and top of each ramp and each ramp run. Landings shall have the following features: The landing shall be at least as wide as the ramp run leading to it. The landing length shall be a minimum of 60 in. If ramps change direction at landings, the minimum

4.5.2

4.8.1 4.8.4 4.8.2

4.8.3

4.8.5

landing size shall be 60 in. by 60 in. If a doorway is located at a landing, then the area in front of the doorway shall comply with 4.13.6 If a ramp run has a rise greater than 6 in. or a horizontal projection greater than 72 in., then it shall have handrails on both sides. Handrails are not required on curb ramps or adjacent to seating in assembly areas. Handrails shall comply with 4.26 and shall have the following features: Handrails shall be provided along both sides of ramp

then a curb ramp, elevator, or platform lift (as permitted in 4.1.3 and 4.1.6) shall be provided that complies with 4.7, 4.8, 4.10, or 4.11, respectively. An accessible route does

4.11.1 4.11.3 4.13.5

4.23.1 4.23.3

segments. The inside handrail on switchback or dogleg ramps shall always be continuous. If handrails are not continuous, they shall extend at least 12 in. beyond the top and bottom of the ramp segment and shall be parallel with the floor or ground surface. The clear space between the handrail and the wall shall be 1-1 ½ in. Gripping surfaces shall be continuous. Top of handrail gripping surfaces shall be mounted between 34 in. and 38 in. above ramp surfaces. Ends of handrails shall either be rounded or returned smoothly to floor, wall, or post. Handrails shall not rotate within their fittings.

Platform lifts (wheelchair lifts) permitted by 4.1 shall comply with the requirements of 4.11. If platform lifts are used then they shall facilitate unassisted entry, operation, and exit from the lift in compliance with 4.11.2. Doorways shall have a minimum clear opening of 32 in. with the door open 90 degrees, measured between the face of the door and the opposite stop. Openings more than 24 in. in depth shall comply with 4.2.1 and 4.3.3. Exception: Doors not requiring full user passage, such as shallow closets, may have the clear opening reduced to 20 in. minimum. Bathrooms, bathing facilities, or shower rooms required to be accessible by 4.1 shall comply with 4.23 and shall be on an accessible route. The accessible fixtures and controls required in 4.23.4, 4.23.5, 4.23.6, 4.23.7, 4.23.8, and 4.23.9 shall be on an accessible route. An unobstructed turning space complying with 4.2.3 shall be provided within an accessible bathroom. The clear floor spaces at fixtures and controls, the accessible route, and the turning space may overlap.


K R O B 0 7 AmeriGlide Atlas Vertical Platform Lift (Commercial) Minimum Charge for Excavation Work Concrete Pour Brickwork ADA Compliant Railing (Stain Grade Pine) Overall Labor 3 ½” Pine Stair Baluster, Fluted Installation of fiberglass screen Remove for Work, then Reinstall Removal of Refrigerator 24 to 29 cf of Capacity Refrigerator /Freezer (High Grade) Removal of Oven Dishwasher, Space-saver Under-sink Replace (High Grade)x2 Prime Drywall (96 sf) Paint Drywall-2 Coats (96 sf) Restaurant-Style Gas Range (High Grade) 24 to 29 cf of Capacity Refrigerator /Freezer (High Grade) Bathroom sink plumbing Toilet Plumbing Interior Framed Wall (12’ tall 16” on center 7’7” long) Installation of Drywall (96 sf) Prime Drywall (96 sf) Paint Drywall-2 coats (96 sf) Mask Door Opening (Large) Red Label Cedar Shingles, 16” (Royals) 21 sq Prime Exterior Shingles (21 sf) Paint Exterior Shingles-3 coats (21 sf) Remove Door for Work, then Reinstall Interior Door Lockset (Deluxe Grade) Wall-hung Vitreous China Sink-Oval Toilet (High Grade) Soap Dispenser (Standard Grade) Toilet Paper Dispenser (Standard Grade)

Craft @Hrs Unit Materials Labor

Total

$8,185.72 6E@5.06 --- --- 1C@.098 --- 1C@1.35 1C@1.6 ea 1C@.862 1D@.794 2A@.813

$8,185.72 ea $345.00 --- 31.5 Sf Lf$345.03 --- lf$1,628.06 $52.95 ea $10.00 ea --- ea $1,860.00

$228.00 --- --- $379.22 $6,000.00 $2,587.44 $75.79 $40.74 $25.22 $34.34

$573.00 $2,000.00 $5,000.00 $724.25 $6,000.00 $4,215.50 $128.74 $50.74 $25.22 $1,894.34

1D@.505 2A@2.63

ea --- ea $1,490.00

$16.60 $221.16

$16.60 $1,711.16

5F@.006 5F@.010 7P@2.88 2A@.813

sf $13.44 sf $21.12 ea $6,700.00 ea $1,860.00

$26.88 $44.16 $149.38 $34.34

$40.32 $65.28 $6,849.38 $1,894.34

7P@7.69 7P@6.21 6C@.244 6D@.041 5F@.006 5F@.010 3L@.364 6R@2.86 5F@.016 5F@.033 1C@.151 1C@.405 7P@.878 7P@1.33 1C@.182 1C@.188

ea $169.00 ea $214.00 ea $85.47 sf $63.36 sf $13.44 sf $21.12 ea $2.18 sq $63.20 sf $5.88 sf $11.76 ea --- ea $82.20 ea $394.00 ea $309.00 ea $20.10 ea $32.60

$399.64 $568.64 $323.01 $537.01 $77.69 $163.16 $107.52 $170.88 $26.88 $40.32 $44.16 $65.28 $10.48 $12.66 $26.38 $89.58 $15.54 $21.42 $32.13 $43.89 $7.13 $7.13 $19.11 $101.31 $45.63 $439.63 $69.16 $378.16 $8.59 $28.69 $8.89 $41.49


Land Cost Building Cost Total Acquisition Cost Rehabilitation Cost Total Square Feet Per Square Foot Cost Total Rehab Cost Soft Cost (7%) Total Project Cost

$243,000 $371,000 $625,000 2,882 square feet $15.92 $45,886.84 $3,212.07 $674,098.71

Preliminary Calculations

Depreciation Amount to be Depreciated Recovery Period Annual Depreciation Deduction 1st Year Mortgage Interest

Total Monthly Cost for Acquisition and Adaptive Rehabilitation

$168,128.49 39 Years $4,310.98 $28,451.40

$2,370.95

HISTORIC PRESERVATION

Acquisition Cost


DESIGN ELECTRONIC

Revit

to

Ecotect

Rhino to Grasshopper to Photoshop


K R O B 1 0

Rhino to Showcase


K R O B 1 1

Vietnamese Restaurant

Waterfront Park, located in Charleston South Carolina, was devel-

Charleston, SC

oped after hurricane Andrew devastated the area. Now, the Park draws visitors with its large pineapple fountain. For this project, the challenge was to design a Vietnamese restaurant, being sensitive the local context as well as the Vietnamese Culture itself. My design is located on the pier, and has a main floor with privatized dining room, as the culture observes, as well as an open patio level on the second floor which maximizes the views out toward the water and back onto the City of Charleston.


7

PROCESS 1 12" = 1'-0"

R LOOKING BACK "

8

teaer 1 12" = 1'-0"

teaer 1 12" = 1'-0"

RESTAURANT.CHARLESTON

8


LIGHTNING CAR MUSEUM


K R O B 1 0

The Lightning Car

The Lightning Car Company is an electric luxury sports car that is

Savannah, GA

making waves in the automotive world. For this project, the goal is showcase the car’s technology while having the opportunity to branch out programmatically to attract a wider range of cliental. For my design, the space will serve as a showroom for the Lightning Car, as well as a interior and exterior restaurant for locals in the area as well as a museum space to tell the history of vehicles from the United States and around the world. The form responds to both the surrounding context and function of the building. Holding strong to the Savannah grid, the form begins to become dynamic, and breaking away to interact with the curvilinear form of the car.


COMEDY HALL OF FAME

K R O B 1 5

The American Comedy Hall of Fame is intended to be a Sig-

hibition space as well as Inductee ceremonies celebrating the

nature Building for the Entertainment District in Los Angeles

men and women who have brought so much laughter to the

California. The structure, which will house the most Iconic

American people and the World.

and instrumental members of Comedy will serve the com-

The Design spirals out toward the entertainment in the sur-

munity as well as surrounding venues such as the Staples

rounding context. The central circulation encourages explo-

Center, in offering a Theater, Restaurants, Comedy Club, Ex-

ration and visually leads the visitor through the form.


K R O B 1 6

4

1

teaser interior 2 12" = 1'-0"

exterior teaser 2 12" = 1'-0"

2

teaser 1 12" = 1'-0"


K R O B 1 7

Main Street

Commercial Berm

Raised Commercial Zone

University Housing


K R O B BROUGHTON RONQUILLIO B L A K E

Restaurant

The goal of this urban environment is to create a connection between the natural and built environment by way of an elevated pedestrian path known as the “L-Way.� This system would allow for residents and visitors alike to venture through the protected wetlands that

Interior Atrium

exist on the site and weave through the city, allowing the pedestrian to travel above the car, which also allows for an elevated commercial program. The overall development contains: 729 Residential persons, mixed use: 12,360 residential and 1.06 Million Sq. Ft. Mixed-Commercial, and 3.7 Million Sq. Ft. Commercial, Which will include a University with Apartment Style housing located throughout the Urban plan.

Market and Gym Deck Interactive Interior

University.Housing

TEAM MEMBERS


K R O B 1 9

3

2

1 4

1

5

6 7

5

8

9


U

4

6

7

8

B

3

R

2

Hunter’s Point South, approximately 30 acres of prime real estate in Long Island City,

K R O B M I L L E R P A R K E R

Queens. The proposed development will offer a patchwork of program, allowing the area to have a more natural and sustainable existence. Beginning with a celebrated

A

PatchWork Development

Entrance into a Green Space, an Amphitheater and Retail Zone, an Industrial residential zone, and ending with a High Rise and Ferry Terminal. As a team, we each designed a portion of the site, I developed the Park and transition space which lead into the retail zone. I also was responsible for the vignettes which created the perspectives that depict the patch-work concept we developed for the site.

N


Thank you for your time and consideration. www.issuu.com/AshleyKrob krob.ashley@gmail.com 559.301.6835



Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.